To import and export content data for firmware, use the Admin center in OT Asset Workspace with the required role and content service prerequisites enabled. Import a firmware content ZIP to apply content updates, or export on-premise OT firmware data and share the ZIP with the Content Service team to improve normalization.
Prepare the workspace and firmware content prerequisites
This workflow concerns firmware embedded in on-premise operational technology assets. It gives asset teams a route to exchange content used for normalization, including information about custom or partially normalized firmware. Start by deciding whether you need to bring content into the instance or collect existing content for the Content Service team. That decision determines which workspace page you use.
The import and export actions require the sn_otam.ot_asset_manager role. They take place in OT Asset Workspace, which requires the OT Asset Management application to be installed on the ServiceNow instance. Before either action, check these prerequisites:
- The sn_itam_common.onprem_content_import_export system property is set to true.
- The instance has opted in to the Enterprise Asset Management Content Service.
- The Custom Firmware Models KPI is enabled.
The OT Asset Workspace requires the OT Asset Management application to be installed on the instance, and the Content Service opt-in has its own setup instructions. Complete that opt-in before you test either procedure, so that a failed import is not mistaken for a feature that was never switched on.
Opting in is done from Enterprise Asset Workspace > Admin center > Normalization opt-in, and it needs the sn_eam.enterprise_admin role. That role is separate from the sn_otam.ot_asset_manager role used for the import and export procedure, so the person who opts in and the person who runs the transfer may not be the same. After you read the Opt-in Agreement, select its check box and select Opt-In, the Custom Firmware Models KPI is enabled automatically.
Opting out reverses that. The Custom Firmware Models KPI and the related KPIs are disabled, and your company stops contributing to the improvement of normalization. It still receives incremental content updates that the Content Service team builds from other sources, and it can rejoin at any time.
Record the state of those prerequisites before starting. A missing workspace, a disabled property, and a content service setup issue are different investigation paths. Checking them separately shows which investigation path applies, because a missing workspace, a disabled property and a content service setup issue each need different action. The role above applies to the firmware import and export procedure; arrange prerequisite configuration with the appropriate instance administrator.
Check the workflow against your instance and release before using it. Keep a short working record with the instance, intended direction of transfer, responsible asset manager, and reason for the exchange. For example, an export might support a review of firmware models that remain partially normalized after your team has examined their source descriptions.
Import and export content data for firmware in the right sequence
Open All > OT Asset Workspace > Admin center. The Admin center navigation separates the two operations under Manage library. Use Import firmware content when bringing a content package into the instance. Use Export firmware content when preparing the instance’s firmware content for download and sharing.
Agree on the purpose of the transfer before someone operates the controls. An incoming package and an outgoing package may both be ZIP files, but they occupy different points in the content exchange. Keep their filenames and working notes distinguishable so a colleague can tell which package was received and which was generated from the instance.
For teams familiar with general data loading, the broader guide to data migration and import sets provides context for planning data movement. The firmware task itself follows the dedicated workspace controls described here. Keep its evidence and acceptance checks tied to that specific workflow.
Upload a firmware content package and run the import
Have the ZIP containing the firmware content data ready before opening the import page, and confirm it is the package intended for this exchange rather than another file received around the same time.
- In the Admin center navigation, open Manage library > Import firmware content.
- Select the Attachments icon on the Import page sidebar.
- In the Attachments window, choose Select a file.
- Find and select the ZIP containing the firmware content data.
- Choose Upload in the Upload a file dialog box.
- After that dialog closes, select Run Import on the Import page.
Treat uploading and running the import as separate checkpoints. A file chosen from your computer still needs to pass through the upload action, and the import is initiated through Run Import afterward. When reviewing what happened, establish which checkpoint the operator reached before investigating later processing.
After a successful import, OT Asset Management automatically triggers the EAM – Apply latest content changes scheduled job. That job processes corresponding content updates so they can be used to normalize firmware. Include this processing stage in your handover record; a report that a ZIP was attached does not establish that the subsequent content processing has been checked.
The OT Asset Management application triggers that job automatically, so the operator’s part of the procedure ends at Run Import. The processing that follows is a separate stage, and its content updates are what you use to normalize firmware.
Choose a small review set of affected firmware records before the work begins. After processing, compare their content against the issue that prompted the import. Record what changed and what remains unresolved. This is a review recommendation, rather than a promise that an imported package will resolve a particular model or version.
Export firmware content for the Content Service team
An export lets you share custom or partially normalized firmware with the Content Service team. The content can also cover firmware versions, firmware models, and firmware life cycles. Describe the normalization problem alongside the package so the recipient has context for reviewing the data.
- From the Admin center navigation, open Manage library > Export firmware content.
- Select Run Export.
- Wait for the application to prepare the ZIP. The page reloads automatically when the download is ready.
- Select the Attachments icon on the Export page sidebar.
- In the Attachments window, select the Actions icon for the ZIP you intend to download.
- Download the ZIP and send it to the Content Service team.
The export can also include firmware versions, firmware models, and firmware life cycles alongside custom or partially normalized firmware, so decide before you run it which of those the Content Service team needs to see.
The application compresses the firmware content data into a single ZIP. If several attachments are present, identify the intended file before downloading so that an earlier package is not mistaken for the current handoff.
Before sharing, follow your organization’s data review and transfer process. Include a concise description of the affected firmware, the normalization concern, and the question you want resolved. Avoid promising a resolution date or assuming that sending the package immediately changes normalization results.
Keep the firmware content ZIP as the only artifact for this exchange, and list any reporting extracts separately in the handoff notes.
Check the outcome and investigate the correct stage
Use a staged review when the result is unclear. First establish whether prerequisites and access were ready. Next establish whether the selected operation ran. Finally examine the resulting package or imported content processing. This ordering reduces the chance of treating an access problem as a data quality problem.
- Workspace access: confirm OT Asset Management is installed and the operator has the role required for the import and export procedure.
- Feature readiness: recheck the system property, content service opt-in, and Custom Firmware Models KPI.
- Import progress: distinguish file selection, Upload, Run Import, and the processing that follows a successful import.
- Export handoff: distinguish Run Export, the automatic page reload, the chosen attachment, and delivery of the downloaded ZIP.
Note which window or dialog was open when a problem appeared, since the Import page, the Attachments window, and the Upload a file dialog box are separate points in the procedure.
Capture the observed stage and any displayed message without guessing at its cause. Where investigation expands into a wider data loading issue, the data migration and import troubleshooting guide can help organize that separate investigation.
Give the asset manager and administrator a shared acceptance record: package identity, operation performed, processing reviewed, and unresolved firmware examples. Agree who will follow up with the Content Service team and who will assess any subsequent content changes. This keeps operational completion separate from the decision that the original normalization concern has been addressed.
For help planning this work, see ServiceNow implementation.
If normalization still needs attention, keep the concrete firmware examples so the next review starts from observed data.