To track a hardware asset shipment, open Hardware Asset Workspace, go to Asset operations, choose Shipments from the Shipment list, open the shipment, and select Track now. The shipment must be undelivered and its carrier linked to an active integration profile. Review the carrier status and pickup and delivery dates returned.
Check whether the shipment is ready for tracking
Start with the shipment you need to investigate, rather than with the asset’s general lifecycle state. Shipment tracking answers a narrower question: what information has the shipping carrier returned about this movement? A laptop being assigned to an employee does not, by itself, tell a receiving team where its package is.
Two conditions govern this workflow. The shipment has not been delivered, and the carrier associated with it has an active integration profile. Treat these as separate checks. An undelivered shipment can still need integration attention; an active carrier connection does not establish that the selected shipment is the correct one.
Before attempting a refresh, compare the shipment against the movement the requester described. As a working practice, establish which shipment the requester means and who is waiting for it. This reduces the chance of returning a convincing carrier update for a different delivery.
For the tracking procedure, the listed role requirement is inventory_user (read) or inventory_admin. Keep that requirement tied to this action. It does not establish permission to create or change an integration profile. If access needs investigation, give the administrator the action and workspace location you were attempting.
Check the workflow on your instance and release before incorporating it into a team runbook. For orientation within the surrounding workspace, see using Hardware Asset Workspace.
Track a hardware asset shipment from Asset operations
Use the shipment record as the starting point for the carrier request. Keep the record open while interpreting the result so that the response remains attached to the shipment being discussed. The navigation and action are:
- Go to All > Hardware Asset Workspace > Asset operations.
- In the Shipment list, choose Shipments.
- Open the shipment record you intend to track.
- Select Track now.
- Review the carrier information on the Shipment details form.
A disciplined check has a question behind it. For example, the receiving team may need to know whether the carrier has picked up the shipment, or the requester may be asking whether delivery has occurred. Decide what you need to establish before interpreting the returned fields.
As an operating practice, note the values visible before you select Track now and compare them with the result afterward. This gives you a clear basis for describing whether anything changed. Avoid telling a requester that a new event occurred simply because someone ran the tracking action again.
If several people are investigating the same shipment, nominate one person to consolidate the findings. A shared account of the record reviewed, the observed values, and the remaining question is easier to act on than several separate messages saying that tracking was checked.
Read the carrier fields as separate pieces of evidence
The Shipment details form presents tracking information received from the carrier in three fields: Carrier status, Carrier pick-up date, and Carrier delivered date. Read them together, but preserve the meaning of each field when communicating the result.
- Carrier status: use the returned status wording when describing what the carrier reports. Avoid replacing it with a stronger conclusion.
- Carrier pick-up date: inspect this field when the question concerns collection. A requested dispatch date is a different piece of information.
- Carrier delivered date: inspect this field when reconciling a carrier delivery report with the destination team’s account.
For example, if a requester asks whether equipment is ready for use, a carrier update alone is too narrow to answer the full question. Ask the destination team to establish physical receipt and any remaining receiving work. Keep that follow-up separate from the carrier observation so the requester understands what has been established.
Similarly, a blank date should prompt a specific follow-up rather than an invented explanation. Record that the field is blank. Do not turn the absence of a visible date into a claim that the package was lost, that pickup failed, or that delivery could not have happened.
When the next task concerns goods arriving at a stockroom, continue with stockroom management and hardware receiving. Shipment visibility and receiving work need a coordinated handoff.
Separate a carrier connection problem from a shipment question
If tracking does not provide the information needed, investigate the eligibility conditions before drawing a conclusion about the package. Start by checking that the selected shipment is undelivered. Then have the responsible integration owner verify that its carrier is associated with an active integration profile.
Distinguish the carrier record from the integration profile in the discussion. The requirement is an association with an active profile. A carrier name on its own does not demonstrate that this condition is satisfied. Ask for confirmation of the association and profile activity rather than a general statement that the carrier exists.
Prepare a concise handoff for the integration owner: identify the shipment, describe the action attempted, list the carrier values observed, and explain what information is missing. If another shipment is being used for comparison, make that comparison explicit. A successful result elsewhere does not settle the condition of this shipment.
Do not prescribe configuration changes from a tracking symptom alone. The tracking procedure establishes the dependency, but it does not identify the cause of an incomplete response. Keep changes with the person responsible for the integration and provide evidence that helps that person investigate.
For the wider connection design, see hardware asset management integration patterns. For help planning this work, see ServiceNow implementation.
Turn the result into a clear operational handoff
A tracking check should finish with an accountable next step. As a suggested team practice, distinguish three outcomes: the returned information answers the request, a receiving colleague needs to reconcile it with the physical delivery, or the integration owner needs to investigate the connection. Assign the unresolved question to the person who can answer it.
Keep the message factual. State which shipment you reviewed, what the carrier fields showed, and what still needs confirmation. If a date is absent, say so directly. If the carrier reports delivery but the receiving team has not located the equipment, preserve both observations instead of selecting one as the complete answer.
For procurement discussions, connect the shipment investigation to the relevant purchasing context through ServiceNow purchase orders. This helps keep an order question from becoming an unsupported conclusion about a specific package.
Before closing the inquiry, check that the requester can distinguish an observed carrier result from a proposed follow-up. A short, precise response is more useful than copying unrelated asset details into the conversation. Retain enough context for the next colleague to continue without repeating the initial investigation.
Questions about shipment tracking handoffs
What should a team agree before assigning shipment inquiries?
Agree who answers the requester, who checks physical arrival, and who investigates the carrier connection. These are suggested responsibilities for the operating process. Assigning them ahead of an urgent inquiry reduces ambiguity about who owns the next response and who supplies supporting evidence.
How should an unresolved inquiry be passed to another shift?
Use a brief handoff that names the shipment, summarizes the observation, and identifies the open question and its owner. Include enough context to explain why the inquiry remains open. Avoid a bare instruction to check tracking again, which leaves the next person without a reason for repeating the work.
What makes a shipment tracking runbook easier to maintain?
Keep the navigation steps separate from the team’s escalation contacts and communication expectations. Review those operational responsibilities when staffing changes. A runbook is easier to maintain when a change in ownership does not require rewriting the explanation of the carrier fields.
How can training cover ambiguous carrier results?
Use a hypothetical case in which the requester asks for a delivery commitment but the available information does not support one. Have the trainee write a response that states the observation, avoids guessing, and assigns a follow-up. Judge the exercise by clarity and evidence rather than confidence of tone.
What belongs in a request for process improvement?
Describe the recurring decision that teams struggle to make, such as deciding who investigates a missing carrier date. Include an example of the information available and the point where ownership became unclear. Propose a clearer handoff or response standard before requesting additional automation. This keeps the improvement tied to a measurable operational problem without assuming that a new integration or another screen will resolve it.