OBLYTECH Logo
OBLYTECH Logo

Add compatible and substitute models to a hardware model

To add compatible and substitute models to a hardware model, open the model record and use Add Compatible or Add Substitution. Compatible models describe hardware that works together; substitutes identify replacement choices. Enterprise model substitutes are managed separately, through the Substitutes tab in Enterprise Asset Workspace, with different permissions and selection rules.

Choose the relationship before changing the model

Start with the decision the relationship must support. Compatibility answers whether hardware models can work together. Substitution answers whether another model can fill the requirement represented by the original model. A device that connects to another device is not necessarily a replacement for it. Treating those decisions as interchangeable makes the catalog harder to trust.

For example, a team might evaluate whether a docking device works with a particular computer model. That is a compatibility question. Evaluating an alternative computer for the same requirement is a substitution question. These are illustrative decisions: the relationship should reflect your team’s actual technical assessment, rather than similarity between model names.

Before editing, write down the starting model, the proposed related model, and the reason for connecting them. Identify whether you are working with a hardware model in Product Catalog or an enterprise model in Enterprise Asset Workspace. The record type determines the route and controls you use.

Agree who owns those decisions through your hardware asset management governance model. A model manager can record a relationship, but the team still needs an accountable person to decide whether the proposed pairing meets the operational requirement.

Prepare the records and action-specific permissions

Adding compatible models to a hardware model requires model_manager. Adding substitute models through the hardware model procedure also requires model_manager. For adding substitutes to an enterprise model, the listed role requirement is sn_eam.enterprise_admin or sn_eam.enterptrise_asset_manager. Check these action-specific requirements with your access administrator before beginning.

Confirm the identity of both records before selecting them. Similar names can conceal a different product variant or a duplicate catalog entry. Where model data needs attention, address that through hardware model normalization configuration before building a larger set of relationships around uncertain records.

Hardware models included in bundled models cannot be added as compatibles or substitutes. Include bundle membership in your preparation checks, rather than discovering the restriction after planning a series of updates. Enterprise substitute eligibility has separate conditions, covered below.

Check the navigation and form behavior on your instance and release before scheduling broader work. Start with a small, reviewed set of relationships so another team member can verify both the record selection and the intended meaning before you continue.

Add compatible models to a hardware model

Use this procedure when the relationship describes hardware that can work together. Keep the starting model visible in your work notes so the relationship is attached to the intended record.

  1. Navigate to All > Product Catalog > Product Model > Hardware Models.
  2. Open the record by selecting its Name.
  3. Select Add Compatible.
  4. Choose the compatible model.
  5. Select Submit.
  6. Inspect the Compatibles related list for the selected model.

The resulting list is your immediate verification point. Compare the selected entry with the model you intended to add, rather than treating completion of the form as sufficient evidence. Reopen the starting record during review and check that the relationship is visible there.

Keep the technical basis for the compatibility decision available to the people maintaining model data. For a proposed hardware pairing, that might mean recording the tested configuration in your team’s change or review record. This is a recommended review practice, not an additional form step or a claim that ServiceNow performs the technical test.

If the expected entry is missing, first check which starting record you opened and which related model you selected. Then review whether the candidate is included in a bundled model. Avoid creating another model simply to get past a selection problem; resolve the identity or eligibility question first.

Add hardware substitutes and verify the direction

Hardware substitutions are directional. Treat the starting model as the requirement and the selected substitute as the alternative that can satisfy it. A decision that a higher-capacity device can replace a lower-capacity device does not establish the reverse relationship. Review the operational requirement before accepting either direction.

  1. Navigate to All > Product Catalog > Product Model > Hardware Models.
  2. Select the Name of the hardware model that needs alternatives.
  3. Select Add Substitution.
  4. In the Collection list on the left, double-click the hardware model to add.
  5. Verify that the chosen hardware model appears in the List on the right.
  6. Select Save.
  7. Check the Substitutes related list on the starting model.

Read the saved relationship as a complete sentence during review: the selected alternative can substitute for this starting model. That small check helps catch a relationship entered from the wrong record. If the team also needs the reverse direction, evaluate that requirement separately instead of inferring it from the first entry.

Substitute models can be used with work management transfer orders. They are not used in procurement part sourcing. This boundary matters when a buyer or fulfillment team expects a saved substitute to change another process: validate the consuming process before promising that the catalog relationship will affect its choices.

For help planning this work, see ServiceNow implementation.

Set substitute models on an enterprise model record

For enterprise models, use the enterprise record’s Substitutes tab. Do not carry the hardware model button names into this workflow. The enterprise selection dialog also applies eligibility conditions that should be checked before you prepare a candidate list.

  1. In Enterprise Asset Workspace, open the Enterprise model management view.
  2. Select All enterprise or the tab for the relevant model category, such as Construction.
  3. Open the enterprise model that needs substitute models.
  4. Open its Substitutes tab and select Add.
  5. In the Add model substitute dialog box, select the check box for each intended model.
  6. Select Add to close the dialog and return to the Substitutes tab.
  7. Select the Refresh list icon to populate the newly added entries.

The dialog displays enterprise models with the same Asset tracking strategy as the starting enterprise model and a State other than Build. When a proposed alternative is absent, compare those two attributes first. A matching name or similar purpose does not establish that it meets the selection conditions.

Do not change a model’s tracking strategy or state merely to make it selectable. Ask the model owner whether those values accurately represent the model. If the underlying data is wrong, handle that correction as its own reviewed decision before returning to the substitute selection.

After refreshing, compare the displayed entries with the candidate list you approved. Check for an omitted selection as well as an unintended addition. Keep the enterprise verification record distinct from your hardware model checks so reviewers can see which procedure and eligibility rules applied.

Review the result before operational handoff

A completed update should have a clear starting record, the intended related model, the correct relationship type, and a visible saved result. Ask a reviewer to check that combination. A list containing the expected name can still represent the wrong decision if the update began from another model.

Use a short handoff record containing the following items:

  • The starting model and the related model selected.
  • Whether the relationship records compatibility or substitution.
  • The reason the pairing was accepted and who reviewed it.
  • The related list or tab checked after saving.
  • Any unresolved eligibility or downstream process question.

Connect ongoing ownership to your IT asset lifecycle management governance model. Reassess approved relationships when the requirement or technical assessment changes, and give fulfillment teams a clear route for reporting a relationship that no longer meets their needs.

Questions about maintaining model relationships

Should reviewers approve a whole product family at once?

Prefer a review tied to identifiable model pairs. A family-level decision can hide differences between variants. If you use a family assessment as supporting material, identify which exact records it covers before someone enters the relationships.

What should a team do when technical reviewers disagree?

Leave the proposed relationship pending in your review process until the disagreement is resolved. Capture the competing requirements and ask the accountable model owner to decide. Entering an uncertain pairing makes it harder for later users to distinguish an approved decision from a suggestion.

How should existing relationships be reviewed after a model cleanup?

Prepare a list of affected model pairs and compare it with the records retained after cleanup. Have the relationship owner confirm the intended pairings. Treat the review as a data maintenance task with explicit acceptance criteria, rather than assuming earlier decisions still refer to the intended records.

What makes a relationship review ready to close?

Agree on closure criteria before work starts: the intended pairs are recorded, a second person has checked the saved results, and unresolved questions have an owner. Keep the decision record accessible to the people who will maintain the models afterward.