OBLYTECH Logo
OBLYTECH Logo

SAM Professional Software Model Field Reference

A software model in Software Asset Management Professional connects purchased rights with software discovered on your devices. This reference covers the fields on each record, what they control during reconciliation, and which settings change a result. Use it when a match looks wrong, a field is blank, or a warning appeared on save.

How the four record types connect

A software discovery model is created during discovery whenever a version of software is found. Normalization standardizes its publisher, product, version and edition. A software entitlement records the rights you bought, identified by a publisher part number (PPN). The software model sits between them and describes the product and version that the entitlement and discovery models point to. Each software installation links back to its discovery model.

Record What it holds How it is created
Software discovery model Discovered and normalized product details Automatically during discovery
Software model Product definition, matching conditions, licensing options From a PPN entered on an entitlement, or by hand
Software entitlement Rights, license type, cost, validity dates Manually or by bulk import
Software installation One install on one configuration item From discovery

A model can match many discovery models. A model defined with version starts with 10 matches installs of 10.1 and 10.2, and each install creates its own discovery model that maps to that one model.

Software model fields that control matching

The display name is built from publisher, product, version, edition, platform and language. Platform and language are appended when they are set to something other than Anything.

Several fields drive matching. Version condition and Edition condition accept starts with, is or is anything, and Version condition defaults to is anything. The discovery map is a saved set of conditions that decides which discovery models map to the model. Purchased rights apply to discovery models that meet that condition. The Suite defined field marks a discovery model as a suite parent when set to Yes.

Changing the discovery map on an existing model has side effects. Downgrade rights tied to the old map are removed and those of the new map are added. An entitlement with Agreement type set to Generic keeps its downgrade rights unchanged. Open the Show Matching Discovery Models link in SAM Classic, or the Matching Discovery Models related list in the Software Asset Workspace, to see what will match.

Selecting a discovery map with 50 or more suite components can trigger a warning that many underlying software models will be created. Treat it as a prompt to validate the new suite children before you rely on the numbers.

Condition fields that narrow reconciliation

Software install condition limits which installs count. Installs that fail the condition are still reconciled, but they usually show as unlicensed unless another model accepts them. Visual Studio used in a non-production environment is a typical case: each component model needs its own condition. Subscription condition does the same for subscription-based and hybrid models, for example limiting a count to one location or department.

In SAM Classic, Add Filter Condition requires the rules to match together, and Add OR Clause accepts a match on any one of them.

The License under management check box decides whether a model enters reconciliation. It is selected by default and also set on upgraded models. Clearing it removes the model from results. On a model with install or subscription conditions, clearing it excludes the matching installs or subscriptions instead.

Certified is selected automatically when the enterprise architect has marked the product approved in the TRM library. A model for an unapproved product is designated restricted, and reconciliation flags its installs as removal candidates. A nightly scheduled job creates removal candidates for restricted software.

Licensing, lifecycle and suite settings

Reconciliation considers licensable products. A model whose Product type is Child, Driver, Patch, Not Licensable or Unknown will not feed a license position.

Suite inference can be set to Number, a fixed count of installed components, or Percent, a share of them. New software models default to the Number inference option, which sets how many installed components are needed to infer a suite. Percent sets the share of components instead.

The Software Product Lifecycles tab stores support dates for each version. Lifecycle type is Internal, meaning a date set by your own policy or contract, or Publisher, meaning a vendor date. Risk ratings run from Very High, High and Moderate down to Low and None. Phases include Pre Release, General Availability, Upgrade (Internal lifecycles), End of Support, End of Extended Support and End of Life. For Microsoft products, check the support dates against Microsoft’s published lifecycle policy before relying on them.

The Override License Costs tab replaces the calculated true-up cost when you enter a License Cost or a License & Maintenance Cost. If both are blank, the entitlement cost is used. For SaaS licenses, the license cost is the figure used.

Entitlement fields that set purchased rights

The Publisher part number field reads from the Software Product Definitions lookup list. If a model already exists for that PPN, the Software model field fills in. Otherwise the model is created from the entitlement form. A warning appears when the PPN is not linked to the publisher and product on the model.

Agreement type drives downgrade rights. Enterprise License Agreement (ELA) and Unlimited License Agreement (ULA) set the status to Compliant, even when unlicensed installs exist.

License type includes Perpetual, Perpetual + Software Assurance, Software Assurance, Subscription, Step-up, Subscription Step-up, Add-on and From SA. For SaaS entitlements the defaults are Subscription for license type and User Subscription for license metric.

Cost follows from the rights. Total cost is calculated from the unit cost and covers the full subscription period. A monthly subscription running two months at a unit cost of 1 for 100 rights totals 200, yet the SaaS consumption spend in License Metric Results counts the current period, which is 100 in this example.

For Microsoft Per Core and Per Core with CAL licenses, Purchased rights is Rights per license pack multiplied by Number of packs. Allocations available equals Active rights minus the total of allocation quantities.

A new entitlement starts in the Build state and moves to In use when published. Setting it to Retired reduces Active rights to 0. Active maintenance is selected automatically while subscription, Software Assurance or maintenance is active.

From the Brazil release, the Database option column no longer exists in the software entitlement and override cost tables.

Reading the license metric results

The License Metric Results form summarizes the position for each license metric. Rights owned adds the active rights of entitlements sharing a metric. Rights used counts rights allocated or installed. Rights available equals owned minus used. Over-licensed amount is the estimated cost of unused rights, which is usually the figure that points to recoverable spend.

A model with a perpetual Software Assurance entitlement and a subscription entitlement produces two results, split by whether active maintenance is true or false. Compare them before acting on a combined total.

Discovery, normalization and installation fields

Normalization status reads Normalized, Partially Normalized, Publisher Normalized, Match Not Found, Manually Normalized or New. A caution icon opens the normalization suggestion for that record.

Normalization compares discovered values with the suggested values in the Content Service. Manually normalized records generate suggestions in the weekly process, which you can accept or reject. A property enables automatic acceptance when suggested values match your manual ones, and it is enabled by default.

The Software Component Model table is created from normalized versions. Its granularity property accepts MAJOR, FULL, BOTH and NONE, with BOTH as the default, entered in lowercase. Two records appear when both a full and a major version exist.

Duplicate installs can appear when software upgrades, incomplete removals or several discovery sources create more than one record for the same product on a device. Deduplication designates one record as the primary installation and marks the others as duplicates.

Software reclamation covers installs you want to recover. Removal candidates move through a workflow, and from the Zurich release, the reclamation workflow can also be completed using the Software Reclamation Flow in Flow Designer, with additional error handling features. Suite products are reclaimed at user level with one removal candidate for the suite. Setting an asset to Retired or Missing removes its installation and creates no removal candidate.

Software EOL request fields

An EOL request tracks a product reaching end of life. Its Stage starts at Draft and moves through Open, Analysis, Action initiated, Completed or Cancelled. Action initiated offers Pending, Remove EOL software, Upgrade, Purchase support, Move to Azure and Accept risk.

Frequently asked questions

Why does a matched install show as unlicensed?

The install may fall outside an install condition on the model. Check the condition, then review the matching discovery models from the model record.

What happens when I change a discovery map on an existing model?

Downgrade rights tied to the old map are removed and those for the new map are added. Generic agreement types keep their downgrade rights.

Why is a model missing from my results?

Clearing License under management removes the model from reconciliation. Confirm the check box is selected and the product type is licensable.

Why does one discovered version match a broader model?

The model’s version condition decides this. A condition of starts with 10 matches 10.1 and 10.2, creating two discovery models that both map to one software model.