To install and configure SAM Professional, pick the Product Hub or the ServiceNow Store for the application, run the guided setup, install the SAM Admin Experience application, then configure each module in the Configuration Console. Check roles and entitlements at each stage. For the wider rollout sequence, see the implementation roadmap.
Choose the installation route for your instance
The Product Hub is the usual route for a first-time install because it applies default configuration as it goes, and it is available from Australia Patch 7 onward. The ServiceNow Store route suits teams that want to skip the guided flow, and it is also the route when the instance lacks the Setup Hub or Otto for Setup application.
| Route | Use it when |
|---|---|
| Product Hub | A first-time install that should follow a guided flow |
| ServiceNow Store | You want to install without the guided flow, or Setup Hub and Otto for Setup are absent |
Confirm your entitlements first. The Product Hub also needs a companion application that matches your subscription. AI Native subscriptions use Otto for Setup (sn_ia). Non-AI Native subscriptions use Setup Hub (sn_ia_base). The installing user needs the admin role or the sn_ia_config.ia_admin role.
Run the Product Hub setup on a new instance
Go to Manage Platform, then Software Asset Management, and select Start setup. The Product Hub installs the core application and its dependent components, then applies default configuration. It moves through three steps: choose what to install in the app bundle, apply default configurations, and reach the ready-to-configure state. The Product Hub tracks progress on each step.
When the run finishes, the application appears on the Installed tab, and a Configure card opens the Configuration Console.
If the application is already installed, the page shows a manage view for reviewing components and applying updates instead of the setup option.
Move an existing setup with an update set
To move a configuration from another instance, choose Upload update set instead. Upload the batch update set as an XML file, preview the changes in a new tab, and then commit. Read the preview carefully, because the commit applies the whole batch.
To move a finished configuration out, package it as an update set file and upload it on the target instance’s Product Hub page, one XML file at a time.
Install the SAM Admin Experience application
After a Product Hub install, add SAM Admin Experience – v1.0 (sn_samp_admin) from the ServiceNow Store. The Configuration Console is not available without it, so treat it as a required install. Then return to the Admin Home page for Software Asset Management and select Configure.
Know which roles the console needs
Opening the Configuration Console requires the sam_admin role and the sn_ia_config.ia_user role. Some modules need more roles. Administrative tasks belong to sam_admin. The sam_user role cannot change administrative settings.
Work through the Configuration Console modules
The console groups setup into independent modules under three headings: Software foundations, Governance, and Data management. Modules and setup items can be configured in any order, and the Setup status section tracks overall progress.
For each module, follow this sequence:
- Go to Manage Platform, then Software Asset Management.
- In the Configure your product section, select Configure.
- Select a module in the Configuration Summary navigation menu.
- In the Setup status section, select Get started on a module card.
- Complete each setup item, then select Mark as configured.
Setup items depend on what is installed. When a dependent application is missing, its related items are hidden rather than shown as incomplete, so an item that seems to have vanished points to a missing application. Marking an item configured records progress, and you can change that status later.
The console also holds platform-level settings for content jobs, system properties and scheduled jobs. Scheduled jobs automate recurring work such as normalization, reconciliation and cleanup. On the first content job run, watch the status and completion to confirm the Content Service data finished loading, then check that the delta runs stay current.
The Software integrations module offers two kinds of tile. Single sign-on tiles create profiles that capture managed applications and their usage data. Direct connection tiles cover supported SaaS providers and pull subscription, activity and usage data into license management.
AI assistance can configure content service setup, groups and users. Its suggestions are based on your instance data and may not be accurate, so review each one before you apply it.
Install the Guided Experiences application
The Guided Experiences application, sn_sam_playbook, adds step-by-step guidance for daily software management tasks. Activate the Software Asset Management Professional Master Workspace plugin, com.sn_samp_master_ws, first. It activates the Professional plugin and the Software Asset Workspace application in one step. Installing Guided Experiences requires the sam_admin or sam_user role.
Find the application under All, then System Applications, then All Available Applications. Review its dependencies in the installation dialog and install any missing plugin or application first. Demo data is optional. It consists of sample records for common use cases, and it suits a development or test instance during the first install.
Activate the Professional plugins and check their roles
The Professional product requires its own subscription and includes demo data. Activating it installs roles, plugins and scheduled jobs. To list the scheduled jobs it added, filter the Scheduled jobs page on names that start with SAM.
| Role | What it allows |
|---|---|
| sam_admin | Full access, including entitlement imports, reclamation rules, reconciliation, custom products and Content Service setup |
| sam_user | All features except administrative ones |
| sam_developer | Script writing on the platform, intended for trained ServiceNow administrators |
| sam_integrator | Creating and managing SaaS integration profiles |
| sam_spend_import | Importing financial transaction data into Spend Detection |
Publisher pack add-ons extend reconciliation for Adobe, Citrix, IBM, Microsoft, Oracle, SAP, VMware and Engineering Applications. SaaS License Management is requested separately from the ServiceNow Store as sn_sam_saas_int and needs the Professional plugin.
Licensing has one detail to plan for. The Client Software Distribution plugin enables installing and uninstalling software on devices. A Professional subscription covers uninstall, called reclamation. Installing software needs additional licensing.
If you connect Microsoft System Center Configuration Manager, note that the Microsoft SCCM 2012 v2 and 2016 usage plugins are marked for deprecation, so check their current status before building on them. For a first-time SCCM integration, install the Service Graph connector for Microsoft SCCM from the Store.
Migrate from the earlier Software Asset Management plugin
Moving from the ITSM Software Asset Management feature of Asset Management triggers automatic changes, and manual work follows. Table labels are renamed: Software License becomes Software Entitlement, and the user and device entitlement tables become User Allocations and Device Allocations. The Rights field on license entitlements is renamed Active rights, and its value moves to a new Purchased rights field.
Allocations also change. Each allocation takes the software model of its entitlement, and its quantity is set to 1 unless several allocations exist for the same user or device. Those combine into one record whose quantity is the count, and duplicate allocations are not allowed.
Some behavior is switched off. The license counter job is set to None, software counters are disabled, auto-match between discovery models and software models is deactivated, and the old navigation menu is renamed and deactivated.
Manual steps follow. Customized forms and lists for software models, entitlements, discovery models and installations may need to be overwritten by hand after activation, and certain fields on software models, entitlements and allocations need configuring. After the first install, run the Revert Customizations module in the Software Asset Management application to revert customized SAM files to the base system. You can also revert customizations from System Diagnostics, then Upgrade History. If you use Discovery, run the migrate software installations script after installation to copy previously discovered installation records into the table the Professional application uses. If you have used an earlier version of Software Asset Management with Discovery, skip the script, because Discovery writes new records to that table directly.
Confirm the setup with quick start tests
Quick start tests check that Software Asset Management still works after a change such as an upgrade or a custom application. Copy them and adjust them to your instance data. They need the Professional plugin, and some also need the Spend Detection, Microsoft, SAP, Oracle or SaaS plugins. Check the Job Results list next, under All, then Software Asset, then Administration. Each record shows a number, a name, a status, and created and updated times. The results show whether normalization and software usage import jobs completed, so read the status before moving on.
If you installed the engineering application, open Engineering license server under License operations in Software Asset Workspace. It lists each server’s name, type, status and last connection time. The list is empty until the engineering plugin is active.
Frequently asked questions
Which installation route should a new instance use?
Use the Product Hub for a first-time install. It applies default configuration and opens the Configuration Console from its Configure card. Use the ServiceNow Store route if you want to skip the guided flow or the instance lacks Setup Hub or Otto for Setup.
Why is the Configuration Console missing after the install?
The usual cause is the SAM Admin Experience application, sn_samp_admin, which the console requires. Install it from the Store. Also check the console roles, because sam_admin and the console user role are both required.
Can I copy a finished configuration to a second instance?
Yes. Package and download the configuration as an XML update set, then upload it on the Product Hub page of the target instance, one file at a time.
Should I apply the AI suggestions as they appear?
Review each one first. The suggestions draw on your instance data, and they may not be accurate, so check them against your organization’s requirements before applying them.
What happens to customizations when I migrate from the earlier plugin?
They are not carried over automatically. Customized forms and lists may need to be overwritten by hand after the Professional plugin is activated, and certain fields need manual configuration. Run the Revert Customizations module as part of the migration checklist.