OBLYTECH Logo
OBLYTECH Logo

Health Log Analytics Alert Remediation for Operators

When a Health Log Analytics alert arrives, the operator decides whether it matters, reads the log lines behind it, and teaches the system what to keep or ignore. Work from the Overview tab, order the queue by priority before severity, use feedback actions to cut noise, and track volume on the Operational dashboard.

Start each alert from its Overview tab

The Summary card names the identified issue, and the banner carries the alert information. The remaining sections answer the operator’s questions in order: what is affected, and what is driving it.

Section Card What it tells the operator
Summary Identified issue The issue behind the alert. Select Details for more information.
Summary Anomaly How current activity departs from the learned baseline.
Impact Configuration Items The CIs affected by the alert.
Impact Impacted services The services that carry the risk.
Cause Meaningful log properties The log property values that contributed to the anomaly.

The Anomaly card shows whether a spike is new. It plots recent activity against the expected baseline, the values from one day earlier, and the values from the previous week. The orange band marks the same hour one week earlier, so a spike that matches last week’s shape points to a recurring pattern. For tuning the anomaly side of the setup, see the ITOM anomaly detection tuning guide.

The Meaningful log properties card shows how each contributing property’s values are distributed. A bar’s length is that value’s share compared with all values for the property. If one host or one user account holds most of the share, that is where the investigation starts.

Read the logs behind the alert

For raw evidence, open the Surrounding logs tab in the Service Operations Workspace. The Surrounding logs tab lists log lines from one minute before the anomaly through a short period after it. You can change the time range to widen the window or move it.

The Log viewer tab charts how often anomalous log lines occurred in the minute before and after the alert, and lists the associated log lines. Rule building is covered in the setup and alert rule administration guide, so this page stays on the operator side.

Remediation from the Overview tab accepts the evt_mgmt_operator, evt_mgmt_user or evt_mgmt_admin role. For the workspace’s alert views in general, see the ITOM Service Operations Workspace guide to alerts and express lists.

Read priority before severity

Severity describes how serious the condition is. Priority group describes the order in which to resolve alerts, and it counts for more than severity alone.

Severity value Meaning in the alert record
Critical Immediate action required. The resource is not functional, or critical problems are imminent.
Major Major functionality is severely impaired, or performance has degraded.
Minor Performance has degraded, or there is a partial, non-critical loss of functionality.
Warning Attention is required, though the resource still functions.
Info An informational message. An alert is created, but the resource still works.
Clear or Resolved No action needed. Existing alerts close.

Priority group values run Urgent, High, Moderate and Low. A high-priority, low-severity alert should be handled before a low-priority, high-severity one, so sort by priority first and read severity within each band. For the broader routine of working an alert from open to closed, see the operator tutorial on working an alert to closure.

The State field shows where an alert sits in its life. A new alert is Open. Reopen means a closed alert needs attention again. Closed means it has been remediated. Flapping is the state to watch: identical events from the same source arrive at high frequency and push the alert back and forth between Open and Closed. In practice, a flapping alert that keeps reopening needs action to stop the same event recurring. Triage it again, run a remediation workflow where one fits, update the associated incident or KB article, and close the alert once the underlying issue is addressed.

The Node field holds the node name from the log message, often the associated CI, such as a computer name, IP address, FQDN or MAC address. The Metric name field names the metric whose anomalous behavior raised the alert, for example an I/O request that took longer than 15000 ms to complete.

Work the group, not just the single alert

A Log Analytics group holds the alerts that correlate with one another. The system groups alerts that share one or more of four relationships: time within a configured interval, metadata such as the same host, similar or identical message text, and a similar tendency in values or rates.

The Alerts in group card on the Overview tab, and its View all link, open the full list. The same list appears on the Related records tab. For how grouped alerts are handled and reviewed in the express list, see the guide to alert groups in the express list.

Each row shows a Group value, either a standalone alert or a Component-based alert. The Initial event generation time is ServiceNow processing time, not the source system’s time, so compare it with source log timestamps before reasoning about sequence.

Teach the system with feedback

Feedback tells HLA which alerts matter. The actions sit under the Apply ML feedback menu in the Service Operations Workspace. Mute, mark as significant and decrease sensitivity need the evt_mgmt_operator or evt_mgmt_admin role.

Action Effect
Mark as significant The alert is more likely to join a Log Analytics group when its metric behaves anomalously.
Mute alert metric For this source only, anomalous behavior for the metric no longer generates alerts.
Mute alert metric for all components The same effect across all components of the Application Service. A component can be several CIs that perform the same function.
Restore ML feedback Appears after an action. Returns the metric to normal importance.

Mark as significant and Mute ask for a confirmation, and processing can take a few seconds. Restore ML feedback also asks for confirmation. Muting needs care. For keyword and pattern severity metrics, the mute applies to the dominant pattern, the main pattern contributing to the anomaly. A muted metric stops generating alerts for that source, so a quiet feed can hide a real problem. Check the list of muted metrics before assuming silence means health.

Restore normal importance reverses these actions. It suits a metric that was muted, marked significant, or made less sensitive when the situation has changed. Decrease sensitivity to similar anomalies raises the threshold for generating alerts from future anomalies like the one that raised the alert. It is not available for customer alerts or new signal alerts.

When an alert is resolved but the next person needs context, add a knowledge base article to it. The article can carry extra information that might help resolve the underlying issue.

Reduce noise at the source

Lexical keywords such as “crashed” or “failed” are the simplest detector. Each lexical keyword has a count threshold. When the count in a source exceeds that threshold, the system identifies an anomaly and raises an alert. Keywords can be global, or created and deleted for a specific source type. For the separate suppression controls that sit in event rules, see the note on alert suppression thresholds in event rules.

Advanced log alert filters drop alerts that do not indicate a significant issue. A filter can be tested, updated, published or activated at any time while it is being built, so you can check its effect before relying on it. Log correlators work in the other direction, connecting alerts that share a key such as the same network interface ID. A correlator that links alerts you expected to be unrelated is a signal to review it.

Track alert volume on dashboards

The Health Log Analytics Operational dashboard uses Performance Analytics to monitor log data, alerts and error rates inside the Service Operations Workspace. The Overview dashboard it replaces has been deprecated. For the wider Performance Analytics picture in ITSM, see Performance Analytics for ITSM.

Dashboard or solution What it shows Status
HLA Operational dashboard Log data, alerts and error rates in the Service Operations Workspace Current dashboard
HLA Overview dashboard Earlier monitoring view, replaced by the Operational dashboard Deprecated
Platform Analytics Solution for HLA IT issues HLA predicted before users were affected, and money saved by preventing critical outages Current

Respond to system health notifications and proposed actions

HLA runs self-health checks on its core components, its data inputs, its log sources and the log ingestion process. When a check finds a system health issue, a notification names the problem and proposes an action, such as contacting ServiceNow support or reviewing a source type setting.

Read the notification and carry out the action it proposes. In practice, when the whole feed looks quiet, check the self-health notifications for ingestion problems before searching individual sources.

Frequently asked questions

Why does a high-severity alert sit below a low-severity one?

Priority group sets the order of work, and it counts for more than severity alone. A high-priority, low-severity alert should be handled before a low-priority, high-severity alert.

What is the difference between muting and restoring a metric?

Muting stops that metric from generating alerts for the source you mute, and the mute covers that source only unless you choose all components. Restore normal importance returns the metric to normal when the situation changes.

What does Flapping mean, and what should I do?

Flapping means identical events from one source are arriving at high frequency, so the alert keeps moving between Open and Closed. Check the source first, then run a remediation workflow if one fits, and close the alert once you are certain the underlying issue is addressed.

Which dashboard replaces the Overview dashboard?

Use the HLA Operational dashboard, which monitors log data, alerts and error rates in the Service Operations Workspace. The Overview dashboard has been deprecated, and the Operational dashboard replaces it.