OBLYTECH Logo
OBLYTECH Logo

Create a VMware discovery schedule

To create a VMware discovery schedule, open Schedules in Discovery Admin Workspace, start New Discovery, and choose Cloud-based discovery with VMware as the provider. Before starting, have at least one validated MID Server with status Up, Cloud Management capability, and access to the target ranges, plus a vSphere user and matching credentials.

Prepare the MID Server and access before opening the wizard

The creation procedure requires the discovery_admin role. That role applies to creating this schedule; it does not define the VMware permissions assigned to the vSphere user. Prepare that user in VMware vSphere Client with the permissions needed to access the resources you intend to discover, and create suitable credentials in the ServiceNow AI Platform for that identity.

Check the MID Server against three separate requirements: validation, status Up, and Cloud Management capability. Also check its ability to reach the IP ranges in scope. An installed MID Server is not sufficient evidence that these requirements are met. Treat this as a readiness check before spending time entering account details.

A MID Server can be installed through the guided setup in the workspace or by downloading the installer and running it manually. Either route still leaves the server short of what the wizard needs until it is validated and reports status Up. Treat installation as the start of the readiness check, not the end of it.

Discovery Admin Workspace must be version v1.13.0 or later. Check the workflow on your instance and release: the steps below follow the newer account and datacenter controls, so confirm that version before you start..

Write down the intended vCenter account, datacenters, execution method, and person responsible for reviewing the initial run. These are planning notes rather than additional required fields. They help keep the wizard choices aligned with the discovery boundary. For background on how the work fits together, see the plain-language guide to ServiceNow Discovery.

Create a VMware discovery schedule in the workspace

  1. Go to Workspaces > Discovery Admin Workspace > Schedules.
  2. Choose New Discovery from the header on a Schedules tab.
  3. Choose Cloud-based discovery, then Continue.
  4. Give the schedule a distinctive name that explains its scope.
  5. Set the cloud provider to VMware.
  6. Choose the MID Server selection method, then select Next.

Use a name that helps an operator distinguish the schedule from other VMware schedules. For example, include the vCenter environment and intended datacenter scope. Avoid a name that implies a wider scope than the account and datacenters you will select. The name is a navigation aid for future review, so make it understandable without relying on the creator’s memory.

The cloud-based route is the starting point for this VMware workflow. Decide separately whether you also need the optional server discovery schedule later in the wizard. Keeping these decisions separate helps you avoid treating a cloud inventory run as evidence that guest server attributes have also been collected. The Cloud Discovery Workspace guide provides related workspace context.

Choose how the schedule gets its MID Server

The wizard offers three selection methods. Choose based on how you want execution assigned, then check that the selected approach can reach the intended environment.

  • Use a cluster of MID servers: use an existing cluster arrangement for failover protection and load balancing between MID Servers.
  • Automatically select a MID server: let an available MID Server be chosen when the schedule runs.
  • Search for a MID server: choose a particular MID Server for the schedule.

The search selection displays MID Servers that are validated, up, and have Cloud Management capability. If a server you expected to select is absent, compare it against those conditions before changing the cloud account. A missing choice at this stage gives you a specific readiness question to resolve.

Automatic selection happens at execution time. As a planning check, consider which available servers could be used and whether the intended network is reachable from them. With a named server, record why that server is appropriate. With a cluster, understand which members are expected to support the scope.

Identify the cloud account and select datacenters

Choose Existing cloud account to reuse an account on the instance. Selecting it fills Account name, UUID, and URL. Review those populated values against your intended vCenter before proceeding; a familiar account name alone is a weak check of the target.

Choose New cloud account when you need to add an account, then enter its account name, UUID, and URL. In the newer workflow, UUID means the instance UUID of the vCenter Server. Gather these details from the environment owner before entering them. Do not substitute another identifier simply because its format looks plausible.

Use Verify information to recheck an account when permissions or policies may have changed, even if it was verified previously. This provides a deliberate checkpoint between identifying the account and choosing its discovery scope. Then select Next to continue.

Reverifying matters most after a permission change on the vSphere side. An account that passed an earlier check can still lack the rights a wider scope now needs, and a second verification before you choose datacenters catches that while the change is still fresh.

Choose either all datacenters associated with the account or a specific selection. For a narrower scope, choose Specific datacenters and select entries from Available datacenters. If the expected entries are missing, use Refresh datacenters. Review the resulting selection before continuing with Next.

The wizard does not set a fixed ceiling on how many datacenters a schedule can include. In practice the limit is how many entries your reviewers can compare against the expected inventory in one pass, so a long list is a sign that the schedule may be doing too much.

A sensible initial scope is one that the reviewers can compare with their expected inventory. Record which datacenters you intended to include, and keep that note with the run review.

Decide whether to add server discovery

The optional Create a server discovery schedule toggle adds an IP-based Discovery schedule to complement the cloud schedule. Enable it when your plan includes discovering virtual machines and their attributes through that additional route. Choose a MID Server or cluster that can discover those VMs, then continue with Next.

Review the server discovery execution choice on its own merits. The cloud schedule’s MID Server choice and the optional server schedule’s reachability requirements answer different planning questions. Confirm which machine ranges the additional discovery is expected to cover before accepting the selection.

If you are still resolving ownership of credentials or the server discovery boundary, settle those decisions before enabling the additional schedule. For credential planning, see external credential storage for ServiceNow. For help planning this work, see ServiceNow implementation.

Set execution timing and finish deliberately

Run at a scheduled time lets you define the date and time of execution. Run on demand leaves execution to a manual trigger. Run after series places the run after another existing Discovery schedule completes; selecting that schedule displays a relationship map of the associated schedules.

On-demand schedules have two triggers. Finish and run starts the schedule as part of setup. Otherwise, open the schedule later in the Discovery Schedules table and select Discover Now. The first suits a team that is ready to watch the initial run; the second suits a schedule you want to inspect before any discovery happens.

Choose the timing method to match the operating plan. An initial manual run can make it easier to have the right reviewers available. A chained run is appropriate when the planned sequence depends on another discovery schedule completing. Review the relationship map before accepting that dependency, rather than inferring the sequence from schedule names.

Set discovery time out lets you configure a maximum runtime. If the run exceeds that threshold, it is canceled. Select a threshold with the expected work in mind; cancellation at that limit should lead to a review of runtime and scope before another attempt. Switch the timeout on first, then enter the runtime threshold, because the threshold field is only configured after the toggle is enabled.

Finish validates the supplied information, creates the schedule, and opens its record in Discovery Schedules [discovery_schedule]. From that record you can edit the schedule or use Discover Now. Finish and run validates the information, creates the schedule in the background, creates a Discovery status, starts execution, and opens Status Details.

Choose Finish when you want to inspect the created record before manually launching it. Choose Finish and run when the environment and reviewers are ready for execution. After creation, compare the saved account, scope, MID selection, and timing with your plan. If the run needs investigation, use the ServiceNow Discovery troubleshooting guide to organize the follow-up.

Handoff notes for a VMware schedule

Record the schedule name, the intended inventory boundary, the account owner, the reason for the execution choice, and the person who reviews the result. Keep credentials out of these notes. After the first run, compare the observed inventory with an independently prepared expectation and record missing or unexpected resources as specific differences.