To use the Agent Client Collector Health Dashboard, open All > Agent Client Collector > Agent Health Dashboard with the agent_client_collector_admin role. Review the configured agents, distinguish manual shutdowns from CPU-triggered shutdowns, and refresh the widgets before investigating. Use an ACC health instance scan when the dashboard review raises broader configuration or consistency questions.
Open the dashboard and establish a review baseline
The Agent Health Dashboard brings agent status information into dashboard widgets. Start a review by agreeing which agents your team expects to be collecting data and which are deliberately stopped. That operational context helps you decide whether a displayed state needs investigation or matches an approved maintenance activity.
- Use an account with the agent_client_collector_admin role for the dashboard procedure.
- Navigate to All > Agent Client Collector > Agent Health Dashboard.
- Review the information about configured agents in the widgets.
- Record the time of your review and any recent agent maintenance that could explain the displayed states.
Keep the review focused on a question you can resolve: which agents need attention now, and what evidence supports that decision? A count without maintenance context can lead to unnecessary changes. Conversely, an expected maintenance stop should have an owner and a planned follow-up so it does not become an overlooked collection gap.
If you are checking agents after a rollout, keep the deployment record beside the dashboard review. The guide to Agent Client Collector installation and deployment covers the neighboring installation work. Use this dashboard review to assess the resulting operational state.
Use the Agent Client Collector Health Dashboard status distinctions
In the Agents by Data Collection Status widget, the two off states have different meanings. Off (manual) means someone turned an agent off, for example during maintenance or troubleshooting. Off (auto) means the agent was turned off automatically after crossing the CPU usage threshold. Preserve these exact labels in your investigation notes.
For Off (manual), first compare the state with the maintenance or troubleshooting record. Identify who owns that work and whether the stop is still intended. Treat a planned stop differently from an unexplained one: the next action may be an operational handoff rather than a technical repair. Record that distinction before making changes.
For Off (auto), investigate the CPU-related shutdown context. Do not group it with manual maintenance simply because both labels contain “Off.” Capture what was happening on the host around the affected period and pass that evidence to the person responsible for agent operation. The label identifies why collection was turned off; it does not by itself establish the underlying workload cause.
A concise review note can contain the observed label, the affected agent, the relevant maintenance context, the investigation owner, and the next verification time. This keeps the dashboard actionable without inventing additional status categories or assuming that a stopped agent has the same cause as its neighbors.
Refresh the evidence before comparing observations
Refresh a particular widget by selecting the refresh arrow icon in its top right corner. To refresh the dashboard widgets together, select the form header icon and then select Refresh. Choose the scope that fits your question: one widget for a focused recheck, or the dashboard for a broader review.
Take the refreshed observation before deciding that an earlier condition still exists. For example, if maintenance has ended, refresh the relevant widget and record what it now shows. Keep the previous observation in the incident or maintenance notes so another operator can understand what changed between reviews.
Refreshing is a data review step. Keep any corrective action separate in your notes, including who performed it and when. That makes a later comparison meaningful: you can distinguish a newly displayed observation from evidence that a specific intervention resolved the problem. Avoid closing an investigation simply because the page has been refreshed.
These dashboard controls and labels apply to the documented dashboard workflow; check their availability on your instance and release. Use a consistent review sequence across operators so differences in refresh timing do not become mistaken differences in agent behavior.
Investigate broader health issues with an ACC instance scan
The ACC health instance scan examines instance-side anomalies and configuration issues. Use it to broaden an investigation when reviewing agent status leaves unanswered questions about identification, synchronization, or the supporting configuration. Keep the dashboard observation and the scan finding together, while recording what each one actually shows.
- ACC duplicate agent for host CI identifies CIs associated with multiple active agents. A finding directs attention to CI identification rather than just the displayed collection state.
- ACC verify plugin folder hierarchy checks ACC Plugin folder creation and flags duplicate folders that can affect synchronization.
- ACC verify sn_agent CI counts match compares records in sn_agent_ci_extended_info and sn_agent_cmdb_ci_agent for consistency.
- ACC find modified script includes detects changes to Agent Client Collector Framework script includes that may have occurred after an upgrade.
When a scan finds a duplicate association, investigate the identification issue before treating agent counts as a reliable inventory conclusion. Likewise, a record-count mismatch deserves a data consistency investigation. For the wider data-quality context, see CMDB health dashboards and data quality scores.
Other checks help identify operating pressure. ACC active policies count counts active published policies and recommends consolidation when the number exceeds 300. ACC agent to MID Connection checks agent-to-MID loading using 1,000 agents per 1-GB JVM. If the MID Server is overloaded, the indicated responses are additional JVM capacity or redistribution of agents to other MID Servers.
Use that finding to frame a capacity review rather than assuming that a dashboard off state proves a MID Server capacity problem. For the related configuration work, see configuring multiple MID Servers for Agent Client Collector monitoring.
Schedule a scan and preserve the follow-up trail
The role required for scheduling the ACC health instance scan is agent_client_collector_admin. Set a repeat interval that fits your review process, then make someone responsible for checking the results. Running a job without reviewing its findings leaves the operational question unresolved.
- Navigate to All > System Definition > Scheduled Jobs.
- Select Run ACC Health Instance Scan.
- Select the Active check box.
- Set Repeat Interval to the required frequency. The default interval is 7 days.
- Select Execute Now to run the job.
The job compiles its results in Scan Results (scan_result) and its errors in Agents issue (sn_agent_acc_error_msg). Review those records alongside the dashboard observation. Capture the finding, the assigned owner, and the evidence you expect to see after correction. This creates a traceable handoff between the person reviewing status and the person changing configuration.
For an on-demand suite scan, navigate to All > Instance Scan > Suites, select ACC Health Instance Scan, and select Execute Suite Scan. Choose this route when investigating a specific concern rather than waiting for the next scheduled run.
After corrective work, refresh the dashboard and compare the relevant status with the earlier note. If the work concerned an instance scan finding, review the corresponding scan evidence as well. Keep the closure criterion tied to the original issue, such as resolving an unexplained stop or correcting an identified consistency problem.
For help planning this work, see ServiceNow implementation.
Questions about incomplete ACC health findings
Why might some scan checks fail to run?
A missing global.ACCInstanceScanUtil script include can prevent several checks from running. Check that prerequisite when expected findings are absent. Treat an incomplete suite differently from a completed scan with no findings; missing execution does not demonstrate that the configuration passed.
Can an upgrade issue exist without an error message?
Yes. ACC skipped upgrades reports upgrades skipped since the last upgrade, and skipped upgrades do not generate an error message. Include that check in an upgrade-related investigation instead of relying entirely on the presence or absence of errors.
What checks support the ACC error framework?
ACC Error Framework checks whether ACCErrorManager was created and whether the automation source application, automation error category, and automation error code exist for Agent Client Collector Framework. A finding here gives administrators a specific framework configuration issue to investigate.
How can old ACC error records be investigated?
ACC automation_error_msg cleaner checks that the Agent Issues table cleaner exists and is enabled. Review that finding when investigating whether ACC-specific error records are being cleaned up. Keep cleanup configuration separate from the investigation of the errors themselves.
Does the suite examine the ITOM Cloud Services setup?
ACC ICS Diagnostics Tool analyzes the instance and its setup with ITOM Cloud Services. Consider its findings when the investigation reaches that integration context, and retain them with the other scan evidence so the next operator has a complete issue history.