To configure multiple MID Servers for Agent Client Collector Monitoring, open Agent Client Collector > MID Servers and run Setup ACC Monitoring with the evt_mgmt_admin role on each server. Several MID Servers can support load balancing and domain separation. Each MID Server needs its own ACC Monitoring setup, and the MID Web Server Port is requested only on that first setup.
Plan the MID Server group before changing connections
Start with the agents you intend to connect and the MID Servers that can serve them. Write down each server name, host, intended domain, and configured port. This gives the operator a selection list and makes exceptions visible before setup connects the wrong group.
Choose server placement around network policy, security restrictions, workload, and host reliability. A larger server count does not resolve a network boundary that prevents communication. For example, an access control list may mean a server belongs on an already permitted machine, while a DMZ policy may require placement within that network segment.
For readers establishing the architecture first, the MID Server overview explains the underlying role. Keep this change focused on the ACC Monitoring connection set rather than combining it with unrelated Discovery selection changes.
Check these steps against your instance and release before implementation. Decide who will prepare the servers, who will perform ACC setup, and who will verify the resulting connections. Give each person the server names and the reason those servers belong in the group.
Sequence the work so that every MID Server is validated before any ACC setup starts. A server that is not validated should stay out of the group.
Prepare separate MID Server installations where needed
If the required MID Servers already exist, check their identities and validation before selecting them. If you need additional installations, the installation procedure lists admin, mid_server as its required roles. The MID Server account used by an installation must have the mid_server role.
Multiple installations can share a Windows or Linux host, including a virtual machine. Give each installation its own directory at the top level of the drive and a distinct, descriptive name. Extract the MID Server archive separately into each directory so the resulting agent directories remain distinguishable. On Windows, the installer asks for a service wrapper name and display name for each installation, so give each one its own.
- Log in to the intended host and create the separate installation directories.
- Extract the archive into each directory and locate that installation’s agent directory.
- Run /agent/start.bat on Windows or /agent/installer.sh on Linux.
- Enter the instance address, MID Server user credentials, proxy connection details, and MID server name.
- On Windows, also supply the service wrapper name and display name for the installation.
- Select Start MID Server, then Mid Servers List Page to open the instance list.
- Open the matching server record and use Validate under Related Links. Check that Validated becomes Yes.
Allow a few seconds for a newly started server to establish its instance connection. Match the record to the intended installation before validating it. When host preparation needs closer review, use the MID Server requirements guide alongside your installation plan. Keep the MID server name the same in the installer and on the instance record, since you select the server from that list.
On Linux, the standard installer sets up one MID Server as a daemon service on a host, because the Tanuki wrapper allows one daemon per host. Running several as services on one host requires the manual non-root configuration. Confirm which route your release supports before choosing a shared Linux machine for several installations. Separate directories by themselves do not decide how the services start after a reboot.
If the Linux hosts will run several installations as services, follow the non-root configuration in the Linux install guidance. Each instance needs its own APP_NAME, which must be unique for that MID Server. Record that name beside the server name in your inventory.
Configure multiple MID Servers for Agent Client Collector Monitoring
Setup ACC Monitoring requires the evt_mgmt_admin role, so confirm the operator holds it before starting. Compare the port recorded for each intended server before you start, because the port is entered during each server’s initial setup.
Two roles appear in the ACC Monitoring topics. The single-server Setup ACC Monitoring procedure requires evt_mgmt_admin. The Configure multiple MID Servers topic names agent_client_collector_admin as its required role, so confirm which role applies to the path you use and check it on the operator’s account before the change window opens.
Before you run setup, check each server:
- Each server’s record shows Validated as Yes.
- The operator holds evt_mgmt_admin, and the role is recorded in the change plan.
- The MID Web Server Port for each server is written down before the dialog opens.
- Each server name matches the inventory you wrote during planning.
- Open All > Agent Client Collector > MID Servers.
- Select the first MID Server in the group to open its record.
- Under Related Links, select Setup ACC Monitoring.
- Enter the MID Web Server Port in the dialog.
- Repeat for each server in the planned group and record the result against its name.
Each MID Server record should show the setup result once Setup ACC Monitoring completes. Compare those records against your planned group, and treat any server missing from the list as an open item. Confirm that the MID Server record reports that it is configured to support both Agent Client Collector and Metric Intelligence. Enabling this also enables monitoring on the agents connected to that MID Server.
Handle port differences without broadening the change
When the MID Servers use different ports, check each server’s port as you go, because the Configure multiple MID Servers topic says different ports require adding each MID Server individually. Identify this exception during preparation so it does not become a surprise halfway through the change.
Decide whether a port change is justified before altering it. A preference for a shorter setup sequence is not enough to establish the network impact. Keep that decision in the change plan with the server names it affects.
Separate load balancing, domain placement, and host reliability
Several connected MID Servers can support load balancing and domain separation, but these address different design concerns. Workload distribution concerns capacity. Domain placement concerns the intended separation of the deployment. Host placement determines which services share the consequences of a machine outage.
Where domain separation is enabled and the configured domains form a hierarchy, place MID Servers at the lowest domain level. Map that placement before assembling the ACC connection group. Selecting more servers does not establish that the domain arrangement is appropriate for the agents in scope.
Multiple services on one machine still share that machine’s maintenance and failures. If the purpose of adding a server includes improving reliability, assess dedicated hosts and their maintenance exposure. Count the underlying machines as well as the server records when reviewing the design.
A capacity review should also consider other work assigned to the infrastructure. Resource-heavy transactions such as JDBC transfers can occupy a MID Server and affect its ability to respond to other requests. Identify competing workloads before assuming that another installation on the same busy host will provide sufficient capacity.
If your design also includes clustering, review the MID Server cluster guide as a separate architecture decision. For help planning this work, see ServiceNow implementation.
Verify the result and preserve a clear handoff
Close the setup change by comparing intended membership with the MID Server records and their setup results. Keep the inventory, the port for each server, and the setup result with the change record. Keep installation validation evidence separate from ACC connection confirmation so the handoff shows both stages.
Run these checks in order once setup is complete.
- Confirm that every server in the group shows Validated as Yes.
- Confirm that each server reports the Agent Client Collector and Metric Intelligence setting on its record.
- Compare the list of servers with the inventory and note any server that is missing or extra.
If an installation cannot establish its instance connection or reach the expected validation outcome, investigate that installation before relying on it in the group. Check the Validated field and the Status on that record first. If Validated stays at Validating, confirm that the MID Server service is running and its Status is Up. The MID Server troubleshooting guide provides a route for the broader investigation.
For operational acceptance, define what the monitoring team will observe after the change and who will review it. Keep any wider capacity or reliability acceptance criteria explicit in the change plan.