To configure a MID Server cluster, use an admin account to create a cluster under MID Server > Clusters, choose Failover or Load Balance, save the record, and add members through Includes MID Servers. Match member capabilities and network access before testing workload distribution or recovery from a member failure.
Choose the cluster behavior before adding members
A cluster groups MID Servers that can perform the same work. Choose Load Balance when the application should distribute work across members. This type also provides failover protection. Choose Failover when the requirement is an ordered replacement for a failed member. Members of a failover cluster operate independently rather than sharing work through load balancing.
Write down the expected outcome before opening the form. For a busy workload, that might mean several eligible members receiving work during normal operation. For an ordered recovery design, it means identifying which available member should take over when another fails. These are different acceptance criteria, even though both designs use cluster records.
The MID Server cluster overview helps frame the wider design decision. For this configuration, keep the first deployment simple enough that you can explain which servers are eligible, which workloads they handle, and what should happen when one becomes unavailable.
Check capability parity and connectivity
The admin role is required to create or edit the cluster configuration. Before creating it, compare Supported Applications, IP Ranges, and Capabilities across the intended members. Matching a server name or host specification does not establish that it can replace another member. The application selection and reachable targets need to support the same assignment.
Use a short preparation checklist for the proposed membership:
- Compare Supported Applications so members are eligible for the intended application work.
- Compare IP Ranges against the targets the cluster is expected to reach.
- Compare Capabilities so a replacement can perform the work it inherits.
- Confirm that each member can connect to the instance and the intended devices.
- Include the proposed members in any Access Control List restrictions in use.
For a failover replacement, provide at least the capabilities of the member it may relieve. As an implementation check, test access from the replacement itself. A successful connection from the preferred member does not establish that the replacement has the same network path.
Keep membership straightforward rather than relying on overlapping clusters. Check selection behavior on your instance and release before adopting a combined design; legacy selection methods and combined membership require particular care. Record the chosen boundaries with the MID Server governance model so later changes preserve the assumptions behind recovery.
Configure a MID Server cluster in the form
Complete the following sequence with the admin role after the membership checks. Keep the intended cluster type and member list available while making the change.
- Open All > MID Server > Clusters.
- Select New to start a cluster record.
- Give the cluster a name that makes its purpose recognizable to operators.
- Select Failover or Load Balance as the cluster type.
- Right-click the header bar and select Save from the context menu.
- Find the Includes MID Servers related list and select Edit.
- Use the slushbucket to select the MID Servers intended for this cluster.
After selecting members, inspect the resulting membership against your preparation list. Look for an omitted replacement, an unintended server, or a member whose application support differs from the others. Treat those differences as configuration issues to resolve before directing production work at the group.
For Failover, check the configured member order against the intended recovery sequence. The platform uses that order to select an available replacement. Do not assume that a list of several servers alone expresses the order your operations team expects. Include the sequence in the change record and in the recovery test.
For help planning this work, see ServiceNow implementation.
Connect the cluster choice to the workload
A Discovery schedule can specify a particular MID Server cluster. When a schedule makes that selection, Discovery is restricted to that cluster. It cannot chain clusters to extend the available pool. Check that the selected group covers the schedule’s target devices before treating the schedule as ready.
The MID Server Cluster Management business rule evaluates whether the MID Server assigned to an ECC Queue job belongs to a cluster. For load balancing, the application using the MID Server distributes the work across cluster members. Cluster membership therefore needs to align with the application and its assignment behavior, as well as with network reachability.
Smart Workload Manager can assign work according to actual load and processing performance. A faster member with less work may receive more assignments. Evaluate whether eligible members process work successfully rather than requiring identical job counts as proof of balance. Equal membership does not imply an equal number of tasks at a particular moment.
Use the MID Server implementation roadmap to place schedule changes after capability and connectivity checks. A schedule pointed at a poorly prepared cluster can expose the same missing access repeatedly across different assignments.
Test failover with observable evidence
Plan a controlled test with the workload owner and record the starting member, the configured replacement order, and the work under observation. For a load balancing test, observe assignments while members are available. For a failover test, compare the actual replacement with the expected available member in the order.
When a member fails, MID Server Cluster Management selects the highest available member in the configured sequence. The replacement checks the ECC Queue for jobs in Processing or Ready. Follow the affected work through those states and its subsequent processing, rather than treating the existence of a replacement server as proof that recovery succeeded.
Capture evidence that answers three questions: was a replacement selected, could it reach the required target, and did the application work proceed? If selection succeeds but target access fails, return to the member connectivity checks. If the selected server lacks the required capability, correct the eligibility assumptions before repeating the acceptance test.
If the entire cluster is down, Discovery is canceled. Include that outcome in the operational plan so operators distinguish a member failure from loss of the whole eligible pool. Record test findings and the approved membership with the MID Server operating practices.
Keep unsupported work outside the recovery promise
Use dedicated, non-clustered MID Servers for LDAP, export sets, and JDBC data sources. During JDBC failover, the replacement can restart the ECC Queue task from its beginning, including work for which data has already been returned. That creates a duplicate-data risk. Moving a data source into a cluster should not be treated as a general reliability improvement.
Check workload routing before enabling the cluster for a broader set of integrations. An administrator may see successful Discovery recovery and assume a data extraction job has the same recovery characteristics. Review the MID Server integration patterns when separating clustered work from dedicated data-source processing.
Two ECC Queue topics, Command and SystemCommand, do not support cluster redirection. Their records can remain in the queue without processing instead of moving to another member. If a test leaves work behind, identify the topic before changing cluster order or adding more servers.
There is also a specific Discovery limitation: when a MID Server fails during the Shazzam probe with auto-selection configured, Discovery does not select another MID Server to continue that probe. Account for that exception when defining what the recovery test is expected to demonstrate.
Questions about cluster operation after setup
Can a cluster failure produce an event for notification?
The mid_server.cluster.down event is raised when the platform cannot find a replacement with suitable capabilities in a failover cluster. It relates to MID Server Cluster [ecc_agent_cluster] and MID Server Cluster Management. Use it as an input when planning failure notification.
What should a membership handover record contain?
Record the cluster purpose, its selected type, the member names, and the person responsible for reviewing changes. Include the acceptance evidence and target coverage. This gives the next administrator a basis for deciding whether a proposed member replacement preserves the original design.
When should the team repeat the acceptance checks?
As an operating practice, repeat the relevant checks after changing membership, capabilities, target ranges, or network access. Choose the checks affected by the change. A replacement host may need connectivity verification even when the cluster record itself required little editing.
How should a failed acceptance test affect rollout?
Keep the affected workload out of the rollout until the observed failure has an explanation and a corrective action. Record whether the issue concerned selection, connectivity, eligibility, or a workload limitation. That distinction makes the next test specific enough to judge.