OBLYTECH Logo
OBLYTECH Logo

Validate a MID Server

To validate a MID Server, open the ITOM Configuration Console, launch the MID Server workspace, select the newly installed server, and choose Validate from Server Actions. Validation establishes trust with the instance. You can also define the applications, capabilities, and IP ranges the server is allowed to use.

Prepare to validate a MID Server

The Configuration Console workflow requires the admin role. Its prerequisites include Zurich Patch 8 or later, the ITOM Visibility plugin, and the ServiceNow Otto for IT Operations Management (ITOM) plugin. Start on the Configure IT Operations Management page. Check that this workflow applies to your instance and release before following the navigation below.

Treat validation as an authorization decision. The trust established by validation allows a MID Server to access credentials securely and carry out automation and Discovery tasks. Installation gets the server in place; validation is the point at which you approve that server to work on behalf of the instance.

Before opening the action menu, identify the intended server and its owner. Compare the server selected in the instance with the installation being handed over. When several servers have similar names, resolve the identity before proceeding. A successful action on the wrong record would leave the intended installation unfinished and approve a different server.

Prepare a short acceptance note containing the server identity, intended workload, approving administrator, and scope decisions. This is a recommended working record rather than an additional platform requirement. It gives the next operator a way to understand why the server was approved. Place this checkpoint in your MID Server implementation roadmap so that installation and authorization have separate completion criteria.

Run the Configuration Console validation workflow

Use the following sequence with an administrator who holds the admin role. Keep the installation handover available while selecting the record, particularly when the workspace contains servers for several environments.

  1. From the Configuration Console, navigate to Configuration Summary > Discovery > Platform foundations.
  2. Select Validate MID server.
  3. Select the Application manager icon to open ITOM Infra Services Workspace.
  4. In Total MID Servers, select the check box beside the intended MID Server.
  5. Open the Server Actions drop-down list and select Validate.
  6. Select X to close the window and return to the Configuration Console.
  7. Select Mark as configured to complete the setup task.

Pay attention to the transition between the console and the workspace. The console provides the setup route, while the server selection and Validate action occur in the workspace. Returning to the console is also part of the sequence. Include that final return in the handover rather than leaving another administrator to guess whether setup was completed.

Record what you observed after the action. If the interface reports a problem, keep the displayed message with the server identity and the step at which it occurred. Avoid recording completion merely because the action was selected. The difference between an attempted action and an accepted outcome matters when someone later investigates why a workload did not run.

Decide the applications, capabilities, and IP scope

Validation can include optional decisions about the applications, capabilities, and IP ranges the MID Server may use. Prepare those decisions before approving the server. Treat them as three separate questions: what work belongs here, what capability does that work need, and which addresses belong within its intended reach?

For the record-based validation route, the required role is agent_admin or admin. First check that the MID Server version is compatible with the instance, then navigate to All > MID Server > Servers. Open the intended record and select Validate under Related Links. If Supported Applications, IP Ranges, and Capabilities have no records, Set Initial Selection Criteria appears.

The window provides Allow ALL capabilities, Allow ALL applications, and Allow ALL IP ranges switches. Allow ALL capabilities applies to Orchestration and Event Management capabilities. Allow ALL applications permits applications that use MID Servers to use this server. Allow ALL IP ranges makes any IP address a valid target. Choose these settings against the intended operating scope, then select OK.

Cancel continues validation without adding capabilities, applications, or IP ranges. Initial selection criteria are therefore optional for validation itself. If you defer them, record who will review the scope before the intended workload is accepted.

Start with the assigned applications

Write down the applications intended to use this installation. A server introduced for a defined Discovery rollout should have an explicit purpose in the handover. If another team proposes using it for additional work, ask that team to identify the application and its owner before you fold that work into the approval.

This review helps avoid an ambiguous description such as “general integration server.” Describe the actual consumers instead. Use your MID Server integration patterns to connect the proposed application use with the wider integration design.

Review capabilities against that work

Decide which capabilities are appropriate for the approved applications. Keep a reason beside each proposed capability so the scope can be reviewed without reconstructing the original project discussion. If a capability has no identified workload, resolve the gap before accepting it as part of the server’s operating purpose.

The point of this review is a clear authorization record. A broad set of permissions may be intentional, but it should be a decision someone can explain. A smaller set may also be wrong if it excludes the work the server was installed to perform. Review scope against requirements rather than assuming that either breadth or restriction proves correctness.

Agree the intended IP ranges

Have the network and workload owners identify the addresses intended for this server. Use concrete ranges in the acceptance note rather than a phrase such as “the internal network.” Where ownership is uncertain, assign that question to a named team before treating the network scope as settled.

For example, an installation intended for a particular network segment needs an acceptance discussion about that segment. Expanding the proposed scope to other segments deserves its own review. Record the agreed boundary and the reason for it alongside the application and capability decisions.

For help planning this work, see ServiceNow implementation.

Check the result and investigate a stalled validation

In the record-based workflow, Validated changes to Validating and then Yes when validation completes. If it remains Validating, check that the MID Server service is running and Status is Up. Confirm that the host can reach the instance and that a firewall or proxy is not blocking communication with the instance ECC queue.

Inspect agent0.log for validation probe errors. If the issue persists, invalidate the server and revalidate it. Invalidation clears memory and restarts the MID Server, which generates a new keypair. Coordinate this action with its owner because it changes the server’s operating state.

Separate trust validation from ACC content checks

Several MID Server actions use the word validation. Server validation establishes trust with the instance. Agent Client Collector asset and plugin validation check whether the content on the MID Server matches the instance. Choose the action according to the problem being investigated, and keep the results separate in the acceptance record.

ACC plugin validation requires agent_client_collector_admin. Navigate to All > Agent Client Collector > Deployment > MID Servers, open the intended entry, and select Validate ACC Plugins. The Queues page opens with the ECC queue. Refresh it, open the new input record, and inspect Payload for the validation status.

ACC asset validation also requires agent_client_collector_admin. From the same MID Servers navigation, open the server and select Validate Assets. Refresh the ECC queue on the Queues page, select the new input record, and examine Payload for the result. This check compares assets rather than the plugins checked by Validate ACC Plugins.

When assets or plugins fail their respective validation checks, restarting the MID Server triggers their automatic synchronization. Plan such a restart with the operating owner. Keep that recovery step tied to the asset or plugin mismatch that prompted it, rather than using a restart as an unexplained response to a different validation problem.

Close the handover with evidence and ownership

A concise handover should let an operator answer which server was approved, what work it was approved for, and what remains unresolved. Keep the Configuration Console completion separate from any ACC results. This prevents a passing plugin check from being recorded as evidence that the initial server trust decision was completed.

  • Identify the MID Server selected and the administrator responsible for validation.
  • Record completion of the workspace action and the console setup task.
  • Retain the application, capability, and IP scope decisions with their owners.
  • Include ACC queue results when those additional checks were part of the handover.
  • Assign unresolved observations to an owner with a clear next action.

Use the MID Server governance model to decide who accepts scope changes after the installation is handed over. Approval is easier to maintain when a later operator can identify the decision owner without asking the original installer to reconstruct the work.

Questions about validation acceptance decisions

What should a reviewer do if the handover contains no server identity?

Return it for clarification before accepting the validation record. A completion statement without a specific server leaves the reviewer unable to connect the approval to the installation. Ask the installer and administrator to agree which record the evidence belongs to.

How should teams handle a disputed workload request?

Record the disputed application or capability as an open decision and assign it to the workload owner. Keep the proposed scope visible so that a temporary assumption does not become the accepted operating design through silence.

What evidence belongs in an audit summary?

Use a concise account of the approved server, decision owner, intended scope, observed outcome, and outstanding work. Keep sensitive credential values out of that summary. The reviewer needs to understand the authorization decision and its evidence without receiving the credentials themselves.

Who should accept a handover with an outstanding ACC mismatch?

Ask the service owner to decide whether the outstanding check affects the planned workload. Document the decision and the person responsible for resolution. An unresolved mismatch should remain visible even when another part of the setup has been completed.

How does ServiceNow choose which MID Server handles a target?

When an application such as Discovery or Orchestration needs to reach a machine, it looks for a MID Server whose IP range covers that target and whose supported applications and capabilities match the work. Two servers can both be validated and Up, yet only one may qualify for a given target.

Why a validated server can still be skipped

Approval for the instance and selection for a target are separate decisions. Selection depends on IP range records, so a server with no range covering a target will not be chosen for it, however healthy it is.

Include and exclude rules need the application scope first

Each range record is typed as Include or Exclude, and exclusions are easy to get wrong. When a server is set to all applications, the system ignores any addresses configured for exclusion. That server will therefore still serve an address you meant to block. Decide the application scope first, then add exclusions only on servers that are not set to all applications.

The ALL IP range is a permission, not a network route

On the server record, ALL IP ranges only grants permission for an address an application names. It does not mean the server can reach those addresses. The server still needs a network path to each target. Where that path is missing, the work typically fails later at run time, not at selection. Record network reach as its own line in the acceptance note, separate from the range records.

What automatic subnet assignment requires

Automatic subnet assignment gives a MID Server subnets without manual range records. In the Australia release (documentation updated March 12, 2026), a server qualifies only when it is in an Up state, has been successfully validated, and can access one or more of the subnets. Check those three conditions on each candidate before you rely on automatic assignment, because a server that fails any one of them will not be assigned.

Checks to complete before a server takes on a new target

  1. Confirm the server is Up and successfully validated, since automatic assignment depends on both states.
  2. List the target addresses each intended application will use, as specific IP addresses or ranges.
  3. Mark each range as Include or Exclude, then check whether the server is set to ALL applications.
  4. Confirm the server can reach each listed subnet, and record that result separately from the range records.
  5. If automatic assignment is in use, note which ranges were entered by hand before the assignment ran.