Workforce Optimization for ITSM has several modules, and this page covers Teams and Channels. Teams groups agents into assignment groups and measures them against shared KPIs over time. Channels routes incoming work to queues and agents, then shows a supervisor each queue’s live state. From the Brazil release, the suite is being prepared for future deprecation, so confirm availability before planning a rollout.
How Teams and Channels divide the work
Teams is the reporting side. It shows how a group has performed over time. Channels is the operational side. It decides where the next work item goes and keeps the live board current during a shift. For a related page on scheduling and schedule adherence, see scheduling and schedule adherence.
| Area | Teams | Channels |
|---|---|---|
| Core unit | Assignment group | Service channel holding queues |
| Main question | How is this team performing over time? | Where should this work go, and how is the queue doing now? |
| Refresh | KPI data is collected daily by default | Indicator scores refresh every five seconds, channel cards every two minutes |
Organising teams into assignment groups and KPI groups
In the Teams application, each team is an assignment group. An admin creates a KPI group, adds up to five parent KPIs, and attaches the assignment groups to measure. The KPI group Type must be Teams. Choosing another type, such as Channels, is not supported in Team Performance, and the related list then shows a default list. Each parent KPI can carry up to 10 supporting KPIs. Both limits are system properties. To create a KPI group, go to Workforce Optimization for ITSM > Team Performance > KPI Groups, select New, enter a name, set the Type menu to Teams and save from the form header. To attach groups, open the Assignment Groups tab, choose Edit, move groups from the Collection list into the Assignment Groups list and save.
One assignment group can sit in more than one KPI group. A service desk unit might have a KPI group for the whole unit, while a specialist team inside it also belongs to a second group that tracks its specialism. Copying a KPI group keeps its KPIs and thresholds but drops the assignment group mapping, so the copy needs its own groups attached.
Each assignment group needs a manager who leads it or needs visibility into it. Additional managers are added from Team Performance under Additional Managers and require the sn_wfo_admin role. Thresholds are set per KPI with an upper and a lower limit, which decide how each indicator reads for that team.
The indicators include Closed Incidents, Customer Satisfaction (CSAT averaged from survey results, with agent and team breakdowns), Quality (a calculated assessment feedback score), Average Handling Time (the mean time taken to resolve an incident), First Call Resolution (the percentage of incidents resolved on first call) and Trainee Quality Rating. Incidents triaged by VA counts incidents the Virtual Agent creates, and it needs the ITSM Virtual Agent Conversations application installed. Managers use the Teams views to follow trends for each group and agent, compare team members, spot skill gaps and select a location on the time-series chart to drill down further.
Setting up service channels, queues and assignment rules
A service channel is the means by which one type of work item reaches agents. Admins can edit the channels that ship with the suite or build a custom one. Queues are created from the Queues list or from a channel’s Queues tab, and each queue is recorded under its channel.
Routing depends on assignment rules, which let the Advanced Work Assignment engine send work based on availability, capacity and skills. Create the rule before the service channel it will serve, then attach it to a queue from that queue’s Assignment Eligibility tab. The eligibility record asks for a rule name, an Eligible at duration that sets how long the rule holds for a set of agents, and the groups eligible for assignment. Eligible groups can also receive overflow work for that queue. Saving the record updates the queue with the eligible assignment group.
Configuring channel KPIs, queue measures and supervisor lists
Channel KPIs are reports added on the Reports tab of each service channel. Start with the channel management reports that ship by default, or create a single score report for a measure they miss. To scope a custom report to teams, add it to the Channel Management Groups interactive filter, which filters the dashboard without changing the report. Reports receive order numbers starting at 100. The first five on a channel appear on its card. Reports also have interactive filters for agent (sys_user), group (sys_user_group), queue (awa_queue) and service channel (awa_service_channel).
Channel KPIs track the ongoing work and real-time performance of your teams. Managers can drill down from them into queues to monitor ongoing incidents, interactions and tasks.
Supervisor lists show active work items across channels and queues. Each list reads from a database view, and that view defines the table joins, such as incident, interaction and metric. A channel can hold three lists. The three with the lowest order numbers appear in Channel Management. Each list needs a title, a tab title, the channel, the view name and an order. To add one, open Channel Management, select Service Channels, open the channel, go to its Supervisor Lists tab and choose New.
Sort order is adjustable through the sn_channel_mgmt.ChannelMgmtExtensionPoint scripted extension point, which controls the All Agents and All Queues lists. If several implementations exist, the lowest order number runs.
Routing work and adjusting agent capacity
Skill-based routing sends each item to an agent whose skills match it. Managers can allocate a pending item to an agent by hand, join an agent’s chat to help resolve a case, and view the agent’s details. Managers also watch incoming and ongoing work for each channel and queue, and track real-time performance for their direct reporting teams and for any additional teams they oversee. Thresholds are set in a separate step for each KPI in a group.
Capacity is the number of work items an agent handles at once for one service channel. A manager can override it for a single agent at a time, provided that agent is associated with Advanced Work Assignment and the channels involved. The override lasts 12 hours by default. The sn_channel_mgmt.awa_agent_temporary_override_time.minutes property changes that duration, and a scheduled job runs every two minutes to return expired overrides to the previous value.
To change it, open the agent’s record from the Channels or Teams view, go to the Overview tab, select the channel in the Channels section, choose Capacity Override, enter the new value and apply it.
Roles and properties at a glance
| Role | Grants |
|---|---|
| Teams Admin (sn_team_perf.team_performance_admin) | Create and configure KPIs, KPI groups and assignment groups |
| Teams Manager (sn_team_perf.team_performance_manager) | Team Performance module in Manager Workspace |
| Channel Management Admin (sn_channel_mgmt.admin) | Create, read, update and delete channel reports and queue report tables |
| Channel Management User (sn_channel_mgmt.user) | Read access to the same tables |
| Property | Default | Effect |
|---|---|---|
| sn_team_perf.kpi_group.max_parent_kpis | 5 | Parent indicators per KPI group |
| sn_team_perf.kpi_group.max_supporting_kpis | 10 | Supporting KPIs per parent |
| sn_team_perf.ws.max_assignment_groups | 15 | Groups shown in Manager Workspace, by order |
| sn_optimize.default_date_range | 30 | Default date range picker value |
| sn_channel_mgmt.list_auto_refresh.interval.seconds | 30 | Supervisor list data refresh |
| sn_channel_mgmt.kpi_auto_refresh.interval.seconds | 5 | Indicator score refresh |
| sn_channel_mgmt.channel_card_auto_refresh.interval.seconds | 120 | Overview card refresh |
| sn_channel_mgmt.filter_config.enable | true | Shows the Assignment Group interactive filter |
Channel management properties must be added to the System Property table before they take effect. The channel reports give a supervisor the day’s picture, such as interaction work items still unassigned, incidents with breached SLAs, open P1 incidents and agents available to take interactions.
Deprecation status for new instances
From the Brazil release, Workforce Optimization for ITSM is being prepared for future deprecation. It is hidden and no longer installed on new instances, but it continues to be supported. For a new project, check whether the modules can be installed on the target instance before designing around them.
Frequently asked questions
Can an assignment group belong to more than one KPI group?
Yes. An admin can add an assignment group already in one KPI group to another. One or more KPI groups can be associated with one or more assignment groups.
Why does the KPI group form show the wrong related list?
The Type field must be set to Teams. Other types, such as Channels, are not supported in Team Performance, so the related list shows a default list instead.
How long does a temporary capacity override last?
The default is 12 hours. A scheduled job checks for expired overrides every two minutes and returns the agent to the previous capacity. An administrator can change the duration with the override time property.
How many supervisor lists can a service channel display?
A channel can be configured with three supervisor lists. The three with the lowest order numbers appear in Channel Management, so the order field controls which lists a supervisor sees first.
Does copying a KPI group also copy its assignment groups?
No. The copy keeps the KPIs and thresholds, but the assignment group mapping is left out, so the copied group needs its own assignment groups before it reports on a team.