Set-up of the Walk-up Experience application centers on the physical walk-up location. Each location carries its own online check-in and kiosk settings, queue rules, stockroom and hours, so build the pieces in order. Activate the plugin, set the roles and the on-site login, then configure the location and the services attached to it.
Activate the application and assign roles
Activate the Walk-up Experience plugin, identified as com.snc.walkup, from a user with the admin role. The plugin includes demo data, which is useful for trying the screens before you configure a live location.
Day-to-day configuration belongs to the walk-up roles. The table shows what each one is for and what it contains.
| Role | Purpose | Contains |
|---|---|---|
| sn_walkup.walkup_login | Signs in the on-site check-in device | No other roles |
| sn_walkup.walkup_technician | Works the queue at the location | Interaction agent, workspace agent, AWA agent and appointment booking user roles |
| sn_walkup.walkup_manager | Manages technicians, opens the dashboard | Technician role and appointment booking manager role |
| sn_walkup.walkup_admin | Configures modules, portal and locations | Manager role and related admin roles |
The administrator role contains the manager role, and the manager role contains the technician role, so granting the top role to a counter agent gives far more access than the counter needs.
Configure the portal and its check-in settings
Branding is set per location: a header logo, and a queue logo for the on-site display. If no header logo is set, the Walk-up Portal logo is used.
Each location can have an online check-in portal, where a requester joins the queue from a laptop or phone, and a physical check-in portal on a device at the location.
The online check-in icon on the Service Portal home page is set up in Service Portal Designer, where it can replace the Get Help icon link.
Secure the on-site login and explicit roles
The on-site portal should not run under an administrator’s own account. It is accessed through an account holding only the sn_walkup.walkup_login role, and the admin role cannot be used to access the portal. Internal and external users both enter the queue on the check-in device, usually a tablet. Signed-in internal users can also check in online.
The Explicit Role plugin, com.glide.explicit_roles, assigns users either snc_internal or snc_external. Activating the Walk-up Experience plugin assigns the walk-up user snc_external automatically. When the Explicit Role plugin is activated, all existing users are automatically assigned snc_internal, so check which explicit role the portal login user and any kiosk login user hold afterwards.
Build each walk-up location record
The location record holds everything about one support venue. Open Walk-up Experience, then Administration, then Walk-up Locations, and either open an existing location or select New. The main form includes a name, a description, a schedule, an appointment booking plan, the Walk-up service channel and a stockroom. Routing can use Simple or Advanced condition mode. Simple mode decides who provides support at the location, with the location identified by its physical address.
Active marks the location as in use. Enable away state closes it, and the away message tells requesters it is temporarily closed outside the scheduled hours.
The Management tab controls queue behavior. Position notification sets the queue position that triggers a message, so a value of 3 tells the requester they are third in line. Last check-in sets how many minutes before closing the final check-in is accepted. Maximum appointments per user is set to 1 automatically, and changes apply to future bookings. The estimated wait time uses the average wait and the number of people in the queue, rounded to the nearest minute. It needs the Advanced Work Assignment queueing system.
The Administration tab controls what people see. The queue time display can be off, show the check-in time, or show the time waited or remaining. The closed record producer decides what a requester does when the location is closed; Create Incident redirects them to open an incident. A badge scan is not an authentication mechanism, so do not treat it as proof of identity.
After saving with Update, review the related tabs: Interactions, Walk-up Appointments, Reasons for Visit, Walk-up Location Kiosks, Assignment Eligibility, Work Item Sort Order and Location Queues Badge Readers.
Set up stockrooms, schedules and notifications
A walk-up stockroom is a standalone Asset Management record. It holds the items visitors commonly ask for, such as computer mice, monitors and cables, and should sit close to the location. Create it under Walk-up Stockrooms, which requires the walk-up admin, asset user, inventory user or admin role.
Schedules define opening hours. Base-system defaults such as 8-5 weekdays excluding holidays are available, and New creates a custom schedule when none fits.
Notifications reach requesters by email, SMS text message or push notification. Four base notifications come with the application: Walk-up Abandoned, Walk-up Threshold Notification, Walk-up Assigned and Walk-up Closed. Review each one, because its recipients and wording are set on the notification itself.
Configure surveys and skill-based routing
Two surveys are available out of the box. The Walk-up CSAT survey is a one-click, on-site survey on a three-point scale with three faces. The Walk-up Experience Satisfaction Survey is emailed when an interaction closes and uses a five-point scale. It covers overall experience, wait time, agent experience, agent professionalism and comments. Administrators and managers can edit both surveys and their trigger conditions, and review results question by question on the dashboard.
Skill-based routing matches each visit to an agent with the right skill. Skills, group skills and user skills must be defined first in the All Skills, Group Skills and User Skills tables. Then, for each location, open a reason in Reasons for Visit and add a Walk-up skill to it. A mandatory skill means the task is not routed to any agent who lacks it. If the skill is not mandatory and the matching agent is unavailable, the task follows the location’s assignment rule. An administrator must also activate the Skill determination for interaction BR on interaction table setting. Pilot one reason first, so you can see whether any available agent holds that skill before other reasons depend on it.
Connect Microsoft Office 365 calendars
The calendar integration sends invites and updates to Outlook when a requester books, changes or cancels an appointment. The Microsoft Entra ID application and Office 365 tenant must already be configured.
Confirm the Walk-up Experience, Microsoft Exchange Online Spoke and Microsoft Exchange Server Spoke plugins are active. Under System OAuth, register Microsoft Exchange Online with the client ID and client secret from the Entra ID application. Create an OAuth 2.0 credential using the Microsoft Exchange Online default profile, and run Get OAuth Token by signing in as a valid user on the Exchange tenant. Create a connection named Exchange_Online_Connection that uses the credential, pointed at the Microsoft Graph endpoint. Then activate the Create and the Update/Delete Walk-up Appointment Calendar Event flows in Workflow Studio.
Test with a dedicated user. Book an appointment as that user through the Walk-up check-in route then check Today’s Executions in Flow Designer and the user’s Office 365 calendar. The event can take a minute or two to arrive.
Check the set-up with quick start tests
The quick start tests confirm the application still works after a configuration change or upgrade. Copy and adjust them for your own data. They need the plugin active and demo data loaded. The set covers creating a location, and onsite check-in for ITIL, ESS and guest users. Run it after the location, portal and login steps, and again after each upgrade.
Queue operation, appointment booking and badge, online and kiosk routes each have their own page. The queue and agent fulfilment page covers the day-to-day queue, the appointment booking guide covers bookings, and the check-in routes page covers the check-in options. The IT Service Management hub lists the rest.
Frequently asked questions
Can the on-site Walk-up portal run under an administrator account?
Not as designed. The portal is accessed through an account that holds only the walk-up login role, and the admin role cannot access the portal. Use a dedicated login account for each check-in device.
What changes for the portal login account after an upgrade?
Review the explicit role on the portal and kiosk login users, since activating the Explicit Role plugin gives existing users snc_internal.
Do I have to build surveys from scratch?
No. Two surveys are included, one on-site on a three-point scale and one emailed on a five-point scale. Adjust their trigger conditions or questions first.
Does a badge scan prove who the requester is?
No. A badge scan check-in is not an authentication mechanism.
Why might a task sit unrouted when a skill is set?
Check whether the skill is mandatory. If it is, the task is not routed to any agent who lacks it. If it is not mandatory and the matching agent is unavailable, routing follows the location’s assignment rule.
Do changes to maximum appointments per user affect existing bookings?
No. The new limit applies to future bookings.