Walk-up Experience appointment booking runs inside the Appointment Booking application, with one service configuration per walk-up queue. An administrator activates the feature, sets schedules and exclusions, and creates a record producer for each location. Agents book or manage visits from Agent Workspace, while requesters book from online check-in, Employee Center or the Now Mobile app.
Confirm the plugin and roles before you configure
The feature depends on the Appointment Booking plugin, identified in the platform as com.snc.appointment_booking. Activate it first.
The walk-up administrator role, sn_walkup.walkup_admin, covers enabling the feature and the location settings. The appointment_booking_admin role covers service configurations and schedules. Agents who handle visits use sn_walkup.walkup_technician, and staff booking for a requester from an incident need the itil role.
Enable the feature and define a service for each queue
Open All > Appointment Booking > Appointment Booking Configuration and select the Walk-up Experience record. The base system ships with a default configuration that applies to all services inside the application unless a service overrides it. Read it first, then select Active to switch booking on.
In Walk-up Experience, a service is the physical location of a walk-up queue, so each queue a customer can reach needs its own Appointment Booking Service Configuration. Open it from the related list and select Active. An inactive service stops accepting bookings, though customers can still create work orders for it.
Queues often differ, so set the rule per service: one might book Monday through Friday while another books on Monday, Wednesday and Friday.
Once booking is active, the online check-in page shows a Schedule an appointment tab. A requester chooses a reason for the visit, then a date and a time from the open slots.
Create the record producer that captures bookings
A service configuration has to point at a catalog item, and for Walk-up Experience that item is a record producer. Create a separate one for each walk-up location so that each appointment carries the right location context.
In the Record Producers list, create a new record with a distinct name, set its table to Walk-up Appointment [wu_appointment], and add a short description. Save it, reopen it, and on the Variable Sets tab add sn_appointment_variable_set and sn_walkup_variable_set. The required fields on the service configuration read their values from these variables, so the fields need them.
Back on the service configuration, set the Catalog item field to this record producer and the Availability table to the Walk-up Appointment table. Two fields need care. The Location field sets the time zone of the scheduling calendar. If you pick a location record, the calendar shows that site’s time zone; if it is empty, or the requester has no time zone preference, the calendar uses the requester’s own. The system also uses the schedule on the Walk-up Location Queue when a requester books, so keep the two forms aligned.
Set User contact to Contact, a reference field that looks for a sys_user variable on the record producer. If you tick Appointment is mandatory, the requester must pick a slot before submitting. Leave it unticked and the request can go through without one.
Set the schedule: hours, day-level slots and exclusions
Lead time defaults to four hours, the shortest notice a requester can give. Future bookable max days defaults to 14. Reschedule or cancel by time also defaults to four hours, and inside that window the Cancel button is no longer offered. Work duration defaults to one hour. For on-site work, set travel duration (round trip) to 0.
Bookable days default to Monday through Friday, with a daily start of 9:00 and a daily end of 18:00. The appointment schedule is separate from the queue’s own schedule and should match its days and hours, so requesters do not see slots the queue cannot staff.
For different treatment across the day, select Enable Advanced Configuration on the service configuration and add records to the Appointment Booking Day Configuration related list, such as Morning, Afternoon and Evening. Each record has its own active flag, start and end dates, daily hours, work duration, travel duration (default 15 minutes round trip), appointment window and appointments per window.
The appointments-per-window count applies under manual assignment. Under auto-assignment or dynamic scheduling it is ignored unless the appointment has no location. Choose the assignment method before you enter the number.
Exclusions use schedule entries. Open Walk-up Experience > Administration > Schedules, select the schedule in use, and add a Schedule Entry with Type set to Excluded and Show as set to Busy. Set When to the start date and the hours to close, Repeats to the recurrence, and Repeat until to an end date. Excluding 12:00 p.m. to 5:00 p.m. on Tuesdays and Thursdays, for example, leaves those days open from 9:00 a.m. to 12:00 p.m. Check the result in the Walk-up Check-in application.
For off hours across several days, create a schedule such as Off hours schedule and add entries for the closed times, such as Friday after 1:00 p.m. Add the default off-hours schedule for your country as a child schedule. In the United States that is the U.S. Holidays schedule, which excludes holidays and overrides the off-hours entries. Then change the Holiday Schedule field on the location’s configuration to the new schedule, and set start and end times on its Daily Schedule tab.
Turn on reminders
Reminders need two changes. First, activate the scheduled job: go to System Definition > Scheduled Jobs, search for Appointment Booking Reminders, select Active, and select Update. Second, expose the setting, because the Appointment reminder field is not on the service configuration form by default. Open the service configuration, choose Configure > Form Layout, move Appointment reminder to Selected, and save.
Then choose the timing in hours before the appointment. A value of two sends the reminder two hours ahead. Reminders stay inactive until a configuration is set, so check each service you want to notify.
Set location rules: appointment type and booking limits
The Walk-up Location record holds rules above the service configuration. Its Management tab includes Maximum appointments per user, which defaults to one. Raising it lets a requester hold more than one future visit there. Changing it does not affect existing bookings. A tech lounge that supports follow-up visits might set it to two, so a requester can book a drop-off and a pick-up in advance.
The same tab sets Appointment routing time, the minutes before a booking at which the work item goes to an agent.
On the Administration tab, Appointment type offers In-person, Remote or Both. Remote visits pair with Microsoft Teams. The agent is told the interaction is remote, can start a conversation with the requester on Teams, and carries that context into the walk-up interaction. A requester who books remotely can still have the issue resolved at the location.
How agents handle scheduled appointments
Agents and managers see upcoming bookings from All > Walk-up Experience > Agent > Scheduled Appointments, which covers the next 14 days. Open an appointment to see the requester name, the interaction number and description, and the time.
To start the work, select Accept appointment on the Walk-up Appointment form. You can assign the appointment to a colleague and add work notes before selecting Update. If a significant amount of time passes and the requester has not arrived, delete the appointment from the same form. Upcoming bookings also show a small calendar icon beside the requester’s name on the on-site queue monitor shortly before the start time.
Agents can also book for a requester when a follow-up visit is needed to resolve an incident. From the navigation list, select List, then under Incidents select Open or Assigned to me and open the incident. Select the More actions icon, choose Book Walk-up Appointment, complete the Walk-up Appointment Booking window, and select Submit. The platform creates the appointment record and notifies the requester.
How requesters book and change appointments
Requesters can book through Employee Center. From the IT topic in the portal mega menu, select the link to plan a walk-up visit, or select Walk-up visits under My active items. On the check-in page, open Schedule an appointment, choose a reason, select the calendar icon, pick a slot, and choose In-person or Remote if the location accepts both. Then select Schedule appointment. Confirmations appear under Your upcoming appointments.
On the Now Mobile app, open a lounge through Services, then the more options icon and Visit a Tech Lounge. The Information tab also works: choose the headphones icon, pick a lounge, and select Make Appointment. The form asks for a reason, a date and a time slot. A closed date hides the time slot, so pick another day. Some lounges do not accept advance bookings. If the Maximum future bookable day field is missing from the lounge’s details, that lounge does not offer them.
Changes follow a cut-off that each lounge sets. A confirmed appointment cannot be modified inside that time limit. Suppose the limit is two hours and the appointment is at 10:00 a.m. Then changes close at 8:00 a.m. the same day. Before the cut-off, the requester can still cancel or reschedule the visit.
Frequently asked questions
Can a requester book more than one appointment at a location?
Yes, up to the Maximum appointments per user limit, which defaults to one. Existing appointments are not changed when the limit moves.
Why does a time slot disappear after I pick a date?
The lounge is closed or takes no appointments that day, so the slot is hidden. Pick another date.
Why are reminders not going out after I set them up?
The Appointment Booking Reminders job is inactive by default, and reminders stay off until a configuration is set. Activate the job, add the reminder field to the form and set the hours before the appointment.
Can an agent book a visit without the requester doing it?
Yes. From the incident, the agent chooses More actions > Book walk-up appointment. The platform creates the appointment record and notifies the requester.