OBLYTECH Logo
OBLYTECH Logo

ServiceNow Coaching with Learning: Paths, Catalogs and Courses

Coaching with Learning is the learning side of Workforce Optimization for ITSM. Managers use it to build learning paths from internal and external course items, organise them into course catalogs, and assign courses to agents with due dates. This guide covers the roles, setup steps and settings involved, based on the Brazil release.

Where Coaching with Learning fits in Workforce Optimization for ITSM

Workforce Optimization for ITSM installs its roles and tables when its plugin is enabled. Coaching with Learning is a separate add-on from the ServiceNow Store, turned on as part of activating the Workforce Optimization for ITSM configurable workspace. Once active, the coaching area of the Manager Workspace gains a Learning tab that holds learning paths, course catalogs and course lists.

Check the deprecation status first. Starting with the Brazil release, Workforce Optimization for ITSM is being prepared for future deprecation. It will be hidden and no longer installed on new instances, but it will continue to be supported.

Roles that control who builds and who learns

Role Identifier What it allows
Learning admin sn_lc.learning_admin Create, read, update and delete catalogs, learning content and roles; configure learning sources
Learning course catalog admin sn_lc.learning_course_catalog_admin Create and update learning course catalogs
Learning catalog manager sn_lc.catalog_manager Create and update learning libraries
Learning catalog group manager sn_lc.catalog_group_manager Create and update learning libraries based on groups
Learning content writer sn_lc.content_writer Read or write access to learning courses
Learning content advisor sn_lc.learning_advisor Assign learning tasks
Learning task creator sn_lc.task_creator Read or write access to learning tasks

The learning admin role contains the catalog manager and integration framework admin roles. The catalog manager and catalog group manager roles each contain the task creator and content writer roles.

Coaching has separate roles. The coaching admin role covers opportunities, assessments, training and skills. The coach role is required to open the Coach Dashboard. The trainee role adds training, assessment and skill records for the person being coached.

How to build a learning path from course items

A learning path is an ordered list of courses on one topic, tied to a set of skills. Building one uses the workspace manager role (sn_wfo_cfg_ws.manager).

  1. Open the Manager Workspace, select the coaching icon and the Learning tab, then go to Learning Paths and All learning paths. Search by keyword or narrow the list with the skill filter.
  2. Select Create new path, enter a unique path name and choose the course catalog it belongs to. Select Next to save the path as a draft.
  3. Search for course items, filter them by skill and preview them. A quiz can be added as a course item. Tick the items you want and select Add items.
  4. Drag the items into the order the trainee should follow. The Course skills field fills from the selected courses; add or remove skills and items as needed.
  5. Select Next to reach the Publish screen, which shows the agent view and a Curriculum section. Select Save to come back later, or Submit to publish through the publish flow.

Skills are not just labels. When an agent completes the path, the skills linked to it are added to the agent’s profile.

Course catalogs and user criteria

A course catalog holds course items and learning paths, and its user criteria define which users can access them. Creating a catalog uses the WFO for ITSM admin role (sn_wfo_cfg_itsm.admin). Open the Learning tab from the coaching icon, go to Learning course catalogs and All course catalogs, and select New.

The publish flow can be customised for any catalog other than the Default Catalog.

Assigning course items and tracking due dates

Assignment uses the WFO for ITSM manager role (sn_wfo_cfg_itsm.manager). Open Learning, then Learning Courses and All Courses. Each course card shows the duration, the type of item (a URL or a knowledge article), whether it is internal or external, and its skills. Select the assign icon on a course. Choose To my groups to assign it to all groups that the manager directly and additionally manages, or To specific groups or team members to narrow it down. Tick Mandatory if the agent must finish by a date, set the Due date and select Assign.

Two highlights help a manager pick courses: a “Most taken” label on the course agents take the most, and a “New” label on courses created less than five days before the current date.

Bringing in external courses from third-party systems

Four spokes come available by default for external content: Cornerstone, Pluralsight, Udemy and ServiceNow University. When the integration is set up, each one creates a source record in the Enterprise Service Management Integrations Framework automatically.

Each source still needs an integration service. Add one in the source’s related list with a name, a flow, an application, an order that sets when transformation scripts run, and a service type. Scheduled pull runs on a schedule. Ondemand Push adds a retry policy for records whose previous push failed.

Pluralsight uses an API key. Cornerstone and ServiceNow University need an OAuth application registered with the provider and then authenticated from ServiceNow. Udemy’s logos and course reassignments are configured manually in the learning system configuration table.

Before the first pull, set com.glide.transform.json.max-partial-length and com.snc.process_flow.reporting.serialized.val_size_limit to 1638400. A pull fails when the content it brings in exceeds the word limit these properties set.

Activate the four sync flows in Flow Designer: Cornerstone, Pluralsight, Udemy and ServiceNow University. Then open Learning System Configuration and set Active to true for each source. The full_pull property controls the scope of each run. Setting it to true refreshes all content, which is recommended on a regular basis; false brings in new and updated services. Run Job on the integration source starts a pull. Content lands in the Learning External Content table, and managers open external courses from the Learning tab in the Manager Workspace (Learning Courses, then External Courses) and select Go to course.

Coaching assessments, learning tasks and skill awards

A coaching opportunity is a point in a task’s life cycle, on an incident, problem, change request or request item, that generates an assessment when its conditions are met. The example triggers are an incident that breaches its SLA, a phone call longer than 10 minutes, a chat longer than 30 minutes and a walk-up interaction longer than 60 minutes.

The assessment goes to a coach, who can review the trainee’s skills, assign course items as training and start a coaching survey. A virtual coach is an optional record linked to an opportunity. When an automatically generated assessment meets the conditions of a linked virtual coach, the course items on that virtual coach are attached to the assessment automatically, and the assessment can be completed using that automated virtual learning content.

Skills can be assigned to a trainee automatically for specific skill levels, based on the course items they have completed. Take an escalation that needed router skills the agent did not hold. A learning path built around router skills adds them to the agent’s profile when the agent completes it.

Coaching Recommended Trainings is being replaced by learning tasks and course items from Coaching with Learning. Its deprecation property is set to true by default, so new work should use learning tasks. The Coach Dashboard, which requires the coach role, reports on the progress of active assessments, the follow-up actions they need, and the effect coaching has on each trainee.

Timing, recommendations and retention settings

The properties below control timing and what agents see.

Property What it controls Default
sn_coach.lrn.exclude_weekends_on_learning_task_due_date Skips weekends when a learning task due date is set true
sn_coaching.exclude_weekends_on_training_due_date Skips weekends for training due dates true
sn_coach_lrn.learningpath_detail_viewmore Course item records shown on a learning path page in the Service Operations Workspace 50
sn_coach_lrn.sn_lc_enable_recommendations Turns learning path recommendations on or off Yes

Two properties govern content size. com.glide.transform.json.max-partial-length sets the word limit for records fetched through an API call; its default is 16384, and it has to be added as a system property before a different value takes effect. com.snc.process_flow.reporting.serialized.val_size_limit sets the bytes allowed for runtime values in each flow step, and a value of zero or less prevents truncation. Seven recommendation groups are available by default to the user’s primary assignment groups, covering work items, team activity, previous courses, popular courses and new library or catalog items. A default group can be deactivated by setting its Active field to false in the Recommendations related list on the Context form, but it cannot be deleted.

Course activity records feed those recommendations and are kept for 365 days by default. To change the period, open the auto flush list with sys_auto_flush.LIST, select the Learning User Course Activity table, and set Age in seconds.

Frequently asked questions

Does Coaching with Learning need its own plugin?

Yes. It comes from the ServiceNow Store as the Coaching with Learning plugin, enabled as part of activating Workforce Optimization for ITSM.

Can a learning path include a quiz?

Yes. A quiz can be added as a course item while the path is being built, alongside ordinary courses.

Why does a third-party content sync fail?

A pull fails when the content it brings in exceeds the word limit in the two sync properties. Set both to 1638400 before the first pull.

Are weekends counted in learning due dates?

Not by default. Learning task and training due dates both skip weekends unless the matching property is set to false.