Walk-up check-in is how a requester joins an on-site IT queue at a walk-up location. Three routes feed that queue: a badge scan at a reader, online check-in through the Service Portal, or a kiosk offering one service. Badge reader setup has four stages: client software, reader registration, activation approval, and mapping the reader to a walk-up location.
How the three check-in routes fit together
Walk-up Experience is the ServiceNow application for in-person and remote IT help at walk-up centers. Whichever route a check-in takes, it creates an interaction in the location’s queue, and agents work that queue in check-in order.
| Route | Who starts it | What has to be configured | Role that does the work |
|---|---|---|---|
| Badge reader | An employee scans a badge at a reader on site | Reader registration, activation approval, event handler, user badge mapping, location mapping | Badge admin and walk-up manager |
| Online check-in | A requester, from the Service Portal | Home page icon and self-service menu visibility | Service Portal admin and walk-up admin |
| Kiosk | A requester at the location | One kiosk record for each service offered | Admin |
Setting up badge reader check-in
A badge scan saves a requester from looking up a name or email before joining the queue. It is a way into a queue, not a login step. The integration sits inside the facility’s existing security perimeter and does not connect to access control software, so a scan is not proof of identity.
Setup runs in four stages: build the client software, register the reader, request activation approval, then point Walk-up Experience at the reader. The event handler and user badge mapping come first, because the reader record refers to both.
Activate the plugins and assign the roles
Walk-up Experience (com.snc.walkup) and Badge Reader Integration (com.snc.badge_reader) must both be active. Badge Reader Integration is activated automatically with Walk-up Experience through a conditional plugin.
Administering the integration requires the Badge admin role (sn_badge.badge_admin).
Build the client software
The client talks to your reader hardware, and macOS and Linux are the named platforms. You create your own badge reader client software. The Device Identifier must match the device serial number that the client sends.
Define the user badge mapping
A badge number alone does not identify a person. The facility code, a site code encoded on each card that identifies the organization, is needed too. The integration ships with a User Badge table (sn_badge_user_badge) that links a user, a badge number and a facility code.
Go to All > Badge Reader Integration > User Badge Configuration and click New. Enter the Name, the Table Name, the User Field, the Badge Field and the Facility Code Field. Active is selected by default. You can define several configurations, and each reader picks one.
Write the badge event handler
The event handler holds the code that runs when a badge is scanned. Go to All > Badge Reader Integration > Badge Event Handlers, click New, enter a name and an optional short description, and write the code in the Script field. The Application field stays Global until the script names the Walk-up Experience application and the record is saved.
Register the reader device
Both routes create a Badge Reader record under Badge Reader Integration > Badge Readers.
The manual route starts with New. Enter a Name, select a Badge Event Handler, type the Device Identifier and select the User Badge Configuration. The Device Identifier uniquely identifies the reader hardware, and the Secret Key fills in on creation. Status is read-only and moves through New, Activated and Deactivated.
The assisted route uses the badge reader client. First set two system properties to True. The property sn_badge.enable_scan_registration lets badge admins register a device by scanning a badge. The property sn_badge.disable_access_token removes the access token requirement for the Badge Reader Integration API. Changing the access token setting alters how the API accepts requests, so log the change. Then run the client and swipe a badge admin’s badge on the reader. The Device Identifier and Secret Key populate on the new record, and you add a name and a handler before submitting.
Request activation approval
A reader does not trigger event handlers until it is activated. Select Request Activation on the Badge Reader record once its required fields are filled in. An itil-role user in the badge reader approvers group approves the request. If that group is missing or empty, a badge admin’s request activates the reader. Clearing the Active field deactivates it, and reactivation runs approval again.
Map the reader to a walk-up location
Go to Walk-up Experience > Administration > Walk-up Locations, open the location, and use the Location Queues Badge Readers related list. Click New and complete Badge Reader, Location Queue, Check-in reason and Check-in reason description. A location can have several readers, but each reader maps to one location. A check-in reason on the reader fills in automatically at check-in; without one, the location’s reason applies.
Online check-in from the Service Portal
Setup has two parts: a home page icon and a menu entry that must be switched on.
Place the check-in icon on the home page
The Service Portal for Enterprise Service Management (com.glide.service-portal.esm) must be active, and you need the sp_admin or admin role. In Service Portal Designer, open the Service Portal index page in edit mode. Edit the existing Get Help container, or add a new one so the Get Help link stays.
In the container form, set the type to Page and select the walkup online checkin page. Use Walk-up Check-in as the title and a short description, such as checking in to an IT walk-up location to make a request or report a problem. Choose the Circle Icon template. Save, then check the home page.
Turn on the self-service menu entry
The online Walk-up Check-in module is hidden by default. With the sn_walkup.walkup_admin or admin role, go to All > System Definition > Application Menus, clear the default filter, and open itil_self_service. Find Walk-up Check-in in its Modules list and set Active to true on the Visibility tab. The mobile_self_service menu has its own Mobile Modules list.
Book an appointment instead
Employee Center offers a second online route. The requester opens the IT entry in the portal’s mega menu and selects Walk-up: Plan your visit. They can join the queue now or use the Schedule an appointment tab, choosing a reason, a time slot and, where the location accepts both kinds, in-person or remote help. For the administrator side of appointments, see the appointment booking setup guide.
Kiosks at a walk-up location
A kiosk is a platform for one specific service. A location can host several, depending on its business process. Financial organizations, hospitals and IT companies are examples of organizations that could use kiosks.
Go to Walk-up Experience > Administration > Walk-up Locations, select the location, and click New on its Walk-up Location Kiosks related list. Name must be unique. Write the Description around the one service that kiosk handles. Active makes it available, and Location queue fills in with the current location. This step needs the admin role.
What happens after a requester checks in
Each check-in creates an interaction in the Queued state. Queues serve requesters first come, first served. For how agents work these queues, see the walk-up queue and agent fulfilment guide. When an agent accepts an interaction or is assigned one, it moves to Work in Progress. VIP requesters are flagged in the interactions list, and an agent can move them to the front by helping them first.
Interactions can be pushed to a personal inbox in Agent Workspace, based on agent schedules and assignment rules, or agents can work the manual modules such as My Assigned Walk-ups.
If a problem is not resolved at the counter, the agent can create an incident or a Service Catalog request from the interaction. An interaction goes On Hold when a requester is absent for an appointment or the work runs long, such as an operating system upgrade. A requester who leaves before receiving help can be recorded as Closed Abandoned.
A walk-up interaction is valid for check-in or appointment because the check-in or appointment interface creates it. Creating one by hand in a table is not supported, and agents cannot check a requester in on their behalf.
Keeping badge check-in reliable
The Badge Scan Logs module, at All > Badge Reader Integration > Badge Scan Logs, records badge reader integration error events. It does not display error messages for Walk-up Experience badge scans, which are recorded in the System Log instead. Select an entry to see its Message, Badge Reader and User Badge, then fix the cause and run the scan again.
The integration’s script includes are read-only, so customization goes through scripted extension points:
| Extension point | What it controls |
|---|---|
| sn_badge.BadgeReader | Finds a reader by its device identifier |
| sn_badge.BadgeReaderParser | Parses the card data string the API receives |
| sn_badge.BadgeReaderUser | Finds a user from a badge number and facility code |
| sn_badge.BadgeReaderScanProcessor | Manages the badge scan event |
If badge numbers already live in your own data model, BadgeReaderUser is the extension point to change.
Frequently asked questions
Does a badge scan log a person in?
No. Badge Reader Integration is not an authentication mechanism. It is a faster way to join a queue, meant for use inside the facility’s existing security perimeter.
Does a new badge reader work straight away?
Not until it is activated. Event handlers do not run until approval is granted.
Can one reader serve two walk-up locations?
No. Each reader maps to one walk-up location, though a location can have several readers.
Can an agent check a requester in for them?
No. Agents cannot check a requester in to a walk-up location on behalf of an end user.
What makes the Walk-up Check-in icon appear for requesters?
Place the icon on the Service Portal home page in Service Portal Designer, and enable the Walk-up Check-in module under Self-Service, which stays hidden until switched on.