OBLYTECH Logo
OBLYTECH Logo

Measuring and reporting mean time to resolve in ITSM

Mean time to resolve in ServiceNow is an average, so it is built from two parts: a total of resolution durations and a count of incidents. Avoid the built-in Average aggregate on an automated indicator, because it can complicate time series. Build a Sum indicator and a Count indicator instead, then divide the Sum by the Count in a formula indicator.

Building the figure from a sum and a count

An average is no sounder than its two inputs. The total is the sum of each incident’s resolution duration, and the count is the number of incidents that contribute one. Keeping them as separate indicators lets a reviewer check the count directly, and a period with an unusual number of incidents stays visible in the data instead of disappearing into the mean.

A formula indicator calculates its score when someone views it on a dashboard, in KPI Details or in the Analytics Hub. The MTTR score is therefore the division of whatever the two underlying indicators hold at that moment, which matters when a figure read today is compared with one captured earlier.

For a one-off figure rather than a tracked indicator, a report can serve as a snapshot. Use indicators for a trend.

Setting aggregates, direction and blank values

Each automated indicator reads from an indicator source and applies one aggregate. Count counts records. Count distinct counts unique values, so a value that appears on several records is counted once. Sum, Minimum and Maximum aggregate the values of a field, or of a script when the Scripted option is selected. The base platform’s Summed age of open incidents indicator is a Sum built on a script, which shows the pattern for a duration total.

Value when nil is the score inserted when no value is collected. It is not used to calculate formulas or aggregates such as an average, so a blank duration does not quietly become zero inside the MTTR calculation.

The Direction field tells analytic tools whether a rising score is good (Maximize), a falling score is good (Minimize), or direction does not matter (None). An MTTR score is typically read as a figure that should fall, so Minimize matches that reading.

Trend lines with time series aggregations

A time series aggregation pairs a math function, such as AVG or SUM, with a time formula, such as By quarter. Three types suit MTTR trends. A Period series moves the data to a less frequent interval. A Running series smooths spikes so the direction is easier to read. A To date series gives a cumulative figure from the start of the month, quarter or year.

Partial periods need care. A series that includes the current period, or the beginning of data collection, carries a plus sign in its name and needs data from one day of the period. Partial periods can skew averages, so a monthly mean built on an unfinished month is not comparable with a complete one. Business and fiscal calendars do not support time series aggregations.

For a formula indicator, check which scores a time series is applied to, and state that on the report. A date range selector can also surprise you: a By month SUM series with a three-month selection can show four months of scores.

Splitting the figure with breakdowns

Breakdowns group or filter indicator scores by a qualitative attribute, such as Priority, Category or Assignment Group. The values inside a breakdown are its elements. Elements come from a breakdown source or from values entered by hand on a manual breakdown.

For MTTR, the useful breakdowns are the ones that show where the time goes. A company-wide mean can hide a queue that is slow to resolve, so grouping by assignment group or priority often tells you more than the overall figure.

Two details matter when a breakdown is applied to a ratio. A formula indicator inherits the breakdown matrices of the indicators inside it, and a contributing indicator can be set not to follow breakdowns. If the Sum follows a breakdown and the Count does not, the elements of the ratio no longer compare like with like. Check both settings before publishing a grouped MTTR.

Durations that depend on history: metrics

Some durations cannot be read from the incident as it stands today. A metric measures how well an IT service management process works. It can measure how long an incident takes to resolve, for instance. Metrics are gathered as the data is updated. Working out how long an incident sat assigned to one group means collecting each assignment change and calculating its duration.

The Metric Definition plugin provides the declarative setup, installed from System Definition, then Plugins. You define a metric of the Field value duration type on a field such as Assigned to, and a metric instance is created for each assignment showing its duration. Reporting on those instances can run through a database view that links the metric to its table.

Typically, a team that needs time per group rather than one total for the whole incident finds metrics the cleaner route. A count of incidents created today can be read straight from the table; a duration spent in a particular state usually cannot.

Choosing a clock and watching the resolution state

Task SLA records carry two sets of timings. Actual elapsed time is calculated 24×7. Business elapsed time follows the schedule in the task SLA, which comes from the SLA definition by default. If no schedule is set, business elapsed time equals actual elapsed time. The gap can be large. Consider a hypothetical incident opened at 4 pm on a Thursday, against a 9 am to 5 pm weekday schedule. Checked at 10 am on Friday, it would show 2 hours of business elapsed time (1 hour on Thursday, 1 hour on Friday) against 18 hours of actual elapsed time.

Pick the clock deliberately, keep it across the whole series, and state which one it is next to the figure. An elapsed average and a business-time average can differ sharply for incidents raised outside working hours.

Resolving and closing are separate steps. Resolving sets the incident to the resolved state and records the resolved date and time, the resolution code and the resolution notes. Closing requires the itil_admin or admin role. Resolved incidents can close automatically after a time set in the incident auto-close properties, so check those properties before comparing periods.

Using SLA records as a second source

An SLA definition sets the conditions under which an SLA attaches to a task, pauses, stops and resets. Its Target field is None, Response or Resolution, used for filtering, searching and reporting. The field appears on new instances starting with the Jakarta release. Definitions can sit on any table extending the task table, including incidents, change requests and service catalog tasks.

Each attached SLA is stored as a task SLA record in the task_sla table, with stages In progress, Paused, Completed and Cancelled. The Breached stage is available on the 2010 SLA engine or in its compatibility mode. Each record carries separate actual and business elapsed percentage fields, so confirm which one a report or notification uses.

Typically, a task SLA tells you whether a commitment was met on a given task, while an indicator or metric tells you how long a step took across many tasks. Use SLA records for compliance with a resolution target, and indicators or metrics for the average duration.

One build detail is worth checking. The SLA engine, including SLA Timeline and SLA Repair, replays the task’s audit history but considers the final value of a dot-walked field. A pause or stop condition on a field several references away can behave differently from the history you expect. A practical fix is a custom field on the task, populated by a business rule, that the SLA conditions point to instead of the dot-walked field.

Why should a ServiceNow MTTR figure be paired with P90 and reopen rate, and what does a mean-only figure hide?

A mean tells you the average elapsed time to resolve, and a fast average can come from incidents resolved too early and reopened. P90 is the time that 90 percent of resolved incidents finish within, so it exposes the slow cases. Reopen rate shows whether those resolutions held. Read together, the three show speed, tail and quality.

Why a mean hides the slow tail

The mean divides total elapsed time by the number of incidents, so a small group of long cases is averaged into a large crowd of quick ones. The figure can look steady while the slowest cases get slower.

A labeled illustration, not real data: most of a small set of resolved incidents close quickly, while a few wait much longer. The mean can look acceptable while the P90 still shows those slow cases. Percentile methods can disagree on the same data, so name the method beside the figure.

Why reopen rate sits beside speed

Speed can be bought by resolving early. If an incident is marked resolved before the fix is in place, the mean falls and the user raises the same problem again. Reopen rate counts incidents first resolved in a period that reopened within a fixed follow-up window. Count each incident once, however many times it reopens.

How to build the paired figures

  1. Define the cohort as incidents resolved in the period, timed to final resolution.
  2. Declare the percentile method and keep it fixed across periods.
  3. Set one fixed reopen window, such as a proposed seven calendar days, and reuse it for every period.
  4. Publish only matured cohorts, or label recent results as provisional, since later reopenings can restate them.
  5. Segment by priority and service before comparing groups, and show the incident count beside each figure.

What a mean-only figure hides

  • Shifts in mix. A changing mix of priorities can move the average without improving any individual service.
  • Work still open. The resolution cohort only includes an incident once it resolves, so a growing set of stuck incidents does not appear in MTTR until it closes. Pair the figure with backlog age.
  • Downtime. Ticket duration is elapsed time on a record, not downtime.

What to ask for when someone quotes an MTTR

  • The resolution cohort definition, and whether the clock is calendar or business hours.
  • P90 for the same cohort, with the percentile method named.
  • The reopen rate, its follow-up window, and whether the cohort has matured.
  • The incident count behind each figure, and N/A rather than zero where no incidents resolved.
  • Segments by priority and service, with the mean and P90 displayed together.

Frequently asked questions

What is the basic calculation behind MTTR in ServiceNow?

MTTR is a mean. A Sum indicator totals the resolution durations, a Count indicator counts the incidents, and a formula indicator divides the Sum by the Count. The formula is calculated when a user views it.

Why avoid the Average aggregate on an indicator?

Avoiding the Average aggregate on an automated indicator keeps time series simpler. Building the Sum and the Count separately keeps the trend view straightforward, and the average comes from the formula.

Which clock should an MTTR figure use?

Choose one clock and keep it for the whole series. Actual elapsed time runs 24×7, while business elapsed time follows the SLA schedule. The two can differ by a wide margin for incidents raised outside working hours, so state which one you used.

How do I see MTTR as a monthly trend?

Apply a By month time series, such as SUM or AVG, to the indicators. Decide whether the series applies to each contributing indicator or to the formula result, because the two give different figures. Watch for partial periods, which carry a plus sign in the series name and can skew averages.

What happens to a resolved incident before it closes?

A resolved incident stays in the resolved state until someone with the closure role closes it, or until auto-close runs after the time set in the incident auto-close properties. Check those properties before comparing periods.