OBLYTECH Logo
OBLYTECH Logo

Performance Analytics Widgets: Types and How to Pick One

Performance Analytics widgets are the tiles on a Core UI dashboard that display indicator scores. Seven widget types exist, and the right one depends on the question: a trend over time, a split across categories, a single current figure, or a group of indicators in one view.

Matching the question to a widget type

The business question decides the widget type, and the visualisation follows from that choice. A time series widget shows how scores change over a period. A breakdown widget groups scores by the elements of a breakdown, such as priority or assignment group.

Widget type Question it answers Typical visualisations
Time series How have the scores moved over time? Line (the usual choice), spline, step, column, stacked column, area, relative compare
Breakdown How do the scores split across categories? Scorecard, pie, donut, semi-donut, funnel, pyramid, column, relative compare, line, Pareto, pivot scorecard, treemap
Score What is the current figure, and is it on target? Latest score, speedometer, real-time score
List How do several indicators compare side by side? Scorecard, spider web
Pivot How does one indicator split across two breakdowns? Heatmap
Text analytics Which words recur in text users submit in forms? Word cloud
Workbench How is a multi-step process performing? Workbench

Building a time series widget

The line visualisation is the usual choice because it shows the trend. A column visualisation shows changes between scores over time as proportional vertical columns, which suits comparing one indicator’s movement or several indicators side by side. You can compare indicators by adding them to one widget, or by placing several column widgets side by side on a dashboard.

Adding a second indicator is a separate step. Save the widget first, because the Widget Indicators list appears once the record is saved. Choose New in that list, then pick an indicator, built as described in how indicators are defined, and a chart type that suits the primary one. Spaced order numbers, such as 200 and 300, let you add indicators later without renumbering. A time series widget displays one secondary Y-axis at a time, and if several secondary indicators request one, the first in order wins.

Three restrictions catch people out. A widget cannot hold both a previous period chart and widget indicators, and enabling the previous period chart clears the indicator list. A stacked column primary requires its secondary indicators to use stacked column too. Business and fiscal calendars do not support time series aggregations.

Breakdown widgets and how each visualisation reads

The visualisation changes how the proportions read, so choose it with the audience in mind. Pie, donut and semi-donut charts show relative proportions, but they become unclear when a breakdown has many elements or several very small ones. In those cases a column visualisation is clearer.

Funnel and pyramid charts suit breakdowns whose elements are stages. A funnel stacks slices from top to bottom in decreasing percentage, which fits a path from lead to closed deal. A pyramid stacks them in increasing percentage and often represents hierarchical levels in an organisation.

A Pareto chart combines descending bars with a cumulative line. The left axis counts records and the right axis shows cumulative percentage. Elements to the left of the point where the line crosses the 80 percent mark carry the greatest effect on the overall outcome.

A columns and total visualisation pairs a line of indicator scores with a column per breakdown element at each collection point, so you can see the score and its composition shift together. A stacked column shows element proportions inside one column per collection point, and a line visualisation shows those proportions changing over time.

Relative compare resembles a pie chart that also shows change. Its baseline is zero rather than the previous data point, so each percentage is measured from zero. Stock charts and population growth are the traditional uses.

Score and list widgets

A score widget shows an aggregate and can show it against a target. The latest score visualisation compares the current figure with the previous score, or with any number of periods back. A list widget shows the metrics for several indicators in a scorecard or spider web layout, and it needs either an indicator group or widget indicators.

Settings that shape breakdown and time series widgets

Settings sit on tabs for date, display, breakdown, element and column, and each visualisation exposes a different subset.

The period defaults to three months, written 3m, and can run to the current date or between two chosen dates. A date range selector on the widget changes the period but does not update the trend line. Combining a time series aggregation with that selector can show one more period than expected, because 3m is read as zero to three months.

Axis settings set the Y-axis title and range, and a second Y-axis range helps when scores sit in a narrow band with a few exceptions, such as a band of 40 to 60 with one value at 1,000. Display settings add a target, thresholds such as an all time high, data labels, a trend mini-chart, confidence bands, a forecast, or comments. Element settings narrow the elements on screen. Show top x keeps the highest scores under the Sort by field. On a tie, the first element in the scoresheet is shown, and that order follows the underlying table: Choice elements follow their Sequence value, while group elements sort alphabetically by name. Column settings add current score, trend, change, change percentage, target, gap and gap percentage. A positive gap means the score is moving toward the target.

Workbench process widgets

A workbench widget suits a process that moves through a workflow. Main indicators sit across the top, with a default maximum of seven set by the property com.snc.pa.widget.max_widget_indicators. Selecting a main indicator shows its supporting indicators and updates the score, trend and breakdown sections. Trend timespans follow frequency: 60 days for daily indicators, one year for weekly and monthly, three years for quarterly and 12 years for yearly. A time series aggregation changes these spans. If a supporting indicator is an aggregate, such as average age, the Records tab is hidden. Creating one requires the pa_admin, pa_power_user or admin role.

Personalised visuals for each viewer

A personalised visual shows information that depends on who is looking, such as the tickets assigned to a support agent or the tasks held by a manager’s team. You apply an element filter with a dynamic condition, such as [is (dynamic)] [me], in place of a fixed breakdown element. The standard filters are One of my groups, Groups I manage and Me.

Personalisation applies to time series, score and breakdown widgets, and to first-level breakdowns. When a filter returns several elements, score and time series widgets show one aggregated value, while breakdown widgets show each element separately. A filter is saved and reusable, names a breakdown source such as Users.Active, and its operator must be is (dynamic).

Roles, access and what viewers see

Creating or editing a widget requires the pa_admin or pa_power_user role, and adding it to a dashboard needs the same. Anyone can view a widget already on a dashboard. A viewer who is prevented from seeing a visualisation gets a warning to contact the administrator.

From the Quebec release onward, widgets follow indicator and breakdown access control lists, and no separate role is needed to view a widget outside those lists. Instances upgraded from an earlier release keep the older rules by default, and under those rules list, text and some workbench sections may require the pa_viewer role.

Time series aggregations are validated on the Analytics Hub and KPI Details but not inside widgets. A widget can therefore work on the dashboard and still show an invalid-aggregation warning once you open the hub.

Where this feature sits in the platform

Performance Analytics widgets belong to the Core UI front end, and the Performance Analytics for ITSM hub is the place to start if you are new to them. They are not supported on Platform Analytics dashboards or UI Builder pages, except to a limited extent when migrated in compatibility mode. The feature is deprecated and in maintenance mode, so it is not being extended, and it receives security fixes. For new reporting, the Platform Analytics route is Data visualizations in Platform Analytics and Filters in Platform Analytics.

Frequently asked questions

Can a viewer without an admin role see these widgets?

Yes. Any user can view a widget that has been added to a dashboard. From the Quebec release onward, what they see is governed by the indicator and breakdown access control lists.

Why does my date range show one more period than I selected?

A time series aggregation combined with a date range selector can add an extra period, because a period such as 3m is read as zero to three months.

How do I add a second indicator to a time series widget?

Save the widget first, then choose New in the Widget Indicators list. Select the indicator and a chart type, and set an order value such as 200 so you can add more later.

Why does a top-three widget show one element instead of another?

When elements tie for a place in the top three, the first element in the scoresheet is shown. That order depends on the underlying table.

Should new dashboards be built with these widgets?

Not by default. The feature is deprecated on Core UI. For new work, use the Platform Analytics data visualisation and filter components.