Task Intelligence supports different languages for incident field predictions, case field predictions, sentiment prediction, and language detection. Coverage depends on the model: a language supported for detection may lack field prediction support. Languages must also be included in the training dataset, so check both model coverage and training data before planning deployment.
Task Intelligence supported languages by prediction type
Start with the prediction you need, then check its language coverage. Treating Task Intelligence as a single multilingual capability can produce a rollout plan that promises more than a particular model supports. The language list contains 25 entries, but those entries do not apply equally across the four prediction categories.
For incident fields in ITSM, the supported languages and associated codes are:
- Brazilian Portuguese: pb; Chinese (simplified): zh; Danish: da.
- Dutch: nl; English: en; Finnish: fi.
- French: fr; French Canadian: fq; German: de.
- Italian: it; Japanese: ja; Korean: ko.
- Norwegian: nb; Polish: pl; Portuguese: pt.
- Spanish: es; Swedish: sv.
For case fields in CSM, coverage consists of English, French, German, and Spanish. For sentiment prediction in CSM, English is the supported language. These differences matter when an organization handles both incidents and customer cases: incident coverage does not establish that the equivalent case prediction is available.
Language detection in CSM covers Arabic, Chinese (simplified), Czech, Dutch, English, Estonian, Finnish, French, German, Hebrew, Hungarian, Italian, Japanese, Korean, Norwegian, Polish, Portuguese, Russian, Spanish, Swedish, Thai, and Turkish. Brazilian Portuguese, Danish, and French Canadian are not marked for that detection category.
The broader context is covered in the plain-language guide to Predictive Intelligence. For this decision, keep the boundary specific: identify the Task Intelligence prediction category before assessing whether a team’s working language fits.
Keep language names and codes together
Use the language name and its associated two-character code in your planning record. A name alone can hide a distinction that affects coverage. Brazilian Portuguese uses pb, while Portuguese uses pt. French Canadian uses fq, while French uses fr. Do not merge these entries because the names share a language family.
The remaining detection entries that do not appear in the incident list are Arabic with ar, Czech with cs, Estonian with et, Hebrew with he, Hungarian with hu, Russian with ru, Thai with th, and Turkish with tr. Their presence in detection coverage does not establish support for incident field predictions.
Build a short inventory with one entry per language and intended prediction category. Include the business team, the record text it supplies, and the expected prediction. This is a planning record rather than a product configuration procedure. It helps reviewers distinguish a language requirement from an assumption based on where a team operates.
For example, a Brazilian service desk may need Brazilian Portuguese incident predictions. A customer service team may need Portuguese language detection. Those requirements refer to different entries and different categories. Record them separately so that a decision about one does not silently approve the other.
Check the training dataset before accepting coverage
Language support requires the language to be included in the training dataset. A supported language in the coverage list is therefore a starting condition, rather than evidence that a particular trained model is ready for that language. Review the data selected for the intended prediction before treating coverage as a deployment commitment.
- List the languages actually present in the records intended for training. Review the text used for the prediction rather than assuming that a record’s location identifies its language.
- Compare that inventory with the supported languages for the specific prediction category. Keep mismatches visible instead of folding them into a general multilingual requirement.
- Identify the languages needed in the planned rollout that are absent from the selected training data. Hold those combinations out of the acceptance decision until the gap is resolved.
- Prepare evaluation examples for the language and business categories being considered. Use records whose expected outcome can be reviewed by someone who understands the text.
Consider a plan for English and German case field predictions. Both languages appear in that category’s coverage. If the selected training data contains English alone, the language list does not establish German readiness. The planning issue is the missing training language, even though the requested prediction category supports German.
Do not turn this requirement into an invented minimum record count or an accuracy promise. The language coverage topic supplies neither. Keep data sufficiency and acceptance criteria as separate review decisions, with evidence from the model and the business process under evaluation.
Turn coverage into a rollout decision
Use a language-by-prediction checklist to decide what enters the initial rollout. Give each proposed combination a clear outcome: proceed to evaluation, resolve a training data gap, or exclude it from the current scope. This prevents a broad statement such as “Spanish is supported” from standing in for a decision about sentiment or field prediction.
A Spanish case field requirement fits the coverage list; a Spanish sentiment requirement does not. A Japanese incident field requirement fits, while Japanese case field prediction is not listed. These examples show why the approval unit should be the language and prediction together, rather than a country, department, or application name.
Agree how work will be handled when a requested combination is outside the accepted scope. A team can retain human review for that work while evaluating supported combinations. Describe this as an operating decision, without assuming that Task Intelligence automatically supplies a particular fallback behavior.
For help planning this work, see ServiceNow implementation.
Check coverage against your instance and release before committing scope. Keep the release reviewed in the same planning record as the language inventory, so a later change can be assessed against a known baseline rather than remembered assumptions.
Before approving an expansion, write down the exact change being requested: adding a language to incident predictions, extending case predictions, or introducing language detection. Attach the relevant evaluation results to that request. A reviewer should be able to identify the proposed capability without reconstructing it from meeting notes. If several combinations are being proposed, decide on each separately so that a supported combination can progress while another remains unresolved.
Test outcomes separately for each language
Build acceptance examples around the text people submit. Ask reviewers to include ordinary requests, local terminology, and records that are difficult to categorize. These are evaluation choices designed to expose weaknesses; they are not additional claims about which language combinations the product supports.
Review results by language and prediction category. An acceptable combined result can conceal a weak result for a smaller language group. Keep incorrect predictions and their expected outcomes available for review, and decide whether the issue concerns scope, training data, or the business labels used to judge the prediction.
Choose acceptance criteria before reviewing the final evaluation results. Assign reviewers who can judge both the meaning of the record and the expected business outcome. Record unresolved disagreements so that a labeling dispute is not mistaken for a language capability problem.
The Predictive Intelligence testing and acceptance checklist can help organize that review. After rollout, connect the accepted scope to Task Intelligence categorization monitoring, keeping language-specific findings visible when investigating changes in results.
Questions to settle before expanding language scope
How should a team evaluate records containing two languages?
Include mixed-language examples in a separate evaluation group and have reviewers agree on their expected outcomes. Do not infer mixed-language behavior from two individually supported language entries. The language coverage list does not describe how a model handles text that switches languages within one record.
Can translated evaluation records replace original submissions?
Prefer original submissions when assessing the workflow people will use. Translation can alter wording, ambiguity, and local terminology, making the evaluation less representative. If translated records are included, label them so reviewers can distinguish those results from results based on naturally submitted text.
Who should sign off on adding a language?
Assign business acceptance to someone who understands the language and the target outcome, with technical review from the team responsible for the model. This is a suggested review arrangement. Language coverage does not specify a product role or grant permission to perform configuration actions.
What should happen when a requested language is absent from the list?
Keep that request outside the approved prediction scope and document the business need. Do not substitute a neighboring language entry as evidence of support. Evaluate an operating approach for the affected work before changing the rollout commitment.
When should a language decision be revisited?
Schedule another review when the intended prediction changes, the training data changes, or a new business team introduces different record text. Preserve the previous acceptance record so reviewers can see what changed and which assumptions need new evidence.