To configure class recall for a classification solution, open a saved Predictive Intelligence solution definition, add the Add class recall value while training parameter, and enter ClassName:RecallValue in User inputs. Submit the setting before training. This lets training favor recall for a selected class, with possible reductions in precision and coverage.
Decide whether class recall fits the classification solution
Class recall is an optional advanced setting for a classification solution. It steers training toward identifying a particular class when missing records in that class carries a greater consequence than flagging some records unnecessarily. Start with that decision, rather than choosing a high percentage because it looks like a stronger model.
Consider a security classification that distinguishes Phish from other incoming messages. A false negative leaves a phishing message outside the target class. A false positive places a legitimate message into that class. If missed phishing messages are the greater concern, favoring recall can express that priority during training. The tradeoff needs an owner who understands what happens after a record is classified.
High recall can reduce precision and coverage. Treat the parameter as a request that influences training, rather than a guarantee about the trained model. A configured percentage is not evidence that the model has achieved that percentage. Keep the requested setting and the subsequent evaluation separate in your decision record.
Before making the change, write down the target class, the consequence of missing it, and the tolerance for additional incorrect classifications. This is a recommended planning check, not an extra field on the form. For broader context on the model being adjusted, see Predictive Intelligence classification models.
Prepare the saved solution definition and access
Configuring this class recall parameter requires the admin or ml_admin role. Start with a classification solution definition that has already been saved. You can use an existing definition or create and save one before adding the parameter. An unsaved definition is not the starting point for this procedure.
The setting belongs before the training that should incorporate it. Plan the sequence as definition, parameter, verification, and then training. Saving the advanced setting and training the solution are distinct actions; the parameter record alone does not complete the work. The guide to machine learning solution definitions provides context for the record you are opening.
Use one target class per solution definition. In the newer release behavior described here, a recall value can be applied to one class within that definition. Do not turn the input into a list of class names or assume that a second class can share the same parameter entry. Decide which class deserves the preference before proceeding.
Check the form layout and sequence on your instance and release. Earlier versions use an intermediate Submit step when selecting the parameter; the newer sequence below opens the advanced setting for input directly. Keep that interface difference separate from the underlying requirement to configure the parameter before training.
Add the class recall parameter and enter its value
- Navigate through All > Predictive Intelligence > Classification > Solution Definitions.
- Open the saved classification solution definition you intend to train. Confirm that it is the definition associated with your chosen classification task.
- Find the Advanced Solution Settings tab in the Related Links section of the form and select New.
- In Solution Parameters, select the search icon. On the ML Solution Parameters screen, choose Add class recall value while training.
- In the Advanced Solution Setting record, enter the target class and requested recall percentage into User inputs using ClassName:RecallValue.
- Select Submit to save the parameter, then return to the classification solution definition to check the resulting entry.
The advanced setting record uses the ml_advanced_solution_settings table. Its User inputs field holds both parts of the request: the class being favored and the percentage being requested. Keep the colon between them. A number without a class name does not express which class the request concerns.
For example, Phish:95 names Phish as the selected class and requests 95 percent recall during training. The value is an example of the input format, not a recommended target for another team’s classification problem. Choose a value because it reflects your own handling requirements and evaluation plan.
Check the class name against the intended classification outcome before submission. Do not substitute a convenient description of the business problem for the class name. The parameter needs a specific class; a note such as “catch risky tickets” does not identify the class and percentage in the required format.
Verify the saved setting before starting training
After submission, the parameter should appear on the solution definition’s Advanced Solution Settings tab. Use that visible entry as the first configuration check. Its presence confirms where the setting was attached, while inspecting its values confirms what was requested. Both matter when several solution definitions are being prepared.
Review the selected solution parameter and the contents of User inputs together. Check that you chose Add class recall value while training, entered the intended class, and supplied the intended percentage after the colon. A correctly formatted request attached to the wrong definition still fails the purpose of the change.
If the entry is missing, pause before training. First confirm that you returned to the same saved definition and completed Submit. If the entry exists but its request is wrong, resolve the configuration discrepancy before continuing. These are recommended verification steps; the visible presence of a parameter is not a substitute for reviewing its meaning.
Record the definition, selected class, requested value, and reason for the choice in your change notes. This gives the evaluation reviewer a clear statement of intent. It also prevents a later discussion from confusing the requested recall value with a measured training result. For the surrounding setup workflow, see Predictive Intelligence solution configuration.
Before handing the definition to the person running training, ask them to confirm the saved entry against the change notes. This second review is especially helpful when similar definitions exist. It checks the intended configuration without assuming that a familiar solution name identifies the right record.
Train the solution and assess the tradeoff
Train the saved classification solution after configuring the parameter so that training incorporates the change. Keep that ordering explicit in the work plan. A team that stops after creating the advanced setting has saved the preference but has not completed the training step that uses it.
During evaluation, compare the result with the reason you selected the class. Review missed target-class records alongside records incorrectly assigned to it. Also consider precision and coverage, because improvements in the recall priority may come with reductions elsewhere. Decide whether that balance supports the operational process receiving the classifications.
As a review practice, include examples that people can inspect rather than relying on the requested percentage in isolation. A security reviewer and a service routing owner may accept different consequences from an extra flagged record. Make that acceptance decision visible before treating the solution as ready for its intended use.
For ticket routing scenarios, connect this review to the receiving team’s handling process. The guide to routing tickets with a small classification model covers the neighboring routing question. Keep this page’s configuration decision focused on the selected class and the training preference it needs.
For help planning this work, see ServiceNow implementation.
Questions to settle with the classification owner
Who should approve the balance between missed records and extra reviews?
As a governance recommendation, involve the owner of the process that receives the classification and the person responsible for evaluating the model. The administrator can enter the setting, but the receiving process owner should judge whether additional review work is acceptable for the risk being addressed.
What should a handoff note tell the next administrator?
Include the business reason, the definition being prepared, the selected class, and the intended evaluation decision. Explain who will review the outcome. A handoff that contains a percentage without its rationale leaves the next administrator unable to tell whether the preference still matches the classification task.
How should a team choose between two competing class priorities?
Resolve the business priority before configuring the setting. Compare the consequences of missing each class and identify which preference this definition should express. If the owners cannot agree, capture that unresolved decision instead of treating the parameter field as a place to negotiate competing requirements.
What makes an evaluation discussion actionable?
Bring the requested preference, observed classification examples, and the receiving team’s acceptance criteria together. Ask whether the resulting handling burden is justified by the records captured. Assign a person to the next decision so the discussion ends with an agreed action rather than an unexplained metric.