OBLYTECH Logo
OBLYTECH Logo

View Predictive Intelligence Solution Training Progress

To view Predictive Intelligence solution training progress, open the classification or similarity solution, then select Show training progress under Related Links. The Training Progress window follows the work from fetching training records through uploading the trained solution. Viewing this progress requires the admin or ml_admin role.

Open the progress window for the right solution

Start with the solution you intend to inspect. A progress check is meaningful when the person watching it knows which solution the training belongs to and what question the check should answer. For example, you might need to determine whether training is still underway before arranging a review of the resulting model.

  1. Use an account with the admin or ml_admin role for this viewing procedure.
  2. For a classification solution, navigate to All > Predictive Intelligence > Classification > Solutions.
  3. For a similarity solution, navigate to All > Predictive Intelligence > Similarity > Solutions.
  4. In the ML Solutions list, open the solution you want to inspect. Incident Categorization is an example of a solution whose training history you can examine.
  5. Find Related Links and select Show training progress. The Training Progress pop-up window opens.

Check the solution identity before interpreting what the window shows. If you are monitoring several solutions, put the solution name in your working notes before recording an observation. That small step helps prevent a completed run for one solution from being reported as completion for another.

Check the navigation and presentation on your instance and release. Keep configuration questions separate from the act of viewing progress: changing the training setup is a different decision. For the setup work that precedes monitoring, use the guide to Predictive Intelligence solution configuration.

Read solution training progress in Predictive Intelligence

Training covers four kinds of work: fetching files, preparing data, training the solution, and uploading the trained solution. Treat them as parts of one workflow. Reaching the training stage does not mean that the final upload has happened, and activity before training does not mean that the training service is already building the model.

Fetching files for training

The system retrieves the training records and passes them to the nearest training service. This is the movement of the training material into the service that will work on it. When describing an observation at this point, say that the records are being fetched rather than saying that the model has finished learning from them.

For an operational handoff, record that fetching is the stage under observation. Avoid treating the presence of training records in the instance as evidence that this transfer has finished. Your observation should describe the progress window, while the underlying configuration belongs in the solution’s setup record.

Preparing the data

During preparation, duplicate records are removed from the training set. This explains why collecting records and preparing them are separate activities. A team reviewing a run should distinguish the material selected for training from the preparation work performed on that material.

Do not describe this stage as a general correction of data quality. The specific behavior here is duplicate removal. If the team has concerns about field selection or the intended training population, record those as configuration questions for later review rather than assuming this step resolves them.

Training the solution

The training service builds the solution during this part of the workflow. Interpret this stage in the context of the earlier fetching and preparation work. A status report that merely says “training has started” can leave colleagues unsure whether it refers to the whole workflow or to this particular stage.

Use precise wording in your notes, such as “the solution is at the training stage.” Keep the solution name beside that observation. For background on the object you are monitoring, see machine learning solution definitions.

Uploading the trained solution

After training, the training service uploads the solution as attachment records. Include this step in your understanding of completion. Finishing model training and transferring the resulting solution back are different pieces of work, so a report about readiness should account for the upload rather than stopping at the training stage.

Set expectations about training duration

The number of records and the number of classes in the training set affect training time. Increasing either can make training take longer. This is why an elapsed duration from one run is a poor deadline for a different run when its training population or classes have changed.

When estimating a future cycle, begin with observations from comparable work. Record the solution, the training population being discussed, and the duration you observed. Mark the duration as an observation rather than a guaranteed completion time. If the team changes the training setup, explain that the earlier timing may no longer be a suitable comparison.

Avoid giving a fixed waiting period solely because someone needs a meeting time. Instead, arrange the review around a progress check and allow the person responsible for monitoring to report what has actually happened. This keeps the operational plan connected to the current run.

For example, if a previous run used fewer records, do not promise that a larger run will finish in the same interval. The same reasoning applies when the class count changes. Identify the difference before using historical timing to plan another cycle.

Put ownership of these checks into the Predictive Intelligence adoption and training plan. Name who will inspect progress and who will review the trained result, so completion has a clear next action.

Make a progress observation actionable

A monitoring note should help another administrator understand what was seen without reconstructing the whole training session. Use a short, consistent format in your team’s working record. These are suggested handoff details, rather than additional fields or controls in the Training Progress window.

  • The solution name and whether you opened the classification or similarity route.
  • The time you inspected the window, so readers can distinguish an earlier observation from the current state.
  • The stage you observed and the wording displayed for it.
  • The person responsible for the next check or review.

Keep observation and interpretation separate. “Uploading the trained solution” describes a stage. “Ready for operational use” is a broader decision that needs review of the result. Writing those as separate statements prevents a progress update from becoming an accidental approval.

If a colleague reports that training appears delayed, first make sure both of you are discussing the same solution and observation time. Then identify the stage shown. This creates a clearer starting point for investigation than a general statement that Predictive Intelligence is slow.

When the observation needs investigation, carry those details into the Predictive Intelligence troubleshooting guide. Keep any proposed corrective action separate from the progress record until the reason for the problem is understood.

For help planning this work, see ServiceNow implementation.

Review the result after the training workflow

Once the workflow has finished, move from watching progress to assessing the trained solution. For classification, the next review concerns classification solution statistics. For similarity, it concerns similarity examples and scores. Choose the review that fits the solution type you opened.

Make the handoff explicit: identify which solution was monitored, what completion observation prompted the handoff, and which review is next. This gives the reviewer a starting point without treating the monitoring note as a judgment about prediction quality.

Keep a separate place for review findings. A progress record answers where the training work has reached; the subsequent assessment answers what to do with the result. Keeping both records understandable helps when a later training cycle needs comparison with an earlier one.

Questions about coordinating training checks

What should a change ticket say about the next checkpoint?

State who will inspect the solution and what decision follows the observation. A checkpoint such as “inspect progress before assigning the result review” is clearer than a calendar entry that assumes training will have finished by then.

How should teams handle a monitoring shift change?

Pass on the latest observation with its time and solution name, then identify the next observer. Ask the receiving person to make a fresh observation before communicating a new update, so the handoff does not extend the apparent freshness of an older note.

Should an escalation include a screenshot?

A screenshot can help communicate what the observer saw, subject to your organization’s handling rules. Include written context as well: the solution identity, observation time, and question needing investigation. An image without context can be difficult to connect to the intended run.

What should a stakeholder receive during a long cycle?

Give a short update tied to the latest observation and state when another check is planned. Avoid replacing an uncertain completion time with an unsupported promise. The stakeholder needs a clear owner and next checkpoint to plan dependent work.