OBLYTECH Logo
OBLYTECH Logo

Auditing Service Portal User Experience With Usage Insights

A ServiceNow portal UX audit starts by checking what the portal records, then comparing page visits with meaningful actions such as catalog orders and record producer submissions. Use Usage Insights to find heavily used journeys, investigate apparent dropouts, and prioritize changes against task completion rather than traffic alone.

Set the scope of your ServiceNow portal UX audit

Choose one portal and a small set of tasks that matter to its audience. Requesting equipment, submitting a support request, and finding an answer need different definitions of success. Write down the entry point, intended destination, and evidence that would show completion before reviewing usage. Otherwise, a busy home page can distract attention from a broken request journey.

Keep an audit record with the portal identity, observation period, audience, task, event coverage, suspected friction, and proposed change. Separate an observed pattern from its explanation. A page with many visits and few submissions is an observation. Confusing instructions are a hypothesis until someone follows the journey and tests them.

Compare periods with similar operating conditions. Record announcements, catalog changes, and service disruptions that could affect demand. An onboarding campaign can increase equipment orders without any improvement in usability. Choose a baseline that lets the team distinguish a change in audience demand from a change in the experience.

Verify tracking before interpreting the numbers

For the portal tracking configuration action, the required role is portal_analytics_admin. Navigate to All > Service Portal > Portals, select the portal title, and inspect its analytics settings. The portal form uses Create Analytics Settings when settings have not been created and View Analytics Settings when the portal is already configured.

On the Usage Insights Settings form, Enable Unauthenticated User Tracking determines whether tracking includes unauthenticated users as well as authenticated users. Clearing it restricts tracking to authenticated users. Select Update after an authorized configuration change. Record the audience setting alongside the baseline so later comparisons use the same population.

In Australia, the analytics route is All > Platform Analytics > Usage Insights; Yokohama uses All > Platform Analytics > User Experience Analytics. Check the labels and actual tracking state on your instance and release rather than assuming a default. Also record changes to portal identity: changes such as a different sys_id can break continuity and produce a different dashboard.

For an audit, inspect the existing configuration before changing it. Ask the configuration owner to resolve missing coverage and the privacy owner to review consent notices before broadening collection. Keep a dated note of any tracking change; a larger recorded audience after that change is not evidence that the portal attracted more users.

Map page traffic to actions that matter

PortalPageLoad records visited pages and their languages. Use it to identify the pages receiving attention, then assign each page a purpose. A landing page routes people, a knowledge page presents an answer, and a catalog page supports a request. Their visit totals should lead to different audit questions.

Pair traffic with the event that fits the task. Usage Insights records these Service Portal actions:

  • Submit Catalog Request captures requests submitted through the SC Catalog Item widget, including the request ID and number of items.
  • Order Catalog Item captures an ordered item’s name and ID, together with its associated request ID, through the SC Catalog Item widget.
  • Submit Record Producer Request captures a submission through a record producer.
  • View Knowledge Article captures the viewed article’s name, ID, and language.

These distinctions prevent misleading totals. One request can involve multiple items, so counting orders and counting requests answer different questions. Viewing an article shows exposure to information; it does not establish that the reader solved the problem. Document the interpretation beside the measure before sharing a headline result.

Check whether custom components preserve the interactions you intend to measure. The named catalog events are associated with the SC Catalog Item widget; do not assume a replacement records identical behavior. The Service Portal widget explanation helps frame the component review when traffic reaches a page but its expected action is absent.

Investigate dropouts without inventing a funnel

Use the available records to form a sequence of questions: Did people reach the relevant page? Is the expected action captured? Can a representative user complete the task? Does the resulting request exist? Treat a gap between page visits and submissions as a lead for investigation, rather than proof that a particular form field caused abandonment.

Aggregate page loads and submission totals do not automatically identify the same people or attempts. A visitor may return repeatedly, read before deciding, or complete a task later. Do not label the difference an abandonment rate unless you have a defensible definition of an eligible attempt and a way to associate its outcome.

For a suspected request dropout, walk through the task with a representative user’s access. Check the page instructions, required information, attachment expectations, and the point at which submission becomes possible. Compare what the journey requires with what its entry page promises. Record the specific obstacle and the evidence needed to confirm it.

If discovery appears to be the obstacle, move the investigation into portal search analytics. If the task is difficult to operate with assistive technology or keyboard navigation, use the portal accessibility review. Those reviews investigate causes that traffic totals cannot establish.

Choose the first change by impact and confidence

Build a short backlog from the journeys reviewed. For each candidate, record the task affected, the observed usage pattern, the reproduced obstacle, the proposed correction, and the outcome to measure. Give earlier attention to a frequently needed task with a demonstrated blocker than to a cosmetic change supported by page popularity alone.

Consider severity separately from reach. An infrequent task can still deserve urgent attention when failure prevents someone from getting essential support. Also distinguish a portal design problem from a service process problem. Clear navigation cannot repair an approval requirement that users cannot satisfy.

Prefer changes that test a clear explanation. If users misunderstand a request’s eligibility, revise that explanation and observe the same task again. If a component fails during the walkthrough, resolve that failure before rearranging the home page. Bundling unrelated changes makes it harder to identify what improved the journey.

For help planning these changes, see ServiceNow implementation.

Assign a person to approve each change and another to confirm its result. Keep acceptance criteria concrete: the intended audience can reach the task, provide the required information, submit it, and recognize the outcome. A cleaner page is an intermediate result; the audit should close against the task it was meant to improve.

Check the result and retain an audit trail

After a change, repeat the walkthrough and compare the same event definitions over a comparable observation period. Preserve the original baseline, tracking scope, and portal identity in the audit record. If those changed, explain the break before comparing totals. Keep operational outcomes beside usage so the team can see whether requests reached their intended destination.

Write the conclusion with an appropriate level of confidence. A reproduced obstacle that disappears after a targeted correction supports a stronger conclusion than a small traffic fluctuation. Where demand or coverage changed, retain the finding as provisional. The next review should be able to follow the evidence without reconstructing the project from memory.

Questions about running a portal UX audit

How should we handle tasks with very little traffic?

Use a longer observation window when it represents the same service conditions, and supplement it with direct task walkthroughs. Avoid ranking a rarely performed task as healthy simply because few failures are recorded. Record uncertainty and assess the consequence of failure.

Should test activity be included in the review?

Keep a record of planned testing and its timing. Use that record when interpreting an apparent increase in activity. If you cannot distinguish test attempts from ordinary use, describe the limitation and choose a comparison period less affected by testing.

Who should review the findings before changes start?

Bring together the portal owner, the owner of the affected service, and someone who understands the user’s task. Include the analytics configuration owner where event coverage is uncertain. This keeps a design recommendation from overlooking service rules or measurement gaps.

What belongs in the handover to the next reviewer?

Provide the task definitions, observation periods, configuration notes, evidence behind each finding, and decisions on unresolved issues. Include the change owner and the next review trigger. Preserve rejected explanations too, so a later audit does not repeat an investigation already completed.