OBLYTECH Logo
OBLYTECH Logo

Create a credential store for password reset in Service Operations Workspace

To create a credential store for password reset in Service Operations Workspace, use the Admin Center configuration for Service Desk Assisted Password Reset with the admin role. Define the store type, password settings, and connection selection, submit the record, and run Test Connection before relying on it for password resets.

What the credential store record controls

The credential store record defines access to the server involved when someone changes or resets a password. It brings connection information and password behavior into the same configuration. Settings can cover password hints, reuse restrictions, and failed reset attempts, alongside the details needed to reach the store.

Start by identifying the password system the service desk needs to manage. A recognizable record name and description help distinguish that destination from another store used for a different population. As a planning step, write down the intended system, connection owner, and reset process before entering values.

The credential store Type supplies the capabilities the record inherits. Choosing a type is therefore a functional decision: a clear name cannot compensate for a type that does not fit the target system. For wider access planning around employee support, use the Service Portal security and access design guide.

Create a credential store for password reset in Service Operations Workspace

The role required for this workspace configuration procedure is admin. Use an account with that role for the following steps. The navigation and labels described here apply to the Brazil procedure; check them against your instance and release before starting.

  1. Navigate to All > Service Operations Workspace > Overview.
  2. On the Admin Center page, locate the Service Desk Assisted Password Reset configuration. In the Overview tab, select Configure in the Service Desk Assisted Password Reset card. Alternatively, select that card in the Configurations tab.
  3. On the Credential stores card, select Configure. The default credential store appears.
  4. Complete the credential store fields, including the type and the password settings needed for the intended reset process.
  5. Select Submit, then select Test Connection.

Keep the destination in view while completing the form. Reaching the default store is the entry point to configuration, rather than evidence that its current settings fit your intended system. Review the displayed values before submitting them, especially when another administrator has already prepared part of the setup.

A short configuration worksheet can make review easier. Record the expected destination, chosen type, password policy decision, and connection selection. Compare the saved record with that worksheet so that a successful save does not conceal an unintended choice.

Set identity, type, and password behavior deliberately

Use Name to identify the credential store for service desk assisted password reset. Use Description for the detail another administrator would need to recognize its purpose. Prefer descriptions that explain the destination and intended use instead of repeating the name.

Type determines which credential store capabilities the record receives. Review that choice before tuning password options. If the target is Microsoft Entra ID, account for its integration requirements as part of the connection design rather than treating the generic store form as the entire integration.

Auto generate password identifies the script include used to produce a temporary password during reset. When Enforce history policy is selected, the value in Auto generate password must comply with the password policy. As a review practice, assess the generator and policy together rather than approving each in isolation.

Enable password strength exposes the strength rule script text box for changes and displays a graphical password strength bar while the user changes or resets a password. The visual indicator belongs to the user experience; review the underlying rule script when deciding what that indicator should represent.

The form also includes Enable password policy and Password policy, with the latter identifying the default password policy. Agree on the intended policy before configuring these fields. Avoid introducing an extra rule simply because its setting is available; connect the choice to the organization’s approved password requirements.

Three more fields shape the reset itself. Hostname takes the URL or IP address of the credential store, so it must point at the system that actually holds the passwords. User account lookup names the script include that maps a ServiceNow platform user to that person’s ID in the credential store. The default script, PwdDefaultUserAccountLookup, returns the platform user name, which works only when both systems use the same names. Password rule hint sets the text shown on the reset page to guide the user toward a compliant password. The password rule script is what enforces the requirements, so the hint and the script should describe the same rules. The Password Reset Windows Application accepts newline characters in the hint but no bold, underline or hyperlinks, so keep the hint as plain text.

Configure password history without a misleading default

Password history needs both the checkbox and its parameter. Selecting Enforce history policy expresses the intent to restrict reuse, while the parameter supplies the number of earlier passwords that the restriction covers.

Confirm the store type before following these steps. The Enforce history policy checkbox appears only when the type is an AD Credential Store or a Local ServiceNow Instance. For any other type the checkbox is not shown, so choose the correct type first. The Password Reset Windows Application supports only AD credential stores, so the type also decides which application route is available.

  1. Select Enforce history policy on the credential store.
  2. In the Password Reset Credential Store Parameters related list, create a parameter named password_history_limit.
  3. Set its value to the required number of previous passwords that cannot be reused, up to the supported maximum of 10.
  4. Review the temporary password generator against the selected policy before completing the setup.

The default parameter value is 0, which permits reuse of previous passwords. For example, a requirement to prevent reuse of the previous five passwords calls for a value of 5. A selected checkbox with a zero value does not express that five-password requirement.

Test a new password and a password inside the history window as two separate checks, and write the expected result for each before testing.

Review Child Alias and Microsoft Entra ID dependencies

Child Alias supports multiple connections for a password reset credential store after a connection and credential alias have been created. Child aliases are associated with the base alias. This setting deserves attention where the intended reset route depends on a particular connection.

During a password reset request, the flow checks for child alias connections at the process level. With a child alias configured at the credential store level, the flow uses those alias connections to continue the request. Review the process and store configuration together when tracing which connection a request should use.

For Microsoft Entra ID, activating the Microsoft Entra ID Integration for Password Reset store app enables Password Reset to manage passwords for a Microsoft Entra ID application. That management references a Microsoft Entra ID user with the appropriate roles and password change privileges. That management references a Microsoft Entra ID user, so that user must hold the roles and password change privileges the reset needs.

For help planning this work, see ServiceNow implementation.

Validate the connection and preserve process dependencies

After configuring a new store, run Test Connection. Treat this as a required configuration check. For acceptance planning, also exercise an approved reset scenario so that the team evaluates the intended password behavior alongside the connection result.

Keep the observations separate: which store was tested, which destination was intended, and what happened during the reset scenario. A compact checklist helps prevent a connection check from becoming the entire acceptance decision.

If the scenario fails, compare the selected type, alias configuration, and password settings with the expected route before changing unrelated settings. Capture the point of failure and the values reviewed.

Removing a store requires a dependency review. Check all Password Reset processes first; update a process that uses the store before deleting it. The deletion action requires password_reset_admin or password_reset_credential_manager. Navigate to All > Password Reset > Credential Stores, select the store’s checkbox, and choose Delete in the Actions choice list.

Include password hints and the allowed number of failed reset attempts in the configuration review where those settings are part of the intended setup. Record the expected behavior rather than assuming that the connection result covers it. Prepare the hint wording and the failed-attempt scenario before testing, so the rehearsal changes one setting at a time.

Record the store name, intended destination, owner, policy decision and acceptance observations, but never passwords, so the next administrator can see why the configuration was set up as it was.