OBLYTECH Logo
OBLYTECH Logo

Attach files to a legal matter artifact

To attach a file to a legal matter artifact in ServiceNow, open the matter from the Legal Counsel Center, open the artifact from the Artifacts tab, and add the document through the attachments pane or the Documents tab. Which one appears depends on whether external storage is enabled on your instance. You need the sn_lg_matter.matter_fulfiller or sn_lg_ops.legal_user role.

Check your role and how you are connected to the matter

The steps assume you hold one of two roles: sn_lg_matter.matter_fulfiller or sn_lg_ops.legal_user. If neither role is on your user record, the matter lists and artifact forms described below may not be available to you. Confirm the role first so you do not spend time searching menus that are not available to your account.

Your connection to the matter also shapes what you can do. You may be the assignee, or you may have been added as a collaborator. A collaborator can access and work on the legal matter in the same way the matter owner can. The exceptions are three fields a collaborator cannot modify: Matter owner, Assignment group, and Assignment group permission. Attaching a file to an artifact does not involve any of those fields, so a collaborator with the right role can add documents without asking for the matter to be reassigned.

How new matters are created and built from templates is covered on the legal matter management page for matters and templates, which is worth reading if you are setting up the matter itself.

Open the artifact from the Legal Counsel Center

The Legal Counsel Center is where these steps start. The navigation path is the same whether you are an assignee or a collaborator:

  1. Navigate to All, then Legal Request, then Legal Counsel Center.
  2. On the Legal Counsel Center tab, select the list icon.
  3. On the Lists tab, open a legal matter by selecting an option under Matters.

The option you pick under Matters depends on your connection. Select Assigned to Me if you are the assignee. Select Collaborations if you were added as a collaborator. Then select the legal matter you want from the list that appears.

If the matter is newly assigned to you, select Start before doing anything else on it. Selecting Start changes the state of the legal matter to Work in Progress, so the matter reflects that the work has begun.

Once the matter is open, select the Artifacts tab and open the artifact that should hold the file. Pick the artifact that matches the piece of work the file supports, not a general artifact on the matter. A file attached to an artifact is stored against that artifact, so choose the artifact before you upload anything.

Attach a file with the Counsel Assist attachments pane

When external storage is not enabled, the attachment icon appears in the Counsel Assist sidebar. Select that icon to open the Attachments pane, where you can add, rename, and remove attachments on the artifact.

The upload control depends on whether the artifact already has attachments. If there are none, a Browse button is shown. Select Browse, then choose the file from your computer. After the first attachment, the Browse button is replaced by the add attachment icon, so use that icon for later uploads.

Name the file before you upload it, wherever you have a choice. The name is often the only description a reader sees before opening the file. A name that carries the document type, the counterparty or subject, and a version marker is more useful than a generic scan or export title.

Rename, download and remove an attachment

Each attachment in the pane has an actions icon. Selecting it gives you three options:

  • Rename: select Rename, then update the file name. Use this when the document is correct but its label is not.
  • Download: select Download to save a copy of the attached document to your own machine.
  • Remove: select Remove to take the attachment off the artifact. Use this for an upload that went to the wrong artifact or was added by mistake.

Renaming is the right correction when the content is right and only the label is wrong. Removing a file should be a deliberate step, particularly for a document a colleague has already read. When a newer version replaces a file, attach the new one first, label both clearly, and then decide whether the older copy should come off.

Attach a file through the Documents tab when external storage is enabled

When external storage is enabled, the Counsel Assist attachment icon is not used. The Documents tab in the Artifacts form takes its place. Here the list holds a link to each document, and that link appears in the External URL column of the documents list. The artifact therefore points to a document held outside it. When someone asks where the file is, the answer is a location, not an attachment they can open from the pane.

There are two ways to add a document on this path. The first is direct. In the Documents tab, select Attach, then select the file. The second opens a New Document form. On that form, select the Attach file link, select the file, and then select Save. The link to the saved document then appears in the list.

To remove a document on this path, open the Documents tab, select the document from the list, and select Delete.

Access to these documents is controlled in more than one way, so a document appearing on the artifact does not show who can open it. Check the document access rules for the matter before you ask a collaborator to work from a particular file.

If you are setting up this kind of work across an instance, see ServiceNow implementation.

Decide what belongs on the artifact

The harder decision is what should be attached at all. A workable pattern is to attach the source material that the team will need to check its own work, such as the original request, the draft under review, and any signed copy. Working notes are easier to use when they are written as text on the artifact than when they sit inside a file that someone must download before reading it.

Contract files raise their own questions about which version belongs on the artifact. If the contract came into the matter through intake, read the contract review intake page before you choose the version to attach.

Version handling needs an agreed rule before the first upload. Decide whether a superseded draft stays on the artifact with a version label or is removed once the new version is attached. Either can work, but the team should pick one and use it across matters.

Keep a short statement on the artifact of which file is final. A later reader should not have to open three attachments to find the signed version. A single line naming the final document, its label, and the date it was attached tends to cut down the confusion that builds up in long-running matters.

Confirm the attachment landed in the right place

Before you leave the artifact, confirm the file is where you expect it. On the attachments path, check that the file name appears in the Attachments pane. On the Documents path, check the External URL column for the entry you just created. An upload that lands on the wrong artifact is easy to miss when you are working quickly, and this check catches it before a reviewer does.

If a legal hold affects which documents must be kept, check the legal hold notification page before you remove anything from the artifact. Record hold decisions in your own notes, so a removed attachment is not mistaken for a hold decision.

Questions about attaching files to legal matter artifacts

Can a collaborator remove a file that the matter owner attached?

A collaborator has the same working access as the owner, apart from the three matter fields that cannot be changed. The Remove action sits in the same Attachments pane, so a collaborator who can open the pane can use it. If your team wants a stricter rule, agree on it in writing and record each removal in the artifact notes, since the access the collaborator has comes from the matter rather than from any step on the artifact.

Which storage path should a new team use for its first matter?

Which path appears depends on whether the external storage option is enabled. Confirm with your administrator which path is in use before the team starts uploading, so everyone uses the same method for the same kind of document. A team that starts on one path and later finds the other in use will have a harder time locating older files.

Can an attached file help with a later matter?

Yes. Artifacts can serve as reference material for similar requests that come in later. The file, its label, and the way you describe the artifact all affect whether a later team can use it. Clear labels and a short final-version note make the artifact useful well beyond the matter it was created for.

How long should a matter keep its attachments?

The attachment steps do not set a retention period. That decision belongs to your organization’s records policy. Ask the matter owner and the administrator to confirm the rule before the matter closes, and do not assume that removing an attachment from the artifact satisfies a retention requirement by itself.