To send legal contracts for electronic signature from Legal Service Delivery, an administrator first installs and sets up the Adobe Acrobat Sign or DocuSign spoke in Integration Hub. The provider is then configured under Legal Administration, Legal Integrations, Integrations, using the Electronic Signature link. Publishing the configuration makes it ready for signing contract documents.
What has to be in place before you configure the provider
Two prerequisites come before the configuration screen. The first is the Integration Hub spoke for each provider you plan to use. On this path the Adobe Acrobat Sign spoke must be version 2.5.1 or later, and the DocuSign spoke must be version 2.2.0 or later. If an existing spoke is older than these minimums, have the administrator upgrade it before you start rather than working around it. The Contracts Core version of the same configuration, which sits under a different navigation path, lists higher minimums: Adobe Acrobat Sign spoke 2.8.0 and DocuSign spoke 4.1.x. Check which path your instance uses before you read the version numbers.
For Adobe Acrobat Sign, the Adobe Acrobat Sign group has to be synchronized with ServiceNow before you can select it on the form. For DocuSign, the account is created on the DocuSign side and connected through the DocuSign eSignature spoke, which uses the authorization code grant method. Gather the group name or the account number before you open the form, because the form asks for one of them, depending on the provider.
The second prerequisite is the role. Configuring an e-signature provider for legal contracts requires one of three roles: sn_lg_ops.request_config, sn_lg_contracts.contracts_config, or sn_lg_matter.matter_config. Holding any one of them is enough. Confirm your role assignments before the change window so the work is not held up partway through.
Once those are in place, settle the design with the person who manages the provider accounts. Decide which contracts go to which provider, and decide who owns the configuration afterward. In practice, the costly case is designing routing while contracts are already waiting, because the change then lands in a live queue. For help planning this work, see ServiceNow implementation. If the request that starts a contract is still open in your process, the legal request management intake and work closure page describes that side of the flow.
Where to find the Integrations list
Go to All, then Legal Administration, then Legal Integrations, then Integrations. The list holds the external app configurations. Each configuration is a separate record with its own settings, so two providers, or two contract categories, can each have a record of their own. Open an existing record from the list to change it, or create a new one.
Setting up the e-signature provider step by step
- Open the Integrations list and click New to create a configuration. To change an existing one, open it from the list.
- On the Integration Type page, click the Electronic Signature link.
- Fill in the Electronic Signature form. The field-by-field notes follow in the next section.
- Save the record. For a new configuration, click Submit. For an existing configuration, click Update. At this point the external app configuration is saved.
- Click Publish.
After publishing, the configuration is ready to be used for electronic signing of contract documents. Publishing is the final step, and the configuration is described as ready for signing only once it is published. Keep that in mind when you edit a configuration that other people depend on.
Electronic Signature form fields and what to enter in each
The form contains ten fields. Account and Group change depending on the provider you select, and that is a common source of confusion, so read their notes closely before you save.
- Name and Description: free text. Name the record after the provider and the contract category it covers, so the list stays readable when several configurations exist.
- Active: marks the configuration as active. Set it deliberately as part of your publishing check rather than leaving it at a value you have not reviewed.
- Table: select General Contract Support [sn_lg_ops_general_contract_support], the table where the contracts data is stored.
- Condition: filter conditions that decide which integration account handles a contract. The routing section below works through an example.
- Execution order: the order in which an integration account is used for electronic signature of contract documents. The account with the lower value is chosen first.
- App: the electronic signature provider, such as Adobe Acrobat Sign or DocuSign.
- Account: the account number tied to the provider. This field appears when DocuSign is selected in the App field.
- Group: the group tied to the provider. This field appears when Adobe Acrobat Sign is selected in the App field.
- Attributes: additional settings for the provider. Enter the Host Url, which is the Web UI URL for Adobe Acrobat Sign or the DocuSign UI for DocuSign. That address is where a contract document can be finalized or updated before it goes to signatories.
Routing contracts with conditions and execution order
A single provider configuration covers the simplest case. Some teams need more routing than that, such as keeping one contract category on a different account. A typical example is a DocuSign account set up for NDA contracts alone. To build that routing, set the condition to Category is NDA, select DocuSign in the App field, and choose the matching account in the Account field.
Execution order matters when more than one configuration could apply to the same contract. The lower value is chosen first, so give narrow configurations lower numbers and a broad fallback a higher number. Do not rely on the numbers alone; the testing section below explains how to check them.
Category values in the condition have to match the categories your intake records hold. Compare them with the options on the legal contract review intake side before you publish, so the condition is checked against real values rather than assumed to work.
Testing the configuration before contracts depend on it
Publishing confirms that the configuration is saved and ready. It does not show that routing works as you intended. Send a test contract through each condition you defined, and confirm which provider received it and which account it used. Repeat the check after any change to a condition, an account or an execution order.
Keep a short written record for each configuration. Note its name, its provider, its condition, its execution order and the account it uses. When a contract later reaches the wrong provider, that record is what you compare against, and it saves time for whoever inherits the configuration. If your team also works with matters, the legal matter management, matters and templates page covers that layer, so check how the two connect when you test.
If your organization runs a separate test instance, rehearse configuration changes there first and then repeat them in production. Check the menu path and field labels on the instance you are working in. Navigation for contract applications can differ between ServiceNow applications, so the path in these steps may not match your screen exactly.
Changing or replacing an existing configuration
Open the configuration from the Integrations list and make the change on the same form. Click Update to save, then click Publish. Review condition and execution order changes before you save them, because either one can move contracts to a different account.
If a provider account changes, for example when a DocuSign account is replaced, update the Account field on the existing record instead of creating a second configuration that overlaps the first. Overlapping records make the execution order harder to reason about, and the lower value still wins when two records match.
Common mistakes when setting up the provider
- Filling in the field that belongs to the other provider. Account is for DocuSign and Group is for Adobe Acrobat Sign, and the form shows the one that matches the provider selected in App.
- Forgetting to publish after clicking Submit or Update. A saved record is not yet ready for signing; that state comes after publishing.
- Giving two configurations the same condition, so that execution order alone decides the routing.
- Entering a Host Url that points to a different provider’s interface from the one selected in App.
Questions about e-signature provider setup in Legal Service Delivery
Can one instance route contracts to both Adobe Acrobat Sign and DocuSign?
The form lets you create configurations for different providers, and the condition and execution order decide which account handles a given contract. Confirm the routing for each category with a test contract on your own instance before you rely on it.
Who should own the configuration after it is published?
Assign ownership to the person who manages the provider account and can answer for the account number or group. That person also needs one of the configuration roles, so ownership and access should be decided together.
Should NDAs and other contract types use separate configurations?
Separate configurations make routing easier to explain when categories follow different accounts. If all categories use the same account, a single configuration is simpler to maintain. Test whichever design you choose with a contract from each category.
What should I do when my instance differs from these steps?
Treat these steps as a starting point, and check each menu path, field label and role against your own instance. Names and navigation can differ between releases and applications, so write down what you find on your instance, not just the steps you followed.