Dynamic Translation is a ServiceNow plugin that machine translates text people type into forms, activity streams, chats and knowledge articles. You connect it to a third-party provider, mark defaults for translation and detection, and choose where translation applies. A separate Exclusion Framework keeps product names, acronyms and identifiers out of machine translation.
What Dynamic Translation covers
Once a field is enabled with the Dynamic Translation Enabled dictionary attribute, a translate icon appears next to it for users who click it, and the reader can switch between the original text and a version in their own language. Activity streams offer the same control on each comment or work note. Agent Chat uses the feature to translate messages between an agent and a requester who speak different languages.
The plugin does not translate the interface itself. Interface strings belong to System Localization, and multilingual knowledge content runs through the Localization Framework. Keeping these apart in your plan prevents a common surprise: machine translation does not fix a menu that is still in the wrong language.
Prerequisites and plugin activation
Dynamic Translation requires a Professional or higher subscription that includes it. An admin activates the plugin once the Glide Notification Translation plugin is installed and enabled. Activation also brings in supporting components, including the IntegrationHub runtime and the Dynamic Translation spoke, which let the feature run as actions inside flows. The integration tooling guides cover that runtime in more depth.
Two details catch people out. Activating the Microsoft spoke while the main plugin is inactive makes its subflows usable, but not the Dynamic Translation APIs. On a domain-separated instance with delegated administration, the activating account must sit in the global domain, or the install stops because another plugin activation is running.
Connecting a translation provider
Translator services are listed in the Translator Configurations table. Microsoft and Google are partly preconfigured once the plugins are present. The Google Cloud Translator spoke must be installed from the ServiceNow Store. For each provider, create a credential for its alias, then a connection for that alias. Check the provider’s data privacy terms and cost model before you commit, and test in a non-production instance before going live.
Open the translator record, select Active, and on the Preferences tab select both Mark as default for translation and Mark as default for detection. These are separate jobs. Detection works out the language of incoming text, and translation handles the conversion requests. Language codes can also differ between ServiceNow and the provider; where they do, create a language code mapping record and attach it to the translator configuration.
The ServiceNow translator record that appears by default handles detection alone, and its translation checkbox cannot be selected. A custom provider means building the connection, flows and language mappings yourself. Generative AI capabilities use Dynamic Translation only after a default translator configuration is set and the Translate option is selected on the attribute in the OneExtend Capability Attributes record (sys_one_extend_capability).
Choosing where translation applies
On platform forms, you enable translation for a single field by setting its dictionary attribute. Activity streams are controlled by table lists instead. The allow-list property takes comma-separated tables where the option appears on comments and work notes, and the block-list property turns it off for the tables you name. Both start empty, so nothing in an activity stream is translated until you add a table.
Agent Chat needs groundwork first. It is off by default, and it requires a provider, a translator configuration migrated to the flow version its prerequisites require, a translated knowledge article, Agent Chat set up and the required languages active. Virtual Agent topics must exist in the target languages. Once running, the feature translates user and system messages, chat history, record card values, rich controls such as choice lists and carousels, and bot responses. Record card labels are not translated and depend on System Localization properties.
Each language must be installed on the instance, then turned on by setting Dynamic Translation Enabled to true on the Multi-language support page (Conversational Interfaces > Settings > Virtual Agent > Multi language support). Once active, a language appears in the Multi language support card in Virtual Agent Chat Settings. New languages are added as records in the Languages [sys_language] table with name, BCP 47 ID, text direction, active flag and fallback language. A fallback language covers UI strings that have no translation in the user’s language. Set it on the Languages record.
How the Exclusion Framework protects terms
Machine translation alters words that should stay exact, such as product names, acronyms, ticker symbols and internal terminology. Before text leaves the instance, the framework searches it for matches against active rules and wraps each match in exclusion tags. The provider passes tagged text through unchanged, so protected words appear in their original form inside translated sentences.
The tags come from the Exclusion Provider Pattern table, where each record holds a prefix and a suffix tag linked to a translator configuration. A Microsoft record is included by default. Other providers supply their tags separately.
The framework is active by default once Dynamic Translation is active. An upgrade to Xanadu Patch 3 or later switches it on and moves flows from version 3 to version 4. Default translator configurations upgrade to version 4 automatically; customized ones need a separate migration procedure. The property sn_dt.dynamic_framework.enable_exclusion_framework controls it. On a domain-separated instance it applies to all domains, and the property cannot be set per domain.
| Rule type | Typical entries | How it matches |
|---|---|---|
| Exact match | Product and company names, acronyms, ticker symbols, internal terms | The term as written, optionally ignoring letter case |
| Pattern match | Case numbers, incident numbers, knowledge article numbers, sys IDs | A regular expression describing the shape of the text |
Default rules can be deactivated but not edited. Rules you create can be edited or deactivated later.
Writing and testing exclusion rules
The Create New Rules record producer adds up to 50 rules of each type per submission. That limit applies to the form, not the table, so larger sets take several submissions. A rule must be unique within its domain, and a duplicate is refused with a message that the term and domain combination already exists.
Order matters. Rules run in sequence, and the first match stops evaluation, so a later rule cannot protect text an earlier one has already handled. Rules with an Order number run from lowest upward, and unnumbered rules follow, oldest first. The usual approach puts the narrowest identifiers at the lowest numbers, so a broad term cannot match first and block a precise pattern.
Exact match rules have an Ignore Case checkbox. When ticked, a rule for hello also catches Hello. When cleared, the casing must match the stored term.
Pattern rules use Java regular expressions, and Perl or other dialects are not supported, so copied patterns may need adjusting. The Add Row form checks basic validity but cannot confirm that a pattern matches what you intended. From the Zurich release, the Test Exclusion Rule action lets you try a pattern before you rely on it. Test pattern rules this way, because an overly wide expression can shield ordinary words from translation.
Translating knowledge content and using spoke actions
For knowledge articles, the current route is Localization Framework, which translates Knowledge Base articles in bulk into several languages. Machine translation inside it needs the Dynamic Translation plugin to be active. The governance side of multilingual knowledge is covered in a guide on knowledge localization, and the knowledge article concept page explains the record structure that translations inherit.
Genius Results add another layer. With Dynamic Translation active, AI Search can answer from non-English articles. The Now LLM Service translates content into English, generates the answer and translates it back into the search language. The query-time caches handle English content, so for a non-English search a cache mode of on or online bypasses the cache and queries the model, while offline returns no answer.
For automation, the Dynamic Translation spoke provides five Workflow Studio actions: Detect Language, Detect Languages, Translate Text, Translate Texts and Is Dynamic Translation Enabled. Filter the Actions tab by the Dynamic Translation application to find them.
Limits to plan around
Requests to the Google provider should stay near 5,000 characters, and input cannot exceed 30,000 code points. Microsoft caps input at 50,000 characters, including spaces, for translation and detection. Long comments or articles may need splitting.
Frequently asked questions
Does Dynamic Translation translate the whole interface?
No. Interface labels belong to System Localization.
Why is a product name coming out translated?
Usually the term is missing from the Exclusion Rules table, the rule is deactivated, or an earlier rule matched first. Check the rule list and its order numbers.
Can I use a provider other than Microsoft or Google?
Yes. Build a custom integration with credentials, a connection, flows and language mappings, set it as the default for translation and detection, and add its tags in the Exclusion Provider Pattern table.
Can I switch off the Exclusion Framework for one domain?
No. The property applies to all domains and cannot be set per domain.