Localization Workspace is the ServiceNow AI Platform application that sends instance content out for translation into several languages from one interface, through a translation management system or machine translation. Setup runs in sequence: install the application, complete the Localization Framework prerequisites, then define target languages and their providers. Glossaries are optional; add one when specific terms need fixed wording.
Install the application and check entitlements
The application ID is sn_lw. An admin installs it from All Available Applications under System Applications, selects a version, and reviews the installation details dialog, which lists dependencies that will install with it. Confirm valid entitlements for the application and its ServiceNow Store dependencies first, and read the store listing for licensing and release compatibility.
The install adds plugins, roles, scheduled jobs and tables. It also installs Localization Framework if that is not already active, because the workspace builds on Localization Framework’s functionality, including its tables and roles. Demo data is not included, so the configuration has to be entered from your own languages, users and content.
Finish the prerequisites before opening the workspace
From version 2.0.2 the workspace offers two Guided Setups. Run the Localization Framework Guided Setup first, then the Localization Workspace Guided Setup. Later changes go through the Configuration Hub, covered below. Several prerequisites still need a manual check:
- Settings table access. Access to the Localization Framework settings table (sn_lf_setting) is configured by default from the Zurich release. Yokohama required the admin to confirm it, so check it on any instance upgraded from an earlier release.
- Language plugins. Install them through System Localization and choose the instance languages that match your business needs.
- Project preferences. On the settings table (sn_lf_settings), Project Preferences tab, select Enable projects and clear Enable auto creation.
- A localization group. Create at least one group in the Groups table, give it the roles, and assign localization users to it.
- Artifacts. Configure artifact configurations, which define the content types a request can collect. Content Publishing items also need sn_cd.content_admin, a role separate from content_admin.
- Translation service. Configure a Translation Management System if you use one. For machine translation, configure Dynamic Translation and a translator configuration. Language providers in the workspace are separate from those translator configurations.
- Restricted Caller Access. Set it when target tables or scripts are restricted. This step needs the admin role.
Custom artifacts also need cross-scope privileges so the workspace can reach them. For instance-wide translation of interface strings, see the System Localization guide. Machine translation setup is covered in the Dynamic Translation guide.
Assign roles to the people who will use it
| Role | Who it is for | What it does in the workspace |
|---|---|---|
| localization_admin | Localization administrator | Creates and edits language providers; opens the provider guided tour |
| localization_requestor | Localization requester | Opens the language group guided tour; requests translations |
| localization_editor, localization_fulfiller, localization_manager | Localization team | Inherited from Localization Framework; their rights are set in that application |
| sn_lw.user | Anyone working in the workspace | Required for all users; views providers and creates language groups |
| sn_lw.terminology_manager | Glossary managers | Uploads, reviews and manages glossaries |
Two details catch people out. The sn_lw.terminology_manager role does not contain sn_lw.user, so assign both to anyone who manages glossaries. The terminology role was split out of sn_lw.user in version 3.1.0, and the import and content administration roles moved with it. Recheck role assignments after an upgrade. For wider upgrade planning, see upgrades and release readiness.
Set up target languages and providers
Language setup sits under All > Localization Workspace > Language setup and opens on the Language Provider tab. For each target language, configure one or more providers, each with its own pricing. Pricing set here feeds the informational cost estimate that requesters see.
Localization admins create and edit providers. Users with sn_lw.user can view them and build language groups from the existing list. Groups are optional, but they save selection time when a team repeats the same set of languages. Configure the individual providers first. A group needs at least two members. Select New, enter a name and optional description, choose a target language and provider on each row, add rows with the add icon, then select Submit.
Three behaviours matter when you build groups:
- A language can sit in more than one group. If it appears twice in one request, the workspace clears the preset provider, and the requester must choose one manually.
- Deleting a row removes one language. Deleting all rows removes the group.
- To edit, expand the group, open it from the name in any row, change the drop-downs, add or remove rows, and select Edit.
The group list exports to Excel, CSV, JSON or PDF, either as a download (the default) or as an email attachment.
Build glossaries in Language Asset Management
A glossary is a list of source terms, each with translations into one or more languages. An instance can hold several, split by business unit, function or locale. The Product/Service category filters or subdivides terms within a glossary.
The same source term can appear more than once when it sits in different Product/Service or Part of Speech categories. Each occurrence is a separate record with its own translations, which helps when one word needs different wording in a product interface and in marketing copy.
Translations can target any language in the sys_language table, including self-localised ones. An inactive language can hold translations but is not available in translation workflows, so activate it through the language plugins first. There is no upper limit on rows, but the general guideline is between 50 and 1,500 rows per glossary.
Upload a spreadsheet
Select Import Glossary in Language Asset Management, then download the template named ServiceNow_Glossary_template.xlsx. Fill in one row per source term:
- glossary_name, required on each row, because it labels the glossary.
- term, definition, product_service and part_of_speech (a drop-down).
- do_not_translate, set to TRUE when a term must stay as written.
- source_language (a drop-down), and one column per language headed by its BCP 47 code.
Clear unused language columns and remove placeholder text such as “Translation1”. Save the file in Excel .xlsx format only; CSV and Strict OpenXML files are not the required format. The file name does not matter. Brazilian Portuguese, French – Canada and Traditional Chinese are mapped by the import transform, so leave those header labels as the template has them.
To load the file, select Import Glossary again, keep the default Load Data settings (the glossary_import_set table and a file source), choose the file, and select Submit. When the progress window shows Success, select Run Transform, keep the default GlossaryTransformMap, and select Transform. The new glossary appears on the Glossaries tab. For background on import sets in general, see import sets explained.
Edit and export
Open a glossary, select the Glossary Sources tab, and open a term to change its definition, Product/Service, Part of Speech, source language or the Do Not Translate check box. The Glossary Translations tab shows the count and lets you edit, add with New, or delete a translation. Editing needs both sn_lw.user and sn_lw.terminology_manager from version 3.1.0.
From version 3.1.0 a glossary can also be exported as CSV or Excel. Select its check box, choose Export Glossary, pick the file type and select Export. Translations into self-localized languages are not included in an export, so keep a separate copy of them.
Generate a draft from Knowledge articles
From version 4.0, the generate glossary skill can draft a glossary from English Knowledge articles. Activate the skill first, because the Create glossary button is hidden until then. Only Knowledge articles labeled as English are included in the search. For the basics of a Knowledge article, see Knowledge article explained.
The first stage searches. You name the glossary, set optional filters (an updated-date range, a limit to your own articles, and a minimum view count), and search. Tick the articles to scan, keeping within the default 25,000-word limit shown by the running total.
The second stage extracts candidate terms and definitions. Review the suggestions: edit a term, definition or part of speech, reject rows, or approve rows. Publish includes approved rows.
Know the scope limits before the first request
The initial release takes English source text into non-English target languages. Requests from non-English text are not supported. Domain separation is not supported. For what that feature covers, see domain separation explained.
If a content type is missing from a request, check its artifact configuration, its cross-scope privileges and its Restricted Caller Access settings first.
Use the Configuration Hub for later changes
Admins open the Configuration Hub from All > Localization Workspace > Configuration Hub, or from the hub icon inside the workspace. It gives central access to the tables and properties of the dependent applications. For Localization Framework it exposes artifact configurations, settings, TMS configurations, spoke configurations and settings, and language code mappings, which matter when a third-party service uses its own codes. Dynamic Translation components (translator configurations, exclusion rules and their tools) are visible to the admin role alone. Changes save to the tables of the application they belong to.
Frequently asked questions
Can I configure the workspace without Localization Framework?
No. Installing the workspace brings in Localization Framework if it is not active, and its configuration must be completed before the workspace is configured.
Why can a requester not see Content Publishing items?
Those items need sn_cd.content_admin. That is a separate role from content_admin, so granting one does not grant the other.
Do I need glossaries before requesting translations?
No. Glossaries and language groups are both optional. A glossary helps when specific terms need consistent wording, and a group saves selection time.
Can one glossary term have different translations in different contexts?
Yes. Place the term in separate Product/Service or Part of Speech categories and give each occurrence its own translations.