OBLYTECH Logo
OBLYTECH Logo

Generate audit reports with a Microsoft Word template

To generate an audit report in Microsoft Word, configure a Word report template, associate it with an audit engagement, and generate the document in Audit Workspace. The engagement must be scoped and in an eligible state. The resulting Word file can be downloaded or opened through configured cloud storage for auditor review.

Prepare the engagement and report configuration

An audit report Microsoft Word workflow connects three pieces: the engagement data, a reusable template, and the document reviewers receive. Decide which engagement information belongs in the report before building its layout. A polished document with missing findings or an unclear engagement name still creates review work.

Set up ServiceNow Document Designer for Word before creating templates or generating reports. The administrative preparation includes content configurations, Word Report Templates, and Word Template Categories under All > Audit > Audit Report. Content configuration determines what information template authors can insert. Template design then determines where that information appears.

These steps match the Brazil release of the ServiceNow platform. Confirm them on your own instance before you build the template. For generation, use an engagement that has been scoped and is in Validate, Fieldwork, or Follow Up. Check the actual state before diagnosing a missing generation control. A report layout cannot compensate for an engagement that has not reached an eligible point.

Keep the reporting requirement separate from the evidence collection plan. Decide which conclusions need supporting records and which details reviewers should see in the generated document. For related planning, see GRC policy and audit evidence.

Assign access for each reporting action

Creating a Word template record is an audit administration action. Its role list includes sn_audit.admin, sn_irm_shared_cmn.word_template_creator, and sn_irm_shared_cmn.word_template_reader. The creator role provides create, read, update, and delete access to Word template and Word template category records. The reader role provides read access to those records; it does not provide the creator’s editing access.

Designing the audit template in Microsoft Word requires sn_audit.manager and sn_grc_doc_design.reader. Use audit manager credentials when signing in through the add-in. Check this separately from the access used to maintain the template record, because the record and the document design are different parts of the workflow.

The generation procedure lists sn_audit.manager, sn_audit_ws.supervisor, and sn_irm_shared_cmn.word_template_reader. Its prerequisites specifically require the audit manager and Word template reader roles plus access to Audit Workspace. Validate those prerequisites for the person generating the report. Do not assume that someone who can view an engagement can also generate its Word report.

Build the audit report layout in Microsoft Word

Install and activate ServiceNow Document Designer with Word, identified by sn_grc_doc_design, and have the template configurations ready. If the layout will include reporting content, set up Microsoft 365 reporting as well. Start with a document whose headings and explanatory text make the intended review sequence clear.

  1. Open the Microsoft Word document and select Design template on the ribbon.
  2. Select Log in, authenticate with audit manager credentials, and select Allow.
  3. In the ServiceNow Document Designer pane, set Business domain to Audit.
  4. Select the required Template configuration and select Confirm.
  5. Use the Data tab and Data element field to choose configured fields, placing them at the intended positions in the document.
  6. Use the Table tab and Table element field to insert configured table elements.

The field choices come from configuration. If a required engagement field is missing from the selection, review that configuration before redesigning the document around manually typed values. Manual text may look correct in a sample while remaining unrelated to the engagement used for the next report.

Use a content block when repeated content needs consistent styling. Select Block, add the content in the document, choose its Content block source, and select Add content block. The block then exposes Data and Table options. Select Add after choosing the data or table; Edit columns lets you reorder a selected table’s columns.

Keep the design within the stated safeguards: avoid nested content blocks, more than ten images, more than one table within a content block, or more than two content blocks. Save the template after design work. For the broader distinction between a reusable layout and a completed document, see document templates explained.

Register the template and select the Word report route

Navigate to All > Audit > Audit report > Word Report Templates. Select New, complete the template record’s fields, and select Submit. Treat this record as the configuration that makes the template available to the engagement workflow, rather than assuming that saving a Word document finishes the setup.

Select Word report template in the engagement’s Template type field when creating the engagement. This choice determines the reporting route. Classic report template generates a Knowledge Base report from HTML, script, or XML input; Word report template generates a Word file. An existing knowledge reporting process therefore needs a deliberate template choice.

Before a trial generation, check the template’s availability. The Report template selection presents templates relevant to the engagement that are active and in Published state. A document that exists but has not reached that state may leave the generator without the expected choice.

Agree on an acceptance check before rolling the template into routine use: the right engagement identification, expected data fields, readable tables, and an appropriate destination. For help planning this work, see ServiceNow implementation.

Generate the report and open it for review

  1. Navigate to All > Audit > Audit Workspace and select the lists icon.
  2. Under Execution, select All engagements and open the required engagement.
  3. Select Generate report. In the pop-up, choose the audit report name in Report template.
  4. Enter a unique value in Name of report and select Generate.
  5. Wait for the generation message, then open the output through the route configured for the template.

If Cloud enabled was not selected on the template, use the attachment icon, then the actions icon and Download. Open the downloaded Word document to inspect its contents. If Cloud enabled was selected, use the Cloud files tab and the cloud folder link to open the document in the cloud location configured for the engagement, which is Microsoft SharePoint or Google Drive depending on your cloud upload configuration, then share it with collaborators.

A cloud-enabled template displays a destination message during generation. Missing cloud file configuration for the engagement produces an error. Resolve that configuration before treating the issue as a Word formatting problem. The output location is part of the report workflow, not a detail to discover after reviewers are waiting.

Check the Report field in the engagement form’s Report section for the most recent report as a link or attachment. Before circulating it, compare its engagement identification and substantive content with the intended record. Agree who will consolidate auditor comments so reviewers can distinguish proposed edits from accepted changes.

Check data refresh and report retention

Reporting content has its own insertion and refresh controls. Select Insert content on the ribbon, choose Data, Table, or Chart, set Business domain to Audit, and select the Reporting item. Choose from the configured fields and use Add at the intended insertion point. Inserted text and tables take the document’s formatting; charts can be adjusted after insertion.

To refresh reporting content, select Update content, choose the field, and select View and refresh links. The refresh selection is limited to fields added to the table. Review refreshed content before sharing a revision, especially when a report already has auditor comments. For a neighboring Word authoring workflow, see ServiceNow knowledge authoring in Microsoft Word.

Regeneration also affects attachments. By default, generating a new Word report removes the previous report attachment and keeps the latest one. An audit administrator can change the retention property through All > Audit > Administration > Properties to retain earlier attachments. Decide whether the engagement needs that history before generating successive review versions.

Common questions about generating Word audit reports

Why does the Generate report button not appear for an engagement?

The button appears only after the ServiceNow Document Designer for Word plugin is activated, and only for an engagement created with Word report template selected in the Template type field. The engagement also has to be in Validate, Fieldwork, or Follow Up.

Why does a new Word report replace the earlier attachment?

By default, only the latest Word report stays attached to the engagement, because generating a new one removes the previous report attachment. An audit administrator can set the retention property to true under All > Audit > Administration > Properties to keep earlier attachments as an audit trail.