To generate a control test from an engagement in ServiceNow, add an entity to the engagement, open its Test Plans related list, select the relevant plans, and choose Generate Control Tests. This action requires sn_audit.admin and sn_audit.manager. Review the resulting records in the Audit Task related list before assigning testing work.
Prepare the engagement for control test creation
Start with the engagement that owns the audit work. Automatic generation follows entity selection: after you add an entity to an engagement, the Test Plans related list lets you generate control tests. The test plans you select determine which control tests are generated.. Treat those as separate decisions.
Before generating records, compare the selected plans with the audit scope. As a working check, ask whether the team can identify the control being tested, the intended evidence, and the person expected to perform the assessment. In practice, these questions make it easier to tell a populated task list from a complete testing approach.
Field labels and availability can differ by release, so confirm them on your own instance before you start. For the automatic generation action, the required roles are sn_audit.admin and sn_audit.manager. The standard manual creation route lists the same roles. Workspace creation and the engagement control test grid list sn_audit.manager and sn_audit_ws.supervisor. Check the access needed for the particular action you intend to perform.
Keep engagement planning separate from the mechanics of creating tasks. The audit engagement lifecycle provides context for placing testing within the wider audit sequence.
Generate tests from the selected test plans
- Navigate to All > Audit > Engagements > All Engagements.
- Open the engagement whose entity has been added and whose control tests you want to generate.
- Open the Test Plans related list.
- Select the test plans that belong in this generation action.
- Select Generate Control Tests.
- Review the Audit Task related list, where the control tests for the selected plans are created.
Validate the outcome at the record level. Compare the test plans you selected with the resulting control tests, then inspect the associated Test plan and the assignment. A generated task does not by itself show that the team has agreed its testing instructions or schedule, so confirm both before assigning work.
If the expected records are absent, first establish whether an entity was added, whether plans were selected, and whether the generation action was completed. Check the destination related list before making another creation attempt. If records exist but their coverage is wrong, resolve the selection or scope question before adding further tests. Checking each step in order shows which transition failed.
For help planning this work, see ServiceNow implementation.
Create an individual control test from an engagement
Manual creation lets an audit manager enter a specific control test through the engagement. With sn_audit.admin and sn_audit.manager, navigate to All > Audit > Engagements > All Engagements and open the relevant record. Audit tasks can be assigned to an engagement in Validate, Fieldwork, or Awaiting approval through this route.
In the Audit Tasks related list, select New. In the Audit Tasks Interceptor, select Control Test. Complete the form and select Submit. Review Parent and Test plan carefully so that the new test belongs to the intended audit work. Use Short description to explain what the test covers and Assigned to to identify the person responsible for it.
The schedule includes Planned start date, Planned end date, and Planned duration, alongside the actual dates and duration. Planned duration accounts for the control test schedule and activity time. Agree on the testing window before relying on those fields to coordinate work; an intended start date and a recorded actual start date answer different questions.
The State choices include Open, Work in Progress, Review, Closed Complete, Closed Incomplete, and Closed Skipped. Choose the state that reflects the record’s progress. Before accepting a closed task as a satisfactory conclusion, examine the recorded assessment and any outstanding evidence.
Use the Audit Workspace creation route
For Workspace creation, the listed roles are sn_audit.manager and sn_audit_ws.supervisor. Navigate to All > Audit > Audit Workspace, select the lists icon, and choose All engagements or My engagements in the Execution list. This creation procedure assigns audit tasks to engagements in Validate or Fieldwork.
Open the engagement through its Name link. Its details appear on the Overview tab. Select the Audit tasks related list, then use the grouped button below the related lists to choose New control test. Complete the form and select Save. The State banner on Overview lets you monitor the test as it moves through its process flow.
The Workspace form uses Name for the test name and Parent for its parent engagement. It also includes Test plan, Assigned to, schedule fields, and separate design and operational testing sections. Inspect these values on the record you actually create, especially when moving between the standard interface and Workspace.
To record individual assessment procedures, open the Test steps related list and select New. Fill in Identifier, Assessment objective, and Objective effectiveness for each step. Make each objective specific enough that another reviewer can see what the step assessed without rebuilding the engagement.
Turn created records into assessable testing work
A control test captures both design and operational testing. Design expectations describe the requirement the control must meet, while Design assessment procedures explain how to assess its design. Design results record the findings. Set Design effectiveness to Effective or Ineffective based on that assessment, rather than treating successful record creation as a test result.
Operational testing examines how the control works in practice. In Workspace, use Operational expectations, Operational assessment procedures, and Operational results to connect the expected behavior, the assessment performed, and its findings. On the Workspace form, the Operating effectiveness field offers None, Effective, and Ineffective. The standard form calls the equivalent field Operation effectiveness, with the same choices.
Read each result against its procedure. A result that says the work was done tells a reviewer less than one that states what was examined and why the conclusion follows. A statement that work was completed gives a reviewer less information than an explanation of what was examined and how the conclusion follows. Keep the evidence request tied to the assessment objective so that the auditor can distinguish missing documentation from a control that failed its test.
After a standard control test is assigned, the assigned user can edit the results fields; other form fields require sn_audit.admin or sn_audit.manager. If an auditor cannot change a field, check assignment and the specific field before treating it as a creation failure. For the wider relationship between records and supporting material, see audit evidence and control tests.
Review coverage in the engagement grid
Users with the listed sn_audit.manager and sn_audit_ws.supervisor roles can open an engagement in Audit Workspace and select Control tests. List view presents the tests together. Hierarchical view exposes the relationship between control tests and their test steps, making it easier to review whether the intended assessment work has been broken down clearly.
Compare names, assigned auditors, effectiveness values, and results across the engagement. Use Request evidence on a row to collect material for that control test. This provides a follow-through action after creation: the team can identify a test that exists but still needs evidence without opening each test record.
Column personalization can expose Reference and Implementation Statement. Open the menu in a column header, choose Personalize columns, and use Search columns to locate fields. Select the columns needed for the review. When planning coverage across related controls, the separate discussion of sharing, inheriting, and testing common controls helps frame the scope decision.
Questions about control test record details
Can customers see Work notes?
On the standard form, Work notes are visible to the audit manager, while Additional comments are customer-viewable. Workspace labels the private field Work notes (Private), visible to the audit manager and audit supervisor. Choose the field according to the intended audience.
What happens when Confidential is enabled?
Access to the record is restricted to its assigned confidential users or confidential groups. Decide who needs access when applying confidentiality so that the people expected to carry out the assessment can reach the record.
Does deleting a grid row affect assessment procedures?
If the control test has related Assessment procedures, selecting Delete presents a confirmation identifying the related records that would also be deleted. Review that list before proceeding; deleting a test can affect more than its visible grid row.
What does the Issue field represent?
Issue identifies an issue related to the control test. When reviewing the record, distinguish that relationship from the assessment result itself: the link identifies the related issue, while the testing sections explain what the assessment found.