OBLYTECH Logo
OBLYTECH Logo

Build audit test plans from a test template

To build an audit test plan from a template, open a new test plan, select the test template, and the Audit Workspace form fills the design and operational test sections from it. Then add the control, name and duration and save. Templates save retyping, but check each plan’s control, duration and expectations before testers use it.

What an audit test plan records

Each test plan describes how one control is tested. The form holds a unique number and a name, the control the plan covers, the test template it is based on, and the expected duration of the test. The rest of the form describes the test itself in two sections.

The design test section has two fields. Design expectations state the basic requirement a control must meet to be effective. Design assessment procedures give the steps a tester follows to conclude whether the design achieves the control objective.

The second section covers operation. Operational expectations describe what must hold for the control to operate effectively. Operational assessment procedures are the detailed steps that show the control is operating successfully. In the workspace form, the Entity field fills in from the control you select, so you do not type it.

Choose the menu path that matches your release

The classic route, documented for the Brazil, Australia and Zurich releases, runs through All > Audit > Audit Testing > Test Plans. Click New, complete the form and click Submit. The role required for this route is sn_audit.user or sn_audit.external_auditor.

The workspace route, documented for the Yokohama and Xanadu releases, starts at All > Audit > Audit Workspace. From the Home page, click Create and select Test plan. You can also open the Audit workspace List page, click the lists icon, click Test plans in the Execution list and click New. The roles required for this route are sn_audit.manager, sn_audit_ws.supervisor, sn_audit_ws.auditor or sn_audit.user.

Menu paths and form labels change between releases, so check the path on your instance before you write steps for other staff.

Build a test plan from a template, step by step

Open the form and select the template

  1. Open a new test plan using the menu path for your release.
  2. Select the related template in the Test template field. In the workspace form, the design and operational test sections fill with the template values.
  3. Read the populated design and operational fields to confirm they describe the control you are testing.

Add the details that belong to this plan

  1. Enter a name that states what the test covers, so the plan is easy to find in a list.
  2. Choose the control the plan covers. In the workspace form, Entity follows from that choice.
  3. Set Duration to the expected length of the test.

Save the plan and reopen it

Click Submit on the classic form, or Save on the workspace form. Reopen the plan and confirm that the control, the duration and all four design and operation fields match what you intended. If the template text does not fit this control, change the plan’s own fields and leave the template as it is.

Keep a note of the template you used alongside the plan in your review record. When one template feeds several controls, a reviewer who opens a later plan can then tell which wording came from the shared source and which was written for that control.

Write expectations and procedures a reviewer can check

An expectation and a procedure do different jobs. The expectation says what the control must do. The procedure says what a tester does to find out whether it does. Keep them apart so a reviewer can see both the target and the method on one screen.

For design, write the expectation as a requirement the control either meets or misses, such as who approves a change and which record that approval leaves behind. For operation, the expectation should describe how the control behaves across the period under test. The procedure should name the population or sample, the evidence to pull and the comparison to make.

Numbered steps read better than a paragraph when a second tester has to repeat the work. A procedure that restates the expectation gives the tester nothing to do. Name the record type to examine and describe what a pass looks like. For the evidence side of this work, see evidence and control tests.

Here is the difference in practice. A design expectation that a change must be approved before release gives the tester a question to answer. A procedure that selects a sample of changes from the period, opens each approval record and checks that the approver held the authority at the time gives the tester a route to the answer.

Review the plan before testers start

Run this check on each plan that came from a template, including plans generated in bulk. Open a sample and confirm the following.

  • The control matches the control objective the test is meant to cover.
  • The duration reflects the testing work rather than a placeholder value.
  • No template wording remains where it does not describe this control.
  • The name separates this plan from other plans built from the same template.
  • The person who will run the test holds a role that the menu path requires.

If your team also uses a testing and acceptance checklist, check the plan against it as well, using the audit management testing and acceptance checklist. For help planning this work, see ServiceNow implementation.

Create test plans for all controls from one template

When Policy and Compliance Management is installed, a test template can create test plans for all the controls associated with the control objective of the test plan. Run this from the template record rather than from the plan list.

  1. Navigate to All > Audit > Audit Testing > Test Templates.
  2. Select the test template you want to generate plans from.
  3. Click the Create Test Plans for All Controls related link.

The role required for this action is sn_audit.manager or sn_audit.admin. Check the template content before you run it, because the generated plans start from that template. Then open one generated plan and confirm its control and name before you work through the rest.

Mistakes to avoid when one template feeds several controls

A common error is treating the template as finished text. A template written for one control area often has expectations that sound right for several controls, but each control produces different evidence. Read each design expectation and ask which record would show it is met. If you cannot name that record, rewrite the expectation before the plan goes out.

A second error is leaving Duration at the template value across many plans. Testing effort differs from control to control. Set the duration to the work each control needs, and check it with the people who will run the test.

A third is naming plans after the template alone. When several plans share one template, their names are often the first thing a tester sees in a list, so put the control or area into the name.

Keep each expectation and its procedure consistent with each other. If a procedure checks something the expectation does not mention, one of the two is out of date.

Questions about test plan forms and template actions

Why does the Control field not appear on my test plan form?

On the classic test plan form, the Control field is only visible when the Policy and Compliance Management plugin is activated, so check the plugin status on your instance before you troubleshoot the form itself.

Why is the Create Test Plans for All Controls link missing from a template?

The link is visible only when controls associated with the control objective of the test plan do not yet have a test plan generated from the current template. If those controls already have plans from that template, the link is not shown.

Why is the Entity field empty on a new test plan?

In the workspace form, Entity is filled in from the value you select in the Control field. Choose the control first, then check the field again before you save.

Can I create test plans from an engagement instead?

On the Yokohama and Xanadu releases, yes. Open an engagement that is in Validate or Fieldwork state, select the test plan, and click Generate Control Tests in the Test plans related list. For the control-test side of this work, see creating control tests from an audit engagement.

What does Revert to template change on a test plan?

The Revert to template button changes the content of the test plan back to the content in its test template. Use it on the workspace form when a plan has drifted from the template and you want the template wording again. The plan’s current content is replaced, so copy any custom procedure text somewhere safe first.

Why does my form show Operation test instead of Operational test?

The label depends on the release. The Brazil, Australia and Zurich forms use Operation test, with Operation expectations and Operation assessment procedures. The Yokohama and Xanadu workspace forms use Operational test, with Operational expectations and Operational assessment procedures. The fields do the same job in both, so the difference matters mainly when you write training material for a mixed group of users.