OBLYTECH Logo
OBLYTECH Logo

Build an audit test template and link it to control objectives

An audit test template holds the testing criteria for one control objective. Create it in the Audit Testing area, complete its design and operation fields, then relate it to the control objective. Test plans can then be generated for the controls that share that objective, instead of writing each plan from scratch.

Why link a test template to a control objective

Control testing in an audit engagement checks two things: whether a control is designed to meet its objective, and whether it operates effectively. For a group of controls that serve the same objective, the test logic is often the same. What changes between them is the system, the control owner and the evidence each one produces. A template lets you write the shared logic once and apply it to each control.

Without a template, audit managers create each test plan by hand before the engagement starts. The copies drift. One plan picks up a tighter procedure, another keeps older wording, and by fieldwork nobody can say which version the team agreed on. A template keeps the criteria in one record that the team can review before any plan is written.

The link to the control objective is what gives the template its reach. Audit owners create generic control test templates for a control objective, so they do not need an individual test plan for each control that serves it. The template describes the test once, and the objective ties it to the controls. Before you rely on that link in a live engagement, confirm it on the template record.

If you are also working out how evidence fits with control tests, the evidence and control tests guide for ServiceNow audit management covers that side of the work. Read it before you decide how much evidence detail belongs inside the procedures themselves.

Fields to complete on the test template

The test template form has general fields and two test sections, labeled Design and Operation. Complete each one with the same care. Test plans created from the template use much of the same testing criteria, so an unclear field affects every plan built from it.

  • Number: the unique identification number for the template. Choose a numbering pattern your team can sort by objective.
  • Duration: the expected length of the test. Make it match the assessment steps, so the schedule reflects the work.
  • Short description: a brief, general description of the template. Include the objective and the kind of test, so the record makes sense in a list.
  • Design expectations: the condition a control must meet to be effective in its design.
  • Design assessment procedures: the steps that conclude whether the design of the control achieves the control objective. Write these against the design expectation so the two read as a pair.
  • Operation expectations: the conditions that show the control operates effectively to achieve the control objective.
  • Operation assessment procedures: the detailed steps that confirm the operation expectations are met.

The form does not include a control objective field, so attach the objective in a separate step after you save the template, as described below.

Write each expectation as a condition someone can observe or check, and write the procedure as the steps that produce that check. An expectation such as “access is reviewed” gives the tester nothing concrete to do. An expectation such as “the reviewer signs off each access change before it takes effect” can be sampled and tested.

Create the test template in Audit Testing

Role required for this action: sn_audit.admin, sn_audit.manager or sn_audit.user. The sn_audit.user role can create the template, but it is not on the list for the relate step covered next.

  1. Navigate to All > Audit > Audit Testing > Test Templates.
  2. Click New.
  3. Fill in the form fields described in the previous section.
  4. Click Submit.

Once the template is submitted, relate it to a control objective before you generate any test plans from it. The bulk plan creation works from the objective, so the link has to exist first.

Relate the template to a control objective

Role required for this action: sn_audit.admin or sn_audit.manager. The relate step uses the same Test Templates list as the create step, so confirm that the person doing the link holds one of these roles before you schedule the work.

  1. Navigate to All > Audit > Audit Testing > Test Templates.
  2. Open the test template record.
  3. Select a control objective and select Update.

Reopen the record after the update and confirm the objective is the one you intended. A template linked to the wrong objective can generate plans for the wrong set of controls, so this check takes a minute and can prevent a larger cleanup later.

Treat the relate step as part of building the template, not as a follow-up task. A template that sits unlinked is easy to forget, and the controls it was meant to cover end up with individual plans written by hand.

Generate test plans from the template

Test plans can be created from scratch or based on a test template. A template is the faster route when several controls share one objective, because the criteria are already written.

Once the template is related to an objective, open the template record and use the Create Test Plans for All Controls related link. It creates test plans for the controls associated with that objective. The link only appears while at least one of those controls still lacks a plan generated from this template.

If GRC: Policy and Compliance Management is installed, a template can also create test plans for all controls associated with the control objective of the test plan. Check this on your instance, because the option depends on that application being installed.

Settle the template criteria before you generate plans. The team then tests against one agreed set of criteria rather than a set that changes after the plans exist.

When an engagement reaches the Validate state, the test plans for the controls in its scope are associated with the engagement automatically. Audit managers can then generate control tests from those plans and create individual control tests as needed.

Once the plans exist, the steps for creating control tests from an audit engagement pick up where this page stops. For help planning this work, see ServiceNow implementation.

Checks before the template goes live

Run these checks before you rely on the template for a live engagement. Each one catches a problem that would otherwise surface during fieldwork, when changing the template is slower and more disruptive.

  • Read the design expectation and the design assessment procedure together. If the steps would not produce evidence that answers the expectation, rewrite the procedure.
  • Read the operation expectation against the period the engagement covers. An expectation the tester cannot observe in that period cannot be tested in it.
  • Compare the duration with the steps. A duration that does not match the procedure makes the schedule misleading.
  • Confirm the control objective link, and confirm that the controls expected to use the template are linked to the same objective.
  • Check the short description. Another auditor should be able to tell what the template tests from the list view without opening it.

Before you save a new template, search for an existing one on the same objective. Two templates for one objective with different criteria can lead to two sets of plans for the same controls, and the team then has to decide which set counts. Agreeing on one template per objective is the cheaper decision.

For a wider set of checks on the audit testing setup, see the audit management testing and acceptance checklist. Read it alongside the list above, since the two cover different points in the setup.

If several controls under one objective overlap, review the objective itself before you build more templates. The page on deduplicating similar control objectives is the place to start.

Questions about audit test template setup and control links

Can one template cover controls under different objectives?

Not in one record. The relate procedure selects a single control objective, so a template is related to one objective. Build a template for each objective and keep the criteria specific to it. A shared template with mixed criteria tends to produce test plans that fit none of the controls well.

What should a procedure look like for an automated control?

Describe what the tester checks, which system output or configuration record shows the result, and how the tester records the outcome. Name the evidence the tester keeps and state the period the check covers. Write the steps neutrally, so a tester who has not seen the control can run them.

What if a control objective has no controls linked yet?

Build the template and its criteria first, then link the controls to the objective. The Create Test Plans for All Controls related link only appears when controls tied to the objective still lack a plan from this template, so controls linked later are covered by returning to the template record and using the link then.

How detailed should a design expectation be?

Detailed enough that two testers would reach the same conclusion from it. A short expectation that names a condition, a reviewer and a frequency is usually easier to test than a long paragraph of intent. Put the reasoning behind the expectation in the procedure, where the tester reads it during the test.

How often should a test template be reviewed?

Review it when the control changes, when the wording of the objective changes, or when a finding shows that the procedure missed something. Treat each revision as a change to the criteria, and check the test plans already generated from the template against the revised wording before fieldwork.