OBLYTECH Logo
OBLYTECH Logo

Running a Crisis Event in ServiceNow BCM: Step by Step

A crisis event is the record you open when a significant disruption threatens business operations. In the Business Continuity Workspace you create it in the Pending state, attach impacted assets and activated plans, add event tasks, and start it. Collaboration threads, action items and issues run alongside that work, and the event closes once it has been approved. For the wider concept, see the plain-language BCM guide.

Creating the crisis event and setting its level

Open the Business Continuity Workspace, go to the crisis events list in the Pending state, and select New. The form opens with the state set to Pending and the event type set to Actual. The planner and program manager roles (sn_bcm.planner and sn_bcm.program_manager) can create the event.

Field What to enter
Short description A brief summary of the event
Impact 1 High, 2 Medium or 3 Low, for the criticality of the affected service
Priority 1 Critical through 5 Planning, which sets the order of work
Level 1 Site, 2 Regional, 3 Corporate or 4 Global
Assigned to or Assignment group An owner, or a group to pick the owner from

Set the Level deliberately. It shows the escalation tier in the header on all tabs, so anyone who opens the record can see the scope first.

Using the event tabs to track the response

The record is split into tabs: Overview (state and progress), Details, Assets, Plans, Action items, Emergency Notifications, Issues, Similar tasks groups, Collaborations and Event tasks. The Emergency Notifications tab works through the Everbridge integration, which is covered in the crisis map and notification guide.

Adding an activated plan pulls its related plans, assets and event tasks into the event, so they do not have to be entered one at a time. The plan side of the workflow is set out in the BCM in ServiceNow guide. The event’s activity feed also records the changes, emails and attachments made on each collaboration thread.

Working the event tasks and their states

Event tasks carry the recovery work. To add a task the plans did not anticipate, select New ad-hoc task on the Event tasks tab. If the event and the activated plan are both in Work in Progress, the task opens as Open. If the plan is still Pending, the task opens as Pending. You cannot add an ad-hoc task to a plan that is already closed complete or closed incomplete.

Select Start Event to move the record into Work in Progress. A task that depends on others stays Pending until those tasks close. If a task has a circular dependency, it has to be triggered by hand. A program manager can use Trigger to move a Pending task to Open regardless of its dependencies, and Skip Task to move a Pending or Open task to Closed Skipped while the event is in progress. For the exercise side, see BCM exercises and event tasks.

  • Pending: waiting to start, usually on a dependency.
  • Open: ready to be worked.
  • Work in Progress: under way, with an actual start recorded.
  • Closed Complete: finished in full, with an actual end recorded.
  • Closed Incomplete: ended as incomplete, with an actual end recorded.
  • Closed Skipped: skipped by a program manager, with actual start and end left empty.
  • Closed Failed: ended as failed.

If you move a task to Work in Progress or close it without entering an actual time, the current date and time is written in. A state change that is not permitted shows an error message that says the update is invalid. For fault-finding on a state change, see the BCM troubleshooting guide.

Recovery task members do not need the event page. They work from My Recovery Tasks, and once a task is Closed Complete its fields lock for them, though they can still add activity notes. Users with access to the event can reopen a task closed by mistake. Users with edit access to the event can also bulk edit State, Assigned to, Actual start, Actual end and Assigned group across the Event tasks list, a feature that starts with version 6.1.x.

Grouping duplicate tasks

Large disruptions can produce the same task more than once. Create a similar tasks group from the Event tasks tab, name it, and add the duplicates. The platform will not place a task in the same group as a task it depends on, which prevents a cyclic dependency. When the event starts, the first task in the group to execute becomes the original and the others are marked as duplicates. The original task field is set by the system and cannot be edited. Unlink removes a task from the group but keeps it on the event, while Remove deletes it from the event.

Creating action items for recovery teams

Action items are follow-up assignments. The Create Action item form offers three types: Task, Assessment and Assessment template, which is built on the Smart Assessment Engine. Assign the item to a group, a user or an additional assignee list, and record the actual start, actual time taken, actual end and due date. Starting with BCM release 9.0.x, crisis managers can create action tasks for recovery members during open crisis events and exercises.

Linking issues to the event

The Issues tab appears when the GRC: Profiles plugin is installed. Select New there to raise an issue from the event. The issue source is set to Crisis event, the classification to Business Continuity Management, and the priority to 2-High by default. Select Add to link an existing active issue, which records the event as a secondary source. Remove only breaks the link; the issue record stays. The link can also be made from the issue side, through its Crisis events tab.

Coordinating through collaboration threads

Starting with BCM core release 12.x.x, a collaboration thread groups the recovery teams, impacted assets and email for one coordination effort. A thread belongs to one crisis event and cannot be deleted on its own. To retire it, set its State to Closed.

Two things must be in place before email works. An administrator has to configure an active email account and enable the Email sending enabled and Email receiving enabled system properties. Sending also needs the platform email_composer role, which is granted automatically to sn_recovery.event_manager.

To open a thread, go to the Collaborations tab, select New, and enter a name, a description and one or more recovery teams. The Impacted assets field lists only assets already attached to the event, so add the activated plan first if the list is empty. Saving opens the thread in the Open state and emails the members of the selected teams.

The To field of a new email fills from the recovery teams, including members of nested sub-groups. Only active users are included, and duplicate addresses are removed. The subject and body start from a default template that names the event. Each row in the Emails tab shows Processed or Error, and an inbound reply is captured automatically. Attachments sent by email appear in the Email Attachments tab, separate from the record’s own attachments.

Access is split across role families. The create procedure names sn_bcm.manager, while the thread overview names sn_recovery.event_manager and sn_recovery.event_user for creating and updating threads, and sn_recovery.event_viewer for reading them. Confirm the combination your instance grants before handing threads to a team. For how these roles sit within a wider programme, see the BCM roles and RACI guide.

Approving the crisis event and closing it

Complete all activated plans before you submit.

Select Submit for approval. The event moves to Pending Approval, where only the Work notes field can be edited. Approval rules generate approval records for the approvers, and the Approvals and Approval History tabs record each decision. An approver selects Approve and then Save. A rejected event moves to Returned, from which it can be resubmitted or closed. An approved event is closed as Closed Complete or Closed Incomplete.

Generate MS Word produces a downloadable Word report. Generate PDF produces a PDF that includes a table of event tasks and plan asset dependencies and, starting with BCM core 12.x.x, the event’s Level and a numbered Collaboration Threads section listing each thread’s recovery teams, impacted assets and state. By default the PDF is generated and attached once the event closes.

Frequently asked questions

Who can approve a crisis event?

The program manager role sees the Approve and Reject buttons. Planners can submit the event for approval, but the approval itself sits with the approvers configured on the event.

Does a task wait for its dependencies when the event starts?

Yes. It stays Pending until the tasks it depends on are closed. A program manager can trigger it to Open sooner, which overrides the dependency, so record the reason in the work notes.

Does closing a collaboration thread delete it?

No. A thread cannot be deleted on its own, so closing it is how it is retired. It is removed only when its crisis event is deleted.

Who receives an email sent from a thread?

Members of the selected recovery teams and their nested sub-groups who are active users. Anyone outside those groups has to be added in the Cc or Bcc field before sending.

Can an issue be removed from a crisis event without being deleted?

Yes. Remove breaks the link between the issue and the event, and the issue record is kept.

Where does the record of the response live after the event?

The Activity panel tracks the activity on the event, and the Word or PDF report is a downloadable copy of the event record.