OBLYTECH Logo
OBLYTECH Logo

Schedule data imports for the crisis map

Scheduled data imports pull threat and alert data into the crisis map on a timed basis, and they are how you manage subscriptions to internal or external threat feeds. Set up Google Maps first, then open Scheduled Imports under Threat and Alert Data Feeds and add a record for each feed.

What a threat feed brings into the crisis map

A threat feed is a stream of alerts about conditions that could affect the organization. Those conditions range from weather warnings and pandemic notices to geopolitical developments. They also include internal events such as security incidents and system outages. The crisis map gives you situational awareness across those alerts, and the scheduled imports are what bring them in.

Treat each import as a standing subscription rather than a one-time load. The data source determines what kind of alert comes in, and the schedule determines how quickly a new alert shows up. Give both settings equal attention when you set up a feed.

Prepare the crisis map and confirm your role

The crisis map needs the Google Maps setup in place before its functionality is enabled. Complete that setup before you build any import, so the import is the only new variable when you test the first run.

Roles for configuring scheduled imports

Configuring a scheduled data import requires the sys_admin role on Brazil, Australia and Zurich. On Yokohama and Xanadu, the same step lists the System administrator role instead. Check the role label on your release before you assign the work, and confirm that the account you plan to use holds that role.

Review the two base imports before you add your own

The base system includes two scheduled data imports. To see them, open Threat and Alert Data Feeds > Administration > Scheduled Imports. The first is GDAC Feed Source, which uses the GDAC Feeds data source. The second is Weather.gov Severe Alerts Scheduled Import, which uses the Weather Gov Alerts data source.

Read these two records before you add anything. Their field values show what a working import looks like on your instance, including the run-as user and the run frequency. Leave them unchanged while you learn the form, so you have a reference point when a new record behaves differently.

Fill in the Scheduled Data Import form

Select New on the Scheduled Imports list to open a blank form. Work through the fields in the order below, then select Submit.

  • Name: the label for the import. Naming the record after its source is the usual choice, so it reads clearly beside the two base imports.
  • Data source: the internal or external source that the threat and alert data comes from. Pick the specific source the feed belongs to.
  • Run as: the user who has permission to import threat alerts. The import runs under that account, so confirm the account holds the permission before you save.
  • Active: turns the import on. Clear it while you are still building the record, and select it once the settings are final.
  • Application: a read-only field that helps distinguish the items relevant to the crisis map.
  • Run: the frequency at which the import pulls data from the feed.
  • Conditional: select this when the threat alert import requires a conditional script.
  • Concurrent Import: allows concurrent imports, which means runs of the same import can overlap.
  • Execute pre-import script: enables a script that runs before the import.
  • Execute post-import script: enables a script that runs after the import.

Set the run frequency to match the feed

The Run field controls how often the import pulls from the feed. Match the frequency to how often the source publishes changes rather than choosing the shortest interval available. A tight schedule on a slow-moving feed typically produces runs that find nothing new. A loose schedule on a fast-moving feed leaves the map behind the events it is meant to show.

Decide when a script is worth enabling

Enable the pre-import script when the import needs preparation before it reads the feed. Enable the post-import script when the results need follow-up work once the run finishes. A feed that arrives in a shape the import already handles usually needs neither, and each script you add is another place for a problem to hide. Turn on Conditional only when the threat alert import genuinely needs a conditional script, and test the feed before you rely on it.

Plan your feeds before you configure them

A short plan on paper saves rework later. Work through the following steps for each threat type your team needs to see.

  1. Name the threat type, such as weather, pandemic, geopolitical or internal security events.
  2. Match the type to a feed and its data source.
  3. Choose a run-as account that holds the permission to import threat alerts.
  4. Set a run frequency that matches how often the source changes.
  5. Decide whether the feed needs a pre-import or post-import script.

Record the answers next to the record name. A written plan also makes it quicker to work out which feed a given alert came from. For help planning this work, see ServiceNow implementation.

Test the first scheduled run and check the map

Submit the record and leave it active until the scheduled run has happened. Compare the time the run started with the frequency you set. Then open the crisis map and confirm that the new alerts appear. The first run is the real test, because a record can save without errors and still produce nothing you can use on the map.

If the run does not behave as expected, check these items in order:

  1. The Active option is selected on the record.
  2. The Run as user holds the permission to import threat alerts.
  3. The Google Maps setup is complete.
  4. The Data source matches the feed you meant to subscribe to.
  5. Any pre-import or post-import script you enabled is correct.

To monitor how runs behave over time, see scheduling and monitoring import runs.

Keep threat feeds apart from vulnerability imports

Scheduled imports for the crisis map handle threat alerts. Vulnerability data is a separate kind of import with its own steps and checks, so the crisis map setup does not replace it. If you are bringing in vulnerability records, checking the status of an NVD vulnerability import covers that side of the work.

Keep the two sets of records separate in your plan. Mixing them makes it harder to tell which feed produced a given alert, and it makes troubleshooting slower when one of them stops.

Avoid the common setup mistakes

The problems below tend to appear when someone adds a feed for the first time.

  • Saving a record with Active selected before the fields are complete.
  • Choosing a run-as user that lacks permission to import threat alerts.
  • Setting a short frequency on a feed that publishes less often.
  • Turning on Concurrent Import without knowing whether overlapping runs suit the feed.
  • Adding a script to a feed that does not need one.

When one of these shows up, edit the existing record rather than creating a second one for the same feed. Two records for one source make it hard to tell which run produced which alert. If overlapping feeds create duplicate alerts, the mapping side of the work is covered in avoiding duplicate records with transform maps.

Connect the map to your continuity plans

Once alerts reach the map, the next question is who needs to hear about them. Notification planning is a separate step with its own setup. The page on Everbridge notification setup for the crisis map covers that side. Keep the import design and the notification design in separate notes so a change to one does not get lost in the other.

Questions about editing, pausing and combining imports

Should I edit a base import or add a new record?

Add a new record for each additional feed and leave the two base imports as they are. Changing a base record changes a feed the system already includes, and it becomes hard to tell later which value you adjusted.

How do I stop an import without losing its settings?

Clear the Active option on the record and submit it. Active is the setting that turns the import on, so clearing it turns the import off, and selecting it again turns the import back on when the feed should resume.

Can one scheduled import cover two feeds?

The form has one Data source field, so a single record points at one source. Keep one record per feed, which lets you pause, change or trace one feed without touching the others.

What should I check after a change to the Google Maps setup?

Recheck the Google Maps setup first, since it is the prerequisite for the crisis map functionality, then watch the next scheduled run and the map afterward.

Is one threat feed enough for the crisis map?

A single record covers one data source. The base Weather.gov import is a weather feed, so security incidents and system outages need a feed of their own. Add a feed for each type of threat your team needs to see, and check coverage against the plan you made before you configured anything.