OBLYTECH Logo
OBLYTECH Logo

Import NVD vulnerability data and check the import status

You can start a full National Vulnerability Database (NVD) import in ServiceNow without waiting for the daily or weekly schedule. Open the relevant integration and select Execute Now, then check its Vulnerability Integration Runs related list. If the initial import failed, investigate the run details before deciding whether another execution is needed.

Prepare the National Vulnerability Database NVD import

Use a manual import when the first load failed or the scheduled load is too late for your setup work. Starting a run only queues the work; the run record is what shows whether it succeeded.

Vulnerability Response and the Vulnerability Response Integration with NVD application must be installed and configured before checking running imports. The installation action requires admin. For the manual NVD import, the required role is sn_vul.vulnerability_admin. Viewing import run status requires sn_vul.vulnerability_admin or App-Sec Manager. Assign the action to someone with the appropriate access rather than assuming that installation access covers operational checks.

Each integration has a configured run-as user, with VR.System as its default. Leave that value unchanged. Record the integration you intend to run, the reason for the manual load, and the outcome of the previous attempt. This gives the person checking results a clear starting point and prevents confusion between several similarly named integrations.

The steps here follow Brazil behavior; check the application version and configuration on your instance before applying them. Check the run setting on the integration record before relying on a schedule. Once installed, the CVE-only integration runs daily, the CPE-only integration is set to run daily but starts inactive, and the Unmapped CPE integration runs on demand. For the surrounding setup sequence, see NVD, CWE, and third-party library imports.

Choose the integration that contains the required data

The CVE and CPE integrations serve different purposes. A successful run of one does not establish that another has supplied its data. Choose the record by the information you need to recover, rather than selecting the first NVD result in the list.

  • NIST National Vulnerability Database Integration – API (CVE only) retrieves NVD vulnerability data. It is active by default and is configured to run daily after installation.
  • NIST National Vulnerability Database Integration-API (CPE only) retrieves platform enumeration data into Vulnerable Software. It is inactive by default and is configured for daily execution. Activating CPE-only also activates CVE-only and Unmapped CPE and sets their execution to on demand. Successful CPE-only completion triggers CVE-only, whose successful completion then triggers Unmapped CPE. Account for that chain before changing activation.
  • NIST National Vulnerability Database Integration-API (Unmapped CPE) retrieves CPE data associated with fetched CVEs. It is inactive by default and is configured to run On Demand. Unmapped CPE retrieves CPEs for the CVEs that were retrieved, regardless of its Import since value. Interpret its result against that CVE population.

The combined CVE and CPE integration is deprecated. Use the relevant separate integration when planning the import. If your concern is missing CVE entries, begin with the CVE integration and its runs. If the concern is software enumeration or CPE relationships, identify which CPE integration is expected to provide that information.

Keep activation separate from recovery. An inactive CPE integration is a configuration decision to review, not evidence that the CVE import failed. Before changing activation, agree on the required data and the resulting execution sequence. A broader Vulnerability Response health check can help organize the review when several integration concerns overlap.

For a historical CPE-only load, review Import since on the Integration Details tab. Its empty default retrieves the last 357 days; a start date requests historical data from that point. A successful import resets the date to the selected day’s date and time. Record the intended historical coverage before executing, because a successful run against a narrower period may still leave the older data you expected absent.

Start a manual full import

Perform the manual import with sn_vul.vulnerability_admin. Keep a note of when you start it so you can distinguish the new run from older failures during verification.

  1. Navigate to All > Vulnerability Response or Application Vulnerability Response > Administration > Integrations.
  2. Select Execute Now.
  3. Move to the run status checks for that integration and identify the execution associated with this attempt.

Before you select Execute Now, check which integrations are active. The CVE-only integration is active by default, while the CPE-only and Unmapped CPE integrations are inactive by default, so running the CVE-only integration alone does not load CPE data. Activate the other two only when the data they supply is part of the recovery.

Keep the reason for the manual attempt specific: initial import recovery and an urgent first load are clearer operational reasons than a general concern that data looks old.

Before issuing another execution, inspect the current attempt. Repeatedly selecting Execute Now does not explain why the previous import failed. Preserve its failure information and establish whether processing is still progressing. For related planning beyond this integration, see data migration and import sets.

Read the run outcome and investigate timeouts

Confirm the basics before you read any run. Vulnerability Response and the NVD integration application must be installed and configured, and the NVD integration imports must be running. The CVE-only integration runs by default. The CPE-only and Unmapped CPE integrations stay inactive until you activate them, so a missing CPE run usually reflects configuration rather than a failure.

With sn_vul.vulnerability_admin or App-Sec Manager, open the integration from Administration > Integrations and select the Vulnerability Integration Runs related list. Check that the imports have succeeded. Review the runs associated with the selected integration rather than treating an older successful entry as proof that the new manual attempt completed.

Network interruption and damaged data during transfer and transformation are common reasons for failed runs. When either condition is encountered, Execute Now can rerun the integration. Capture the observed failure before rerunning so the next outcome can be compared with the original problem.

A timeout deserves closer inspection. Execution generates processes, and those processes can have import queue entries carrying pages of data. Large payloads can take longer than the one-hour processing window. A timeout error can therefore appear even while the integration continues processing data.

Starting with Vulnerability Response version 18.2.4, periodic heartbeats help identify continuing work. In the Import Queue Entry page, Last Record Processed reflects progress as the queue creates or updates records. If a queue entry exceeds an hour, the system also checks whether that field is older than an hour. An old timestamp indicates a stuck entry that is timed out.

The properties sn_sec_cmn.record_threshold_heartbeat and sn_sec_cmn.maximum_heartbeat_delay govern the processed-record threshold and maximum heartbeat delay. Treat these as diagnostic context before proposing a configuration change. A large queue and a queue that has stopped making progress require different responses; the error message alone does not establish which condition you have.

If Last Record Processed continues advancing, include that observation in the incident notes. If it is stale, record the queue details alongside the run failure. This makes the next decision traceable and gives the next operator evidence beyond a screenshot of the overall run.

Validate imported data before closing recovery

After the runs succeed, inspect the resulting library data. Viewing vulnerability libraries requires sn_vul.remediation_owner. Navigate to All > Vulnerability Response > Libraries, select NVD, and open a vulnerability record. Choose a record relevant to the original missing-data concern so the check tests the reason you performed the import.

Explore the record relationships that matter to that concern, such as vulnerable items, exploits, solutions, and patches. When Unmapped CPE is activated, associated CPE data appears in the Vulnerable Software related list of the NVD vulnerability entry. Distinguish this record-level relationship from the separate CPE-only integration’s software data.

If the record shows CVE details but no associated CPE data, check whether the Unmapped CPE integration has been activated and run on demand. That data sits in the Vulnerable Software related list of the NVD vulnerability entry, so a gap there points to the Unmapped CPE run more than to the CVE-only import.

Record four things when you close the recovery: the integration you ran, when you started it, the run outcome, and the library record you checked. A note that only says Execute Now was selected tells the next operator nothing about the data.

If a record still looks incomplete, identify the missing data category before planning another import. Separate CVE availability, CPE relationships, and third-party library references in the investigation. For help planning this work, see ServiceNow implementation.