To rescan Tenable vulnerable items, open an assigned Tenable.io or Tenable.sc record in the workspace, select Rescan, choose the integration instance and imported scanner credentials, then select Request rescan. Follow the scan record to check progress. This lets you verify remediation between scheduled scans, while vulnerable item updates arrive through the next scheduled integration import.
Prepare the record before requesting a Tenable rescan
Start with the finding that needs verification. A patch installation or configuration change gives you a reason to scan, but the scanner result is the evidence you need to assess whether the vulnerability remains. Choose the record deliberately so that the request covers the change you intend to validate.
The vulnerable item or remediation task must have Tenable.io or Tenable.sc as its source. For a remediation task, its state must be something other than Closed, and all associated vulnerable items must come from Tenable.io or Tenable.sc. Inspect that membership before treating a task as a convenient batch of findings.
In the IT Remediation Workspace, the vulnerable item or remediation task must be assigned to you. The role required for this workspace action is sn_vul.remediation_owner. For rescans in the Vulnerability Manager Workspace, the required role is sn_vul.vulnerability_analyst or sn_vul.vulnerability_admin. Keep these action requirements separate when checking access.
Tenable credentials are also required. The credential choices come from the Tenable.io and Tenable.sc Scan Credential Integrations. If the credential needed for your target is absent, resolve that prerequisite before submitting a request with another credential merely because it appears in the list.
These steps describe the workspace flow. Check the controls on your instance and release before applying them; the classic environment has a separate rescan procedure. For context on what the underlying record represents, see the vulnerable item explained.
Choose between one vulnerable item and a remediation task
A single vulnerable item is a focused starting point when you want evidence for one finding. A remediation task can cover several related findings, so it needs an additional scope review. Write down which configuration items and vulnerabilities you expect the request to include before opening the credential picker.
When a remediation effort is used to initiate a rescan, the associated vulnerable items are scanned. Instance selection then matters: for a remediation task rescan restricted to one integration instance, the scan includes the active vulnerable items associated with that task for that instance, using the selected credentials.
Compare the task’s full membership with the instance and credentials you selected before reading a result as coverage of the whole task. Review the intended coverage against the task membership instead of assuming that submitting from the task proves that its entire remediation scope was checked.
The configuration item provides another reference point. Compare the CI you intended to remediate with the CI attached to the finding. If those do not align, investigate the record selection before interpreting any result. See configuration item definitions when clarifying which managed object the finding concerns.
Before you start, check the state of the record as well. A remediation task qualifies in any state except Closed, so an open task in progress can be rescanned, while a closed task cannot. Starting from the task scans every vulnerable item attached to it. Narrowing the selection to one integration instance limits the scan to the active items on that instance, so set the instance filter deliberately before you submit.
Rescan Tenable vulnerable items with the right credentials
- Open the assigned vulnerable item or remediation task that has the appropriate Tenable source.
- Select Rescan in the upper right of the record. The modal asks for the integration instance or instances and scanner credentials.
- Select the search icon to open Select a scan credential.
- Use the column filters to narrow the credential choices by Name, Integration instance, and Type.
- Review your selections in the updated Rescan modal, then select Request rescan.
The Name column helps identify the credential you intend to use. Its column menu provides filtering through the vertical three dots. Use the identity of the credential as a selection check, rather than choosing a familiar name without confirming its instance and type.
The Integration instance column lets you select the Tenable.io or Tenable.sc integration instance from which to initiate the request. Multiple integration instances can appear. Where a vulnerable item exists in more than one instance, this filter lets you narrow or broaden the instances included in the scan request.
The Type column represents the available scanner credential types imported from Tenable. Use its column menu to select the required credential types. Review all three dimensions together: a matching name does not replace checking the instance, and selecting an instance does not settle which credential type you need.
Once the filters narrow the list, select the credential, then confirm your choice in the updated Rescan modal before you request the scan. That modal is where you review the final instance and credential choices. If the list comes back empty after filtering, check whether the credential type you need was imported for that instance before changing other settings.
For a task spanning several findings, pause before submitting and compare the final choices with your intended scope. This is the point where a broad remediation task becomes a specific scan request. For help planning this work, see ServiceNow implementation.
Read the scan record before judging the result
After submission, the message The scan request is being processed appears. Select View status in that message to open the scan record, identified by its VSCAN number. Record that number with your remediation notes so a later review can connect the request to the finding you were checking.
Inspect the record through its related lists. Each list answers a different operational question, so reading the parent state alone leaves gaps in the verification trail.
- Details shows the parent scan number, scanner source, and state. Scan Summary provides completed and failed scan information.
- Scans shows child scans and their states. The parent state becomes Complete when all child scans complete.
- Source shows the vulnerable item, its associated configuration item and vulnerability, the vulnerable item state, and its remediation status.
Use Details to confirm the request belongs to the scanner source you intended. Use Scans to understand the work represented beneath the parent. Use Source to reconnect the scan with the affected record. This sequence ties execution evidence to the remediation question instead of treating a scan number as proof by itself.
The Source list is where the remediation question gets answered. Compare the vulnerable item state and remediation status shown there with the scan outcome before you decide the finding is resolved. If the scan completed but the item still shows its earlier state, read that as a sign that the update has not arrived yet, not as proof that the fix failed.
If a scan fails, preserve the failed scan information when handing the issue to the person investigating it. Include the selected integration instance, the credential identity, and the intended finding. Those details give the investigation a defined scope without assuming a particular failure cause.
When the parent scan shows Complete, look at the child results before you treat the rescan as clean. The parent moves to Complete once every child scan has finished, but that alone does not show that each child succeeded. Open Scan Summary to see how many scans completed and how many failed, and treat any failure as unresolved until you have explained it.
Separate tracking, scan completion, and vulnerable item updates
ServiceNow tracks the rescan until it completes successfully or the configured tracking period expires, whichever occurs first. A tracking timeout does not stop the underlying scan. It means ServiceNow has stopped following the rescan status, so a timeout should not be read as a cancellation result.
When the tracking period runs out, reopen the VSCAN record and read its Details and Scans lists rather than submitting the request again. The scanner keeps running after ServiceNow stops following the status, so the record shows what happened. A second request on the same finding usually starts another scan and makes it harder to tell which result belongs to the change you are checking.
This creates three different checkpoints for your review: whether the request was submitted, whether the scanner work completed, and whether the corresponding vulnerable item update has been imported. Keep those checkpoints distinct in handoff notes. They answer different questions and can occur at different times.
Vulnerable items transitioning to Closed/Fixed are imported during the next scheduled Tenable.io or Tenable.sc integration import. A completed rescan therefore does not mean that the vulnerable item has already received its later imported state. Check the integration import timing before describing a pending record update as a failed remediation.
Review the vulnerable item lifecycle when interpreting the record state alongside the scan evidence. This makes it clear whether the remaining work concerns scanning, importing, or investigating a finding that still needs attention.