To investigate Tenable integration run status, open All > Tenable Vulnerability Integration > Integration Run Status with the Vulnerability admin role. Point to a chart segment for its summary, then click a bar to inspect the underlying list. Compare completed runs, vulnerable item counts, and process messages before deciding what needs correction.
Open the Tenable chart and define the investigation
Start with the symptom you need to explain: a failed import, an unexpected vulnerable item count, or uncertainty about whether a run completed. These questions require different evidence. A chart can locate the affected run; the detailed list and process record help establish what happened within it. Write down the integration and the run you are investigating before drawing conclusions from the dashboard totals.
The role required to view this Tenable dashboard is Vulnerability admin. Navigate through All > Tenable Vulnerability Integration > Integration Run Status. If the person investigating cannot reach that module, resolve access for that action before treating the missing view as an import problem. Persona and granular roles can affect what users can see and do in Vulnerability Response.
Check the interface against your instance and release once at the start. The dashboard is available in the New Experience UI beginning with Vulnerability Response version 19.0. Tokyo can show the dashboards in the Next Experience UI with some functional loss. Record the application version and interface when escalating a navigation or interaction problem.
Move from integration run status to Tenable run details
Use the graph in two passes. First, point to the part that interests you. The summary describes data belonging to that part of the chart. Then click the relevant bar to open a detailed list. A summary helps identify where to investigate; the list provides the records needed to narrow the explanation.
- Locate the relevant integration in Last 30 days Tenable Results.
- Point to the bar associated with the result you want to inspect and read its summary.
- Click that bar to open the detailed list.
- Use Tenable Integration Runs to examine the integration run records.
- Record which run supports your conclusion so another administrator can inspect the same evidence.
Last 30 days Tenable Results covers completed integration runs and includes successful and failed runs. A bar represents a run. Do not treat the presence of a bar as proof of success: the results include failures too. Establish the outcome from the selected data before discussing whether the imported volume was expected.
- Last 30 Days Tenable New VIs: the number of new vulnerable items imported during the reporting window, displayed as an integer.
- Last 30 Days Tenable Updated VIs: the number of updated vulnerable items imported during that window, also displayed as an integer.
- Last 30 Days Tenable Unchanged VIs: the number of duplicate vulnerable items imported during that window, displayed as an integer.
All three reports use the same last 30 days window and show integer counts, so read them together only when they cover the same period. In most investigations, setting a 30-day item total beside the count from one run produces a comparison that looks precise but does not isolate that run.
For example, if the question is why a completed import produced few new vulnerable items, inspect the updated and unchanged reports before calling the import empty. That is an investigation sequence, rather than a guarantee that existing items explain a particular result. Tie the explanation back to the affected run and the available record details.
Avoid adding these report totals together and presenting the result as a detection count without further evidence. Vulnerable item reports and detection records answer different questions. If the investigation also involves reference vulnerability data, keep that work distinct; see the NVD and CWE import topics for that neighboring workflow.
Reconcile detections after the import finishes
Detection or finding counts can change while an integration is running. Make a provisional observation during execution, then perform the reconciliation after completion. Otherwise, a comparison between one changing count and another observation taken earlier can create a discrepancy that does not describe the completed import.
Compare the relevant detections or findings with ServiceNow detection data in sn_vul_detection. The Tenable Integration Runs report displays the detection count in the Till date count column after the integration run completes. Use that completed-run context when recording the comparison, rather than treating an intermediate observation as the final imported total. The Tenable Integration Runs list holds the run records, so open the run you are checking there and read its Till date count before writing down the comparison.
Prepare the reconciliation with three explicit details: which run completed, which source detections or findings you compared, and which ServiceNow observation you used. Keep the reporting window consistent. If the numbers differ, preserve those details and investigate the difference rather than changing configuration immediately to make the displayed totals agree. Keep each claim at the level of evidence it rests on: a chart segment supports a statement about that segment, a run list supports a statement about completed runs, and an item count supports a statement only about the items counted.
Also separate successful ingestion from remediation progress. Establishing that data arrived answers the import question; deciding what to prioritize next requires a broader vulnerability workflow. The vulnerability and exposure response overview provides a route into that wider subject after the run evidence is settled.
Interpret a Tenable.sc expired-token message in context
When a Tenable.sc integration run fails, its authentication token expires automatically and a message appears on the Vulnerability Integration Process record. This can happen after a failure for any reason. An expired-token message therefore needs to be read alongside the failed process; it does not, by itself, establish that authentication caused the original failure.
A new token is generated automatically for the next integration process. The Vulnerability Integration Process tab on the Vulnerability Integration Process record includes both failed and successful processes. Inspect the sequence so that an earlier failure and a later process are not described as the same event.
For the handoff, distinguish the observed failure from the token consequence. Record the affected process, its message, and what the subsequent process shows if one is available. This keeps a request for investigation specific. Avoid prescribing a manual token replacement from the expiration message alone, because automatic regeneration is already part of this Tenable.sc behavior.
If repeated problems require a coordinated review, retain the run and process evidence before discussing changes. For help planning this work, see ServiceNow implementation.
Close the investigation with evidence another person can follow
Write the outcome as a short sequence: the symptom reported, the chart segment selected, the run examined, and the evidence that explains the result. Keep observations separate from proposed actions. A failed run is an observation; a suspected cause needs supporting process detail. A later successful process is additional evidence, not a reason to erase the earlier failure.
Use a focused handoff when the explanation remains incomplete. Include the integration name, run identity, relevant reporting window, report labels, completed detection comparison, and any Tenable.sc process message. State the question that remains unresolved. In most reviews, a focused handoff record is easier to follow than a screenshot of the full dashboard without context.
Keep the original Tenable run evidence available. A broader review of Vulnerability Response health then starts from a symptom that can be reproduced, rather than from the dashboard as a whole.
Questions when comparing Tenable with other integration dashboards
These are the comparison points an administrator usually raises when a Tenable run is read beside another scanner’s dashboard. Each answer depends on what the named report actually counts.
Can a Qualys Updated items count be treated as a unique record count?
No. For Qualys, Updated items counts update operations. A record updated twice contributes two updates. When comparing scanner dashboards, establish the meaning of the selected column before using it to compare imported volumes.
Does an absent Rapid7 run prove that no run occurred?
No. The Rapid7 Integration Runs list filters runs when New CIs, Existing CIs, New Items, and Updated Items are all zero. That filtering rule belongs to Rapid7; do not use it as an explanation for an absent Tenable record.
Does Prisma Cloud Compute include configuration item reporting?
Yes. Last 30 days Prisma imported CIs reports configuration items imported over that period. Include the report name in comparisons so a configuration item total is not presented as the equivalent of a Tenable vulnerable item total.
Can Microsoft TVM performance charts establish Tenable throughput?
No. Microsoft TVM has ingestion performance and throughput reports associated with its integration. Their presence does not establish that the Tenable chart has identical metrics. Evaluate a proposed comparison against the reports available for each integration.