Exposure assessment software in ServiceNow helps teams assess vulnerable software and identify affected configuration items. Deactivating software by a publisher stops its delta processing and removes it from the active software list. Use this control to change assessment coverage deliberately, then refresh the view and verify the Active column before handing over the work.
Set the scope before changing assessment coverage
Start with the question the team needs to answer: which publisher or software product needs assessment, and should it remain under active assessment? A request to stop tracking a publisher has a different operational purpose from a request to assess a particular product version. Write that purpose down before changing a record.
Exposure Assessment includes Assess by Publisher, Assess by Software and Assess by CVE views within Vulnerability Assessment Workspace. The steps below cover the first two. Use the publisher view when the assessment decision concerns software by a publisher. Use the software view when you need to select a product and its identifying details.
The navigation and controls below can vary by instance and release, so check them on yours before changing coverage. For assessment scope decisions that also involve ownership or readiness, see ServiceNow assessments and readiness.
Deactivate software by a publisher and verify the change
Once a publisher’s software is set to inactive, the platform stops running delta processing on it and the software no longer appears in the active list. Treat this as a coverage decision. Record why continued assessment is being stopped and who agreed to the change, so a later analyst can distinguish an intentional exclusion from an overlooked record.
The role required for this publisher activation and deactivation action is sn_vul_analyst.vul_event_manager. Follow this sequence:
- Navigate to Workspaces > Vulnerability Assessment Workspace > Exposure Assessment > Assess by Publisher.
- Select the active software by the publisher that the decision covers.
- Under Reassess, select Deactivate.
- Reload the view and confirm the Active column now reads false for that publisher.
Selection deserves a separate check before the action. Compare the requested scope with the selected software rather than relying on the publisher name alone. After refreshing, record the observed status in the handover. The changed Active value gives the next analyst something specific to verify.
To activate software by a publisher again, follow the same selection process and choose Activate. Plan that return alongside the original decision where possible. For example, a temporary pause should have an owner and a review trigger, so assessment coverage does not depend on someone remembering an informal conversation.
Handle a single software record separately
Software deactivation uses Assess by Software. Its required role is sn_vul_analyst.vul_event_manager. Navigate to Workspaces > Vulnerability Assessment Workspace > Exposure Assessment > Assess by Software, select the active software, and choose Deactivate. Refresh the page to see false in the Active column. To activate the software again, use Activate through the same process.
The effect is to stop further delta processing and remove the software from the active list. Make the scope visible in the change record: a particular software selection and a publisher assessment should not be described interchangeably. That wording matters when another team later asks why a product is absent from active assessment.
A sensible verification note includes the software identity, the selected view, the action taken, and the status observed after refresh. Teams coordinating these decisions with remediation can use vulnerability and exposure response as the next planning topic.
Add the intended software exposure assessment
For a publisher assessment, the required role is sn_vul_analyst.vul_event_manager. Open Workspaces > Vulnerability Assessment Workspace > Exposure Assessment > Assess by Publisher > New. In New assessment, select the publisher, choose a date in CVE published from, and select the CVE severity level in CVE Severity. Then select Start assessment.
The date deserves attention: software is considered for exposure assessment when an associated CVE has been modified after the selected date. Do not assume the field label alone fully describes that selection behavior. Record the date and severity choices with the reason for the assessment, particularly when comparing results from two different runs.
Assessment records appear only after the background job finishes, so do not treat setup as complete until they are visible. Allow for that completion before treating the assessment setup as finished. A handover that records the chosen scope but does not check whether records were created leaves the receiving analyst with an unresolved step.
For a specific software assessment, the required role is also sn_vul_analyst.vul_event_manager. Open Assess by Software > Add within Exposure Assessment. Complete Publisher, Product, Version, and Edition on the form, then select Add. Review these identifying details before submitting, especially where several versions or editions share a similar product name.
For software already listed, select its check box and choose Reassess. Review the updated information in the respective columns. Use this review to confirm that the selected software matches the question being investigated. When identification work extends into inventory ownership, see hardware, software, and cloud asset lifecycle.
For help planning this work, see ServiceNow implementation.
Check affected configuration items before handing off
An assessment handover should identify the affected configuration items, or CIs, that another team needs to investigate. The exported sheet lists each affected CI alongside its owner, which gives the incident team what it needs to open tickets for the assets that are actually exposed during a zero-day event. Keep the assessment scope attached to that export in the handover.
The required role for exporting impacted CIs from Assess by Publisher is sn_vul_analyst.vul_event_manager. The export action from Assess by Software requires the same role. In the relevant view, select the discovery model for the record whose CIs you need.
Open Software Installations and inspect Installed on. The tab contains active CIs associated with the software record, and Installed on holds those CIs. Compare this selection with the software under investigation before producing the export. A correctly generated file can still support the wrong investigation if the starting record was wrong.
Select Export, choose File Type and Delivery Type in the Export dialog box, and select Export again. Include the software identity and assessment context when sharing the resulting information internally. That context helps recipients understand which decision the asset list supports.
Create vulnerable items with a clear handover decision
Creating vulnerable items, or VIs, is a separate action available from either assessment view. The required role for creating VIs from Assess by Publisher is sn_vul_analyst.vul_event_manager. Creating them from Assess by Software requires the same role.
- Open the assessment view and select the records that need VIs.
- Select Create Vulnerable Items.
- In Create vulnerable items, choose Existing vulnerability or New vulnerability.
- Select Create Vulnerable Items to complete the action.
Agree which vulnerability choice fits the investigation before submitting. The people who review these VIs suggest which patch or alternative fix the IT team should apply, so keep the affected software and CI details attached to the VIs when you hand them over.
For repeatable decision records around assessment scope, see risk assessment and control testing. A concise handover can record the scope decision, observed Active status, assessment selections, and the next owner without recreating the investigation narrative.
Before closing the handover, have the receiving analyst identify the next action in their own words. This review can expose an unclear scope or missing owner while the assessment details are still available to the person who performed the work.
Questions about assessment exceptions and review
What happens if I add software that already exists with a false status?
Adding that software does not produce a duplicate record. The existing software record changes to true. Check for an existing inactive entry before planning a separate record, and explain the intended return to active assessment in the handover.
Does a false Active value prove that patching is complete?
It establishes the assessment status after deactivation. Use a separate remediation acceptance check to decide whether patching work is complete. Keeping those decisions distinct prevents an assessment coverage change from becoming accidental evidence of a completed repair.
What should a reviewer ask before approving a temporary pause?
Ask which software the pause covers, why assessment should stop, who owns the decision, and what event will trigger review. These are recommended governance checks that make a temporary exclusion understandable when the original analyst is unavailable.
How should a team compare two assessment handovers?
Compare the selected publisher or software identity and the recorded date and severity choices before interpreting differences in the findings. If the scopes differ, resolve that difference first. Otherwise, a change in assessment inputs can be mistaken for a change in exposure.