To verify integration run vulnerable item detection data, open the relevant integration, select its Vulnerability Integration Runs tab, and locate the VINTRUN record by scan date and time or run number. Check State, then review Configuration Items, Items, and Detections before tracing selected results to individual vulnerable item records.
Locate the integration run vulnerable item detection results
Start with a specific scan window. Record the integration name, the date and time you expect, and any VINTRUN number available from a vulnerable item or detection record. These details help distinguish the run under investigation from another run of the same integration. A scanner name alone leaves too much room to inspect the wrong result.
Reviewing integration run records requires sn_vul.vulnerability_admin or sn_vuln.admin, and the official role line marks sn_vuln.admin as deprecated. The separate detection-viewing workflow identifies sn_vuln.admin for initiating integration runs and viewing detection data, and sn_vul.remediation_owner for viewing data on assigned vulnerable item records. Assign the run-record permission and the detection-viewing permissions as separate grants.
Use the navigation route for the integration you are checking:
- Rapid7: Rapid7 Vulnerability Integration > Administration > Integrations.
- Qualys: Qualys > Qualys Vulnerability integration > Primary Integrations.
- Tenable: Tenable Vulnerability Integration > Administration > Integrations.
- Microsoft TVM: Microsoft TVM Vulnerability Integration > Administration > Integrations.
Select the relevant integration. For Qualys, distinguish Qualys Host Detection Integration from Qualys Comprehensive Host Detection Integration. For Rapid7, distinguish the vulnerable item, resolution, comprehensive, and API integrations rather than assuming their results describe the same import activity.
At the bottom of the integration record, select Vulnerability Integration Runs. Open the required run through Number or Import Source. Match its date and time to your investigation notes, then inspect State to establish whether it ran successfully. Check navigation and available fields on your instance and release; the workflow described here follows Brazil behavior.
Separate configuration item counts from vulnerable item activity
Select Configuration Items before interpreting vulnerability totals. New CIs counts configuration items created during the run. Existing CIs counts those already present. Imported CIs gives the sum of the fields in that section. Ignored CIs remains 0 for Vulnerability Response integrations.
These figures describe the asset side of the import. They do not tell you how many distinct scanner occurrences were recorded. If the investigation concerns which asset a finding belongs to, review the CI relationship separately from detection volume. The Common Service Data Model integration patterns page provides context for that wider relationship review.
Next, select Items. New items counts vulnerable items created by the run. Unchanged items identifies existing vulnerable items whose relevant field values did not change. Imported items combines the fields in this section. Duplicate items is no longer populated, so it should not become a pass-or-fail test for the import.
Updated items measures update events rather than distinct vulnerable items. A vulnerable item updated twice contributes two to this field. Treating that count as a list of unique affected records can overstate how many separate items changed. Use individual records when the review requires identities rather than activity totals.
A vulnerable item and a detection represent different levels of detail. Several scanner occurrences can belong to one vulnerable item. Record CI counts, vulnerable item activity, and detection activity in separate parts of your review so that an apparent mismatch does not become an unsupported failure diagnosis.
Read detection counts without treating them as unique findings
Open Detections to inspect the run’s detection activity. This tab appears when the run has detections. Its absence is a reason to verify the selected run and its contents before drawing a conclusion about the scanner’s wider coverage.
New detections counts detection records created during the run. Unchanged detections covers existing detections with no relevant field changes. Updated detections counts how many times detection records were updated. As with Updated items, repeated updates to a single record contribute repeatedly.
Include Ignored detections when reconciling the displayed counts. That field was added in Vulnerability Response v15 to account for detections previously ignored by the run counters. Add the figures shown in the Detections section to assess its recorded detection activity; do not substitute the Items total.
Fixed detections are excluded from these displayed detection counts because they are used to update existing vulnerable items. Consequently, the visible totals are not a complete inventory of fixed scanner records. Keep a scanner export comparison separate from a comparison of the VINTRUN counters, particularly when the scanner result includes closure activity.
A review note should explain the unit being compared. Write whether a figure represents new records, unchanged records, or update events. If two reports disagree, first ask whether one counts distinct records while the other counts processing activity. That question can resolve a discrepancy without changing integration configuration.
Trace the run to the scanner evidence on a vulnerable item
After checking the run totals, inspect selected vulnerable items associated with the investigation. Open a vulnerable item record and select Detections. Each row represents a distinct detection. Compare Source, First found, and Last found with the scanner and scan period you intended to verify.
First found identifies when the scanner first detected the item; Last found identifies its latest detection date. Neither should automatically be treated as the integration processing timestamp. Keep those scanner observations alongside the VINTRUN date and time rather than replacing one with the other in your evidence notes.
Use Port, Protocol, IP address, Proof, and other available detection details to test whether you are examining the expected occurrence. An empty detection column means the scanner did not detect data for that field. A blank value alone does not establish that the integration discarded an incoming value.
Open a detection through its Status entry to inspect the record details. Compare the current detection information with Initial Detections, which retains the data from the first occurrence rather than changing with subsequent detection updates. This comparison helps separate historical evidence from the current scanner observation.
For Qualys, scanner Results appears as Proof on the detection record rather than in the upper portion of the vulnerable item record. A review restricted to the top of the form can therefore miss relevant evidence. Look at the detection row before reporting that proof is absent.
Explain state changes before accepting the run
Detection information drives vulnerable item state. Scanner data opens or closes detections; a vulnerable item state change does not roll down to its detections. When all detections for a vulnerable item close, the vulnerable item reaches Closed/Fixed. When every vulnerable item on a remediation task is closed, the remediation task moves to the Inactive state.
A newly created matching detection can reopen a vulnerable item previously closed with a fixed or stale substate. A reopened item therefore needs a comparison with the later scanner evidence, not an assumption that the earlier closure failed. Review the detection dates and relationship to the affected CI and vulnerability.
Also consider automatic closure when investigating a state discrepancy. Auto-Close rules can close stale detections and vulnerable items associated with retired CIs. Check auto-close rules and retired-CI closure settings before attributing a state change to the latest integration run.
If discrepancies continue, document which stage needs examination: asset matching, vulnerable item changes, detection activity, or scanner evidence. The data migration and import set integration patterns page can help frame the broader ingestion review. For help planning this work, see ServiceNow implementation.
Finish with a concise acceptance record: the integration and VINTRUN number, scan window, observed State, counters with their units, sampled detection evidence, and any unresolved difference. Successful execution and correct interpretation are separate checks. Preserve both so a later reviewer can understand why you accepted the run or kept the investigation open.
Questions about difficult detection comparisons
Can different Rapid7 NIC values explain additional detections?
Yes. Rapid7 InsightVM detection keys include NIC from Vulnerability Response v19.0. Similar incoming detections with different NIC values can create separate detection records. Compare the NIC evidence before labeling those records duplicates; NIC is not rolled up to the vulnerable item table.
Why might the top of a vulnerable item show older connection details?
The sn_vul.show_last_open_detection property defaults to false. Setting it to true allows fields such as IP address, SSL, Port, Protocol, NetBIOS, and Proof to reflect the last open detection after ingestion. Check that property’s value when comparing the form with detection rows.
Adding a business rule on the detection table slows ingestion.
A business rule on the detection table affects ingestion performance. Before adding one for troubleshooting, define which missing evidence it would collect and whether existing detection records already contain it. Avoid introducing processing work merely to duplicate the counters already available on the run.
Where can an administrator look when record processing fails?
Errors are logged during processing of scanner attachments and during creation or update of detections or vulnerable items. Identify which operation failed and preserve its context with the VINTRUN investigation. That gives the next reviewer a narrower starting point than a general statement that totals disagree.