To create or modify a record producer for legal services through Catalog Builder, choose the legal request or legal matter intake template, set the destination table, select its catalog and category, and configure access. Preview the intake form, then use Review and Submit to publish it in the selected catalog.
Choose the legal intake template and configuration role
Start with the outcome the employee needs to initiate: a legal request or a legal matter. That decision determines which template and destination table to review. A form that looks right can still create the wrong kind of record if its destination does not match the intended intake process.
The roles specified for creating or modifying this record producer are sn_lg_ops.request_config or sn_lg_matter.matter_config. Arrange the appropriate configuration access before starting. Keep those permissions separate from the user criteria that determine who can access the finished producer.
Legal Request Management installs two base system catalog item templates: Legal request intake form template and Legal matter intake form template. Select the template that corresponds to the intended record. Review its preview before accepting it, rather than choosing a template because its wording resembles another service.
Prepare a short configuration checklist: request or matter, destination table, catalog, category, intended audience, and employee entry point. This gives the reviewer concrete decisions to check. For the broader catalog structure around the form, see request fulfillment and service catalog.
The labels and defaults below match the current Brazil release. The same procedure appears in Yokohama and Xanadu, so check the template and controls on your instance before applying the sequence. Check the template and controls on your instance and release before applying the sequence.
Open Catalog Builder and create or modify the producer
There are two entry routes. From the application navigator, go to All > Service Catalog > Catalog Builder. From an intake form that already has a record producer selected, use the Edit in Catalog Builder related link. The second route helps you begin with the producer associated with that form.
- For a new producer, open the Dashboard tab and select Create a new catalog item.
- For an existing producer, open the Catalog items tab and select the record producer from the list.
- Review the creation steps and select Continue.
- Select the relevant legal intake template, inspect its preview, and choose Use this item template.
- Work through the steps defined by the template and supply the required information.
When modifying an existing item, record its current destination, placement, and access choices before changing them. Use that comparison during review to distinguish an intended change from an accidental reset. The goal is a coherent intake definition, with the questions and destination serving the same legal service.
Keep the form description focused on what employees are asking legal to do. Ask whether someone unfamiliar with internal team names could recognize the right intake form. Broader naming and catalog design decisions belong in service catalog consulting.
Check Destination, Location, and Access together
In Destination, inspect Table. For legal requests, the default is Legal Request [sn_lg_ops_request]. For legal matters, it is Legal Matter [sn_lg_matter_matter]. A corresponding practice area table can be selected when required. Confirm the intended table explicitly before moving to presentation details.
In Location, inspect Catalogs and Categories. The default catalog is Legal Operations Catalog. The default category is Legal Request for requests and Legal Matter for matters. Different catalogs and categories can be selected to suit the service.
In Access, review both Available for and Not available for. For legal requests, the default Available for value is Users with legal_user role. For legal matters, it is Legal Matter Catalog. Preserve those names when reviewing the configuration so that the team checks the actual selected criteria.
Select criteria for the users with specific roles who should receive access, and configure exclusions for those who should be denied access. If neither option contains user criteria, access is granted to everyone. An empty access configuration therefore needs an explicit decision rather than an assumption that the legal context limits the audience.
Review the three steps as one chain: the employee finds an item in a category, meets its access conditions, and submits information to the chosen table. As a recommended acceptance check, test with representative intended users and excluded users. Record the expected outcome before testing so that visibility does not become the sole measure of success.
Align the category with the legal practice area
If the required category does not exist or needs revision, category administration requires sn_lg_ops.legal_catalog_admin. Navigate to All > Legal Administration > Legal Catalog > Maintain Categories. Choose New to create a category or open an existing category to modify it.
Give Title a unique category name and select Legal Operations Catalog in Catalog. Review Description, which appears beneath the category name when selected on the Legal Service Portal. Set Active to make the category available on the portal, and use Parent when it belongs below another legal category. Select Submit after completing the form.
Associate the producer through the category’s Catalog Item related list. Also associate the category with the practice area. The relationship connects the practice area, record producer, and category; requests can then be assigned through that associated practice area. Do not treat a well-named category as evidence that this mapping is complete.
For review, write down the intended category and practice area alongside the producer’s destination. Compare the saved relationships against that small checklist. This makes a placement problem easier to separate from a destination problem without repeatedly rebuilding the form.
Save, preview, and publish the intake form
Select Save to retain changes within a step. Changes to item attributes are also saved when navigating to the next step. Before moving on, review the visible values, particularly where a template supplied a default that may not fit the intended service.
Use Preview to inspect the record producer. Check the intake wording against the service description and review what an employee must provide. As a design recommendation, remove questions that the receiving team cannot explain a use for, and clarify questions whose answers would be ambiguous to a requester.
In Review and Submit, review the record producer and select Submit to publish it in the selected catalog. Include the destination, location, and access decisions in that review. For help planning this work, see ServiceNow implementation.
Run the checks in a fixed order before you select Submit. Confirm that the Table value under Destination is the record type you chose at the start, that the Catalogs and Categories under Location are the pair you wrote down, and that the Available for and Not available for values under Access hold the role criteria you intend. If both access fields are empty, access is granted to everyone, so that outcome should be a deliberate choice rather than an omission.
Treat a change to the destination table as a change of record type, not a cosmetic edit. Test submissions created after the change will land in the new table, so repeat the test with the same scenario you recorded and compare the result against the earlier one. Changes made through the Catalog items tab follow the same steps as the original build.
After publication, perform an agreed test submission and inspect the resulting record. Compare its table and entered information with the expected intake outcome. If the item is hard to find or appears to the wrong audience, revisit placement and access separately. A wider review of existing catalog configuration can be organized through a service catalog health check.
Place the intake form in Employee Center
When Employee Center is the intended employee entry point, include its content placement in the completion checklist. Legal services there require Legal Service Delivery applications, the Employee Center plugin (sn_ex_sp), and the Employee Experience Taxonomy plugin (sn_ect).
Associate the legal intake content with a topic in the taxonomy. If the base taxonomy needs customization, duplicate it and make changes in the clone. Treat this as a separate placement decision from choosing a catalog category: both should reflect how employees look for the service.
Ask a representative requester to locate the form through the intended Employee Center topic, open it, and complete the agreed test. Capture whether the wording led them to the correct service. This checks the employee route alongside the producer configuration without assuming that catalog publication completes portal discovery.