OBLYTECH Logo
OBLYTECH Logo

Train the classification solution to predict the subcategory for Ethics Complaint

To train the classification solution to predict the subcategory for Ethics Complaint, open Ethics Complaints Sub-categorization in Predictive Intelligence, review its description input and subcategory output, and train it with at least 10,000 suitable records. Review the resulting class statistics, test complaint descriptions, and configure the corresponding business rule before expecting predictions during intake.

Prerequisites confirm the plugins and the ethics solution definition

The required plugins are Predictive Intelligence (com.glide.platform_ml) and Predictive Intelligence for Legal Service Delivery (sn_lg_pi). Installing them makes the legal solution definitions available, but the base definitions still need training on your instance. Finding a definition in the list does not mean a usable model has already been produced.

For the ethics-specific training procedure, the Zurich, Yokohama, Australia and Brazil topics list sn_lg_pi.admin and platform_ml_read, while the Xanadu topic lists sn_lg_pi.admin only. The latter is spelled that way in the prerequisite; verify the corresponding role record on your instance before assigning access. The general classification creation and training procedure requires admin or ml_admin. Match access to the action and check the form behavior on your instance and release.

  1. Navigate to Predictive Intelligence > Classification > Solution Definitions.
  2. In Classification Definitions, locate Ethics Complaints Sub-categorization.
  3. Check that the definition name is ml_x_snc_sn_lg_pi_global_ethics_complaints_sub_categorization.
  4. Open the definition and review its current values before changing its configuration.

Keep the intended output clear. Ethics Complaints Sub-categorization predicts a subcategory from the description. Ethics Complaints Assignment predicts an assignment group using description and subcategory. Selecting the assignment definition would change the question the model is being asked to answer. General legal request definitions also have a different input combination. The assignment definition carries the internal name ml_x_snc_sn_lg_pi_global_ethics_complaints_assignment, which differs from the sub-categorization name in step three. On the definition form, verify the default field values before you customize the solution. Record the definition name before and after any change so the change record shows what was edited.

The table, input, output and filter determine the training examples

Start with the existing definition rather than creating another record with a similar label. Review Table to establish which records supply the examples, Output Field to establish the prediction target, and Fields to establish the inputs. For this task, preserve the distinction between the complaint narrative and the subcategory it should predict.

The ethics solution uses description as its input. Do not add unrelated inputs simply because the general classification form supports them. An input should contain information available when a prediction is needed. A field completed later during investigation can make a training example look informative while leaving intake with no comparable information.

Review the Filter against the historical records that will actually be selected. The ethics classification requires at least 10,000 training records. That minimum is a readiness check, not evidence that the descriptions or subcategories are reliable. Examine the selected records for missing narratives, obsolete subcategories, and labels that reviewers have not yet settled.

A sensible preparation approach is to favor completed work with dependable target values and a range of descriptions for each intended subcategory. Remove records whose labels no longer reflect the classification scheme. Use relative date conditions when a rolling training window is appropriate, so scheduled retraining does not keep selecting an unchanged historical period.

Review the distribution by subcategory as well as the overall count. In the general classification training behavior, a class with fewer than 30 examples is excluded from training and appears among the excluded classes in Solution Statistics. A large dataset can therefore leave a small but operationally important subcategory uncovered.

Agree who resolves uncertain historical labels before training. That decision belongs with the complaint classification process, because the model learns from the values selected for it. Broader ownership decisions can be organized through a governance model for risk and compliance.

Intake fields must reach the description the solution reads

Inspect how the complaint narrative reaches the record used by the definition. The standard Ethics Complaints intake form includes Complaint type, Detailed description, Involved parties, and Provide the approximate date and time of the incident. Detailed description captures the incident narrative, including where and when it occurred.

Treat the form label and the model input as separate checkpoints. Confirm that the submitted narrative reaches the description field selected by the solution. A populated intake form is insufficient evidence if its text is stored somewhere the model does not use. Review a submitted record alongside its intake values before proceeding.

The Anonymous Report Center portal needs a separate check because its active record producer determines the visible fields. With the producer mapped to Ethics [sn_lg_ops_ethics], the form includes Complaint type, Detailed description, Involved parties, Approximate date of event, and a sensitive-information acknowledgment. With the producer mapped to Universal Request [universal_request], it includes Summary of complaint and Detailed description.

Compare representative submissions from the intake routes your organization uses. Check whether the narrative survives record creation and any subsequent mapping. Do not assume that two forms displaying Detailed description feed the same training table in the same way. This trace is especially valuable when training appears healthy but new submissions receive poor predictions.

Keep intake changes within the complaint process rather than asking employees to supply a predicted label themselves. For related process review, see governance, risk, and compliance best practices.

Training results show whether the solution is usable

After checking the selected data, review Processing Language and Training Frequency. Processing Language should reflect the dominant language of the dataset. Training Frequency defaults to Run once, which gives the administrator an opportunity to assess the first result before arranging repeated training. Consider a schedule after the definition and data selection are stable.

Use Save & Train when that control is available for the existing definition. The general classification procedure also provides Submit & Train when creating a definition. Confirm submission with OK in the Training Activation window. Training is scheduled with a training service; completion arrives through a notification that can also report errors.

When training finishes, inspect Class Confidence in Solution Statistics for precision and coverage. Review individual subcategories rather than treating an overall impression as acceptance. A class can be represented heavily in the data while another has weak coverage or was excluded. Record which subcategories are acceptable and which need better examples or corrected labels.

The Solution Visualization tab presents a bubble chart of estimated class precision, coverage, and distribution. Use it to identify where a large class dominates the dataset or where a smaller class needs attention. These estimates help prioritize review; they do not replace testing the complaint language that intake actually receives.

In Test Solutions, enter values for the configured input fields and inspect the prediction output. For this definition, test description text. Include concise reports, longer narratives, and descriptions that could plausibly fall into adjacent subcategories. Compare the result with a classification agreed by the legal process owner and record the reason for disagreements.

For help planning this work, see ServiceNow implementation.

Configure regulation categories and subcategories for complaints

Regulation categories and subcategories tell the complaint service which regulation a case may breach or affect. A category names the regulation itself, and each subcategory sits beneath one category to record the product involved and the specific problem. Complaint service cases with regulatory impact draw on these records,.

The procedure requires the sn_bom_compl.admin role. Check that the account making the changes holds it before you start, and make the changes inside the Complaint Management application where these administration entries live.

  1. Go to All > Complaint Management > Administration > Regulation category and select New.
  2. Enter a suitable name in the Category name field and submit the record.
  3. Go to Complaint Management > Administration > Regulation subcategory and select New.
  4. Complete the form fields and submit.

The subcategory form has four fields. Code holds the product code linked to the regulation, when one exists. Regulation category identifies the category the subcategory belongs to. Description describes the product, such as mutual funds. Problem describes the issue, such as disclosure of fees.

Create the category first, because the procedure associates each subcategory with a regulation category.

Prediction behavior depends on the business rule and the description field

A trained solution and an operational prediction trigger are separate parts of the configuration. Legal Service Delivery includes the Ethics Complaints Sub-categorization use case under All > Legal Administration > Legal AI Configurations. The ethics configuration also needs a corresponding business rule to complete the solution and use case.

Review the rule against the intended ethics records and the point at which their description is available. Do not substitute the general legal request subcategory rule merely because its purpose sounds similar. Document the triggering conditions and expected field outcome so a test can distinguish a model problem from a rule that did not run.

  • If the definition is unavailable, check the two plugin prerequisites and action-specific access.
  • If training cannot proceed, inspect the selected record count and whether the filter returns suitable examples.
  • If a subcategory is missing, review excluded classes and the examples available for that label.
  • If testing produces a prediction but intake does not, trace description mapping and the corresponding business rule.

Keep these findings with the change record so later retraining has a clear baseline. A review of common governance, risk, and compliance mistakes can help frame the process checks around the configuration.

A predicted subcategory is a routing aid, not a finding, so it should not decide whether an allegation is valid; that assessment stays within the complaint review process. Before the workflow is enabled, the configuration administrator and the legal process owner should agree the test complaints and unresolved labels they will review together.