OBLYTECH Logo
OBLYTECH Logo

Review control requirements generated for a control objective

To review compliance impact on control requirements, open the control objective and inspect the requirements generated for its associated controls. Check each requirement’s status, attestation outcome, issues, and inheritance before interpreting the compliance score. A failed requirement can leave its control non-compliant even when a separate control test passes.

Establish what the control objective should generate

Begin with the CAM view of the control objective. The Control objective requirements related list defines the requirement records from which control requirements are generated. These are separate from the requirements attached to an individual control: the objective supplies the definition, while the control carries the requirement that must be assessed.

Check the Create control requirements option and the contents of the related list together. Selecting the option does not produce requirements when the objective has no control objective requirements. Creates controls automatically governs automatic control creation when an entity is associated. Treat these as separate checks when investigating a control with an empty requirements list.

Generation also depends on the control’s lifecycle position. If generation was initially disabled, selecting Create control requirements and saving the objective can generate the missing requirements for associated controls that are active and in Draft. A control outside Draft does not receive those requirements through that change until it returns to Draft.

For an authorization package, check the transition from Select to Implement alongside the generation option. This is the point at which controls and their requirements can be generated from the selected setup. Compare the expected objective requirements with the resulting records instead of assuming that a completed package transition proves the requirement list is complete.

These behaviors describe Brazil. Check the form view and behavior on your instance and release before changing a live assessment. If the review exposes broader access questions, use the security and access requirements workshop questions to organize them separately.

Review each requirement before reading the score

Open an associated control and inspect its Control requirements related list. Use Number to identify the individual requirement record and Requirement number to connect it with the underlying requirement reference. Include Control, Description, Status, State, and Frequency in the review so that a similar description does not conceal a different control association.

  1. Match the control’s requirements against the objective’s expected requirements.
  2. Read Status and State separately; a lifecycle transition does not by itself establish compliance.
  3. Check the requirement’s Attestation and Attestation respondents values.
  4. Inspect Additional comments and Activities for changes affecting the requirement’s history.
  5. Record unresolved issues and inherited dependencies before explaining the control’s result.

Keep a review note for each discrepancy: the requirement reference, the observed result, and the next investigation. This is a suggested review method rather than another application setting. It helps distinguish a missing generated record from an existing record that failed its assessment.

The Control objective form exposes Compliance Score (%). Read this alongside the contributing controls rather than treating the percentage as a substitute for their details. A requirement-level failure can explain a control-level result, but these checks do not establish a separate numerical weighting formula for individual requirements. Avoid assigning a percentage impact without tracing the relevant score calculation.

Trace attestation failures to their issues

The Take attestation at requirement level option determines whether attestations are sent for requirements instead of the control as a whole. In the Control form, review this option in the Attestation related list. A user added as an attestation respondent must have the sn_grc.user role, because only users with that role can be added as respondents.

With requirement-level attestation selected, attestations go to the respondents for the individual requirements. A completed attestation moves its requirement to Review whether the outcome passes or fails. The control reaches Review after its requirements have completed attestation and reached that state. Review therefore indicates progress through the workflow, while Status carries the compliance result.

A requirement attestation failure creates an issue with Issue source set to Requirement Attestation Failure. In the Issue form, the Control/Risk field in the Details related list identifies the requirement reference. Follow that reference when investigating the failure so the response addresses the requirement that caused it.

Issue closure needs a second check. A response of Remediate with state Closed Complete can restore the requirement’s compliance when no other open issue remains on it. Accept records acceptance of the continuing issue; closing it does not make the requirement compliant. Review the response and remaining issues together before reporting recovery.

Where assessment assignment needs attention, the control attestation assignment and review guide provides a related route for organizing that work.

Explain why the control remains non-compliant

A non-compliant requirement makes its associated control non-compliant. Restoring one requirement does not settle the control’s overall result. Check that no open issue remains on the control and that none of its other requirements is non-compliant. An inherited requirement belongs in this check as well.

A passed indicator task does not erase an unresolved requirement failure. The same distinction applies to a control test: a passing test can coexist with a non-compliant control because a requirement still needs to be made compliant. Investigate the failing requirement before repeating a test that has already passed.

For example, consider a control with several requirements where a single requirement failed attestation. The review should trace that failure to its issue, establish whether remediation or acceptance was recorded, and inspect the other requirements. Reporting only the later passing indicator would leave out the reason the control remains non-compliant.

For controls and requirements in Draft or Attest, passing attestation can establish compliance. For those in Review or Monitor, the Back to attest transition allows a further attestation. Plan that transition deliberately: lifecycle movement affects the associated requirements, and returning a control to Draft cancels its attestation. Record why a transition is needed before using it to address a failed result.

For help planning this work, see ServiceNow implementation.

Check inherited requirements and common control effects

An inherited requirement introduces a dependency on its provider. If an inherited requirement of a hybrid control retires, an automated issue can identify Provider Control Retired in Issue source. Inspect the Activity related list for the accompanying message before deciding whether to change the provider or convert the requirement to self implementation.

Modifying the requirement setup through the authorization package requires sn_irm_cont_auth.system_owner. Navigate to All > Continuous Authorization & Monitoring > All Authorization Packages, select a package in Implement, and use its Controls related list to open the relevant control and requirement.

Change Provider opens the Inherit from Common Control popup, where Common control list supplies the provider selection and Confirm applies it. Changing the provider does not automatically make the requirement compliant. A hybrid control must retain both inherited and self implemented requirements, so examine the allocation before changing the last requirement of either kind.

Common controls also affect reliant entity scores. Active associated common controls contribute to compliance scoring, and changes to control compliance status or weighting trigger recalculation for the relevant entities. Adding or removing reliant entities, retiring a common control, and converting it to a standard control also affect recalculation. Distinguish a provider change from evidence that the resulting compliance status has recovered.

When control evidence includes access configuration, the ServiceNow access controls review can support that separate investigation. Keep the finding tied to the generated requirement it is intended to satisfy.

Requirement history and lifecycle changes leave records to check

What happens when an objective requirement is removed?

The corresponding existing control requirement is retained and marked as a Manual requirement. A newly created control receives the objective’s remaining requirements. Compare the creation history before treating different lists on older and newer controls as a generation fault.

Why can a requirement description lag behind its objective?

Description updates flow to the corresponding requirement while the control is in Draft. For a control in another state, the update occurs when it returns to Draft. Check the control state before replacing the text manually.

Can an inactive objective receive another requirement?

New and Edit are unavailable in Control objective requirements when the objective is inactive. An inactive objective requirement also cannot have a control objective added to it. If New or Edit is missing from the Control objective requirements related list, check whether the control objective is Active. New and Edit are unavailable while it is Inactive.

What happens if the parent control is deleted?

Deleting the control deletes its associated requirements. Retiring it instead moves the requirements to Retired. Consider the requirement history you need to preserve when choosing how to handle a control that is leaving use.

What should an upgrade review check?

For Brazil upgrades, NIST 800-53 revision 5 objectives have Create control requirements enabled by default, and requirements are created for their existing controls in Draft. Review that population separately from controls already further through their lifecycle.