In the Compliance Workspace, you can group two to thirteen control attestations from your My pending tasks tab into one grouped assessment. Choose Group assessments, pick a response type and a Group by criterion, then select Group. Only records in Ready to take or In progress status qualify.
What the attestation shows for each control
A control attestation carries more context than a single question. For the control category, the GRC attestation template shows control information as an assessment reference rather than as separate control and entity targets. When you open an assessment, the Details pane on the right fills with the control’s name, description, entity, control objective, status, owner, current compliance score, tier value, tiering assessor, enforcement and classification.
Those fields matter before you group. The Group by list offers Category, Entity and Control objective, and Entity and Control objective also appear in the pane, so you can check a record’s values before you select it. The field list can differ by release, so confirm which fields appear on your instance rather than assuming the list above applies to yours.
If the attestation itself is not set up yet, start with how to attest controls with an assessment method in the Compliance Workspace. Grouping assumes individual attestations are already in place.
Roles and record eligibility
Grouping from the Tasks page requires one of two roles: sn_compliance_ws.corporate_compliance_manager or sn_compliance_ws.corporate_compliance_analyst. A user with neither role cannot complete these steps, so check role assignments with an administrator before a review cycle starts.
Eligibility is narrower than the attestation list suggests. Only control attestations can be grouped on this page. Risk assessments, vendor assessments and privacy assessments are marked invalid. Before you select Group, confirm that each selected record meets these rules:
- The selection contains at least two records and no more than 13.
- Each record is in Ready to take or In progress status. Records in Complete or Canceled status cannot be grouped.
- Each record still has its original status when you select Group. A record that moves to being assessed after you select it, and before you select Group, cannot be grouped.
A common failure is a selection built earlier in the day, when a reviewer has since started one of the records. Re-check statuses on the list immediately before you choose Group. Review rules that depend on how a control is designed and assigned are covered in designing, assigning and reviewing control attestations.
Grouping assessments step by step
The steps below follow the Tasks page in the Compliance Workspace.
- Go to All > Policy and Compliance > Compliance Workspace.
- Open the Tasks page from the left pane.
- On the My pending tasks tab, select the attestation records you want to group.
- Select the Group assessments button.
- In the Group assessments pop-up, select a Response type.
- Select a criterion in the Group by list.
- Review the Group previews section before you continue.
- Select the Group button.
- Select the link in the confirmation message to open the grouped assessment.
Choosing a Group by criterion
By default, assessments are grouped by the metric type template. You can switch the Group by list to Category, Entity or Control objective. The criterion decides which records can sit together. When the selected records share the value you picked, they group. When they share none of the criteria on the list, none of them group.
Choose the criterion by what the reviewer will decide. When one metric type drives the whole selection, the default is the natural starting point. When several controls share one control objective, grouping by Control objective lets one reviewer work through a single set. Grouping by Entity suits records that sit under the same business entity. Check the preview after each change, because a criterion that fits your intent can still leave several records outside the group.
Before you settle on a criterion, count how many records each candidate value would produce. A set of two is quick to clear. A set near the thirteen-record ceiling asks one reviewer to hold a lot of context at once. When one criterion yields an oversized set, splitting the selection into two smaller sets on a second criterion is often easier to review than one large group.
Teams still deciding how control objectives should line up across their frameworks often need planning help before they reach this step. For help planning this work, see ServiceNow implementation.
Reading the Group previews section
The Group previews section lists the grouping details and each assessment with its link. It also gives a message for any record that cannot be grouped. Each message points to the check that failed: the Group by criterion, the status, the assignee or the evaluation method of the metric type. Read the message before you change the selection, because each check needs a different fix.
When only part of the selection fails, the preview shows how many assessments could not be grouped, and the Group button stays active so you can group the rest. When every selected record is invalid, such as a set of risk or privacy assessments, the Group button is inactive and no group can be created.
After the group is created
A successful grouping shows a message that the assessment group has been created, followed by a link. The link opens the list view of the grouped assessments. You can also select Grouped attestations in the left pane to find the set later.
Selecting a grouped record opens the Assessment Instance page, where you take the assessment. Work through the set in one sitting where you can, and confirm that each answer suits every record in the group before you move on.
Planning grouped reviews across a cycle
Grouping works best when it is planned before a review cycle opens. Start by listing the control attestations assigned to each reviewer and marking which ones share a metric type, an entity or a control objective. That list shows where a group will form and where it will break. Records that share a control objective but sit under different entities group only when the criterion you choose matches the overlap you need.
Schedule the grouping step before reviewers begin work where you can. Records already in Complete or Canceled status cannot be grouped, and a record that moves to being assessed after you select it cannot join the group. Grouping while more records remain in Ready to take status keeps the set closer to the size you planned.
Keep a short note of the criterion and response type each group uses. When a reviewer asks why records were combined, the note answers that without reopening every record in the set. Keep the note beside the link to the grouped assessment so the reason stays with the group.
Troubleshooting a selection that does not group
- Invalid record types. Risk, vendor and privacy assessments show as invalid. Remove them from the selection and handle them separately.
- Closed records. Records in Complete or Canceled status are not eligible. Reselect from the records still in Ready to take or In progress status.
- No shared value. The selected records share no value for the chosen criterion. Switch the Group by setting and review the preview again.
- Status change. A record that started being assessed after you selected it cannot be grouped. Select the remaining records again and group them, then assess the changed record on its own.
Labels and the path to the Tasks page have changed between releases. Check the steps on your own instance and release before you train a team on them.
Questions about grouping control attestations
Does grouping start from records assigned to other users?
Selection starts from the My pending tasks tab, so the records you can group are the ones listed there.
How does combining a user’s assessments differ from grouping on the Tasks page?
Grouping on the Tasks page works from a selection, a response type and a Group by criterion, and it previews each record before the group is created. Combining a user’s assessments works from the list of assessments assigned to one user, and it lets you assign a new name to the combined set. Use the Tasks page when the records must share a criterion. Use the combined list when you want a named set for one assignee.
What should I do with an invalid record that shows in Group previews?
Use the link next to the record in Group previews to open it and check its type and status. A risk, vendor or privacy assessment is not part of a control attestation group, so assess it on its own. A record that failed the criterion can also be assessed individually. Regroup the remaining records once the set is settled.
How should I name a combined assessment?
Name the set for the person who opens it next. A name that states the control objective or entity, and the review period, tells a reviewer what the set covers without opening it. If you leave the name blank in the Combine pop-up, the set takes the default name GRC attestation, which tells a reviewer nothing, so enter one every time. If the set supports SOX control testing, the setup behind those controls is covered in ServiceNow SOX compliance.