Group similar issues under a parent issue

You can group similar issues under a parent issue from the Compliance Workspace while you create a new issue. Open the Parent issue field, click the bulb icon to view similar issues, select the ones that share the same root cause, and add them to a new group or to an existing parent.

Grouping similar issues lets one fix cover several records

Some compliance and risk problems appear on many records at once. A patching gap, for example, can appear against each server in a fleet, and each server gets its own issue. When the cause is the same, the fix can often be applied one time. Grouping those issues under a parent lets your team resolve the shared cause at the parent level instead of working each record from scratch.

The option appears when you create an issue in three places: Policy and Compliance > Issues > Create New, Risk > Issues > Create New, and Audit > Issues > Create New. The grouping steps are the same in each area, so the main difference is the role you need to hold.

Decide whether grouping fits the issue

Grouping fits when one fix closes several records. It fits poorly when issues share a subject but need different remediation. Two access review issues might both involve the same application, yet one needs a corrected role assignment and the other needs a missing approval. Group the first kind of issue. Leave the second kind standalone and handle it on its own record.

A quick test: ask whether the person who fixes one of the issues would also fix the others without asking a new question. If the answer is yes, the candidates belong together. If the answer depends on details in each record, check those details first.

Confirm your role for the application you are using

Role requirements are set per product. Use the row that matches the area where you create the issue.

  • Policy and Compliance Management: compliance_admin, compliance_manager, or sn_compliance.user
  • Risk Management: risk_admin, risk_manager, or sn_risk.user
  • Audit Management: audit_admin, audit_manager, or sn_audit.user

Field labels and menu options can change with your release and with how your instance is configured. Match the steps in this guide against your own form before you train anyone on them.

Grouping an issue under a new parent issue

Open the similar issues list from the form

Create the issue from the navigation path for your area. On the form, locate the Parent issue field and click the bulb icon. The bulb shows similar issues that you can assign to a parent issue.

Check each candidate before you group it

Click the Information icon beside a similar issue to open its details, and use them to judge whether the candidate shares the cause of the current issue. Titles can match while the causes differ, so read the detail before you commit. Treat the list as a set of candidates rather than a decision.

Select the issues and choose a group

Select the similar issues you want to group with the current issue, then click Group. The Group field controls where they go. Choose Create a new group to start a new parent, or pick an existing group to add the issues to it.

Fill in the new group fields

When you choose Create a new group, three more fields appear.

  • New group: type the name of the new group.
  • Description: type a description of the group.
  • Assigned to: select the user to whom the group is assigned.

Click OK, and the selected issues join the new or existing group. Choose a name that states the shared cause, such as the control or the asset type, so the next person can judge a new candidate quickly.

Adding an issue to a parent that already exists

When a suitable parent already exists, you can attach the new issue through the similar issues list without creating a group.

  1. Navigate to the create form for your area and locate the Parent field.
  2. Click the bulb icon, then select Issues with existing parent from the Group with drop-down list.
  3. Click the similar issue you want to group with the current issue.

The parent issue of the issue you select becomes the parent issue of the current issue. You pick a member of the group, not the parent record itself, and the new issue takes on that parent. Before you pick a member, confirm that it shares the cause of the new issue, since the group’s shared fix will then cover both.

Checking that the grouping took effect

Open the Issues tab on the parent to confirm the new issue sits inside the group. Then check three things before you move on.

  • The issue appears on the Issues tab of the parent you expected.
  • The group’s assigned user is the person who will work the shared fix.
  • All members share the same cause.

If a check fails, correct the grouping rather than leaving it in place. A wrong member can make the parent look complete when the fix does not cover that record. If your process puts sign-off on the parent, see GRC issue workflows and approvals before the work closes.

Working a shared fix at the parent level

Once the group is set, the parent carries the shared work. Suppose five application servers report the same unpatched library. The team can apply one patch against the shared cause, then verify each member issue against its own server. Keep the parent’s description current, so that anyone reading it can tell which cause the group covers.

Note in each member issue why it joined the group. A short line is enough, and it saves the next reviewer from re-reading the parent to reconstruct the decision.

Keep the parent as the place where the shared remediation is recorded, and keep each member issue focused on confirming its own record. That split prevents one fix from being logged several times and keeps each record’s evidence tied to the server or control it describes.

Review the membership again once the group has a handful of members, because early choices set the pattern. A loosely related first member tends to attract more loosely related issues, and a short review catches that drift while it is still easy to undo.

Routing is a separate setup from grouping, so review it on its own. For background, see assignment rules and assignment groups in Vulnerability Response.

If your team already groups vulnerability findings with automated rules, compare those rules with the manual steps here and decide which one owns each group. The two approaches can overlap. For the automated side, see triage grouping rules in Vulnerability Response.

An issue also moves through states around this work. Read the issue management workflow before you change the status of a parent issue.

For help planning this work, see ServiceNow implementation.

Questions about similar issue scores and standalone issues

What does the confidence score on a similar issue show?

The score is calculated with a similarity definition included in the GRC: Predictive Intelligence application base system. Use it to shortlist candidates. It shows how closely an issue matches the current one under that definition, and it does not confirm that the causes match.

What is a standalone issue in the similar issues list?

A standalone issue resembles the current issue but is not assigned to a parent issue group. Standalone issues are the ones you can pull into a new or existing group, so they are the usual candidates when you start grouping.

Does closing a parent resolve the grouped issues at once?

Grouping lets one fix at the parent level address a shared cause, but each member still describes its own record. Confirm each member against the item it covers instead of assuming the parent settles it.

Should a new issue join an existing group or start its own?

Join the existing group when the new issue has the same cause as the members. Start a new group when the cause differs, even if the titles look alike. Open at least one current member before you decide, because the group name and description may not describe all members accurately.

What should I review when a group keeps growing?

Check that each member still shares the cause the group was created for. Then check that the group’s assigned user is still the right person to work the shared fix. If either answer is no, split the issues into a separate group instead of stretching the existing one.