Keep the answers from a workplace check connected to the findings and the work needed to address them. A ServiceNow safety inspection holds questionnaire responses, findings, root cause analysis, and follow-up actions together. Create the inspection in Health and Safety Workspace, choose its assessment, review the submitted answers, address the findings, and move it to Closed Complete after the inspection activities are finished.
Prepare the ServiceNow safety inspection around a defined scope
Start with the activity, process, or area you intend to inspect. A warehouse loading area is a clearer scope than a broad request to inspect workplace safety. Describe the boundary, the observations the inspector should collect, and the person who will review the results. This gives the questionnaire a purpose before you select it.
Health and Safety Risk Management supports workplace inspections and audits, including scheduling, assignment, questionnaires, findings, and actions. For the broader context around this work, see ServiceNow environmental, health, and safety management. Keep this inspection focused on the workplace condition you need to examine rather than expanding it into an unrelated review.
The steps below use Brazil behavior; check the labels and configuration on your instance and release before using them as an operating procedure. Creating and managing an inspection requires sn_hs_rm.safety_inspection_manager or sn_hs_rm.safety_inspection_writer. Access to a smart assessment from the inspection record has a separate requirement described below.
Create the record and choose the assessment
- Navigate to Workspaces > Health and Safety Workspace.
- Select the risk management icon, then open the Inspections list and select All.
- Select New and complete the inspection form.
- Enter the inspection format, the smart assessment or survey, the risk matrix for risk assessments, and the due date.
- Select Save.
Treat the questionnaire choice as a design decision. Use questions that let an inspector report observable conditions within the agreed scope. For example, a question about access to an emergency exit should make clear which exit is being checked. Avoid combining unrelated conditions into one answer, because the reviewer then has to reconstruct which condition caused the concern.
If a new smart assessment template is needed, a safety inspection manager or safety audit manager can configure it with the Health and Safety Risk Management application scope selected. Set its Purpose to Health and Safety and its Assessment target to Inspection [sn_hs_rm_inspection]. Add instructions and questions in the template designer, then choose the Assessment reader role under General settings. The selected role controls access to assessments using that template, including completion, assignment, and creating actions or findings.
The Assessment type determines the result tabs. A smart assessment uses Questionnaire results, while an inspection survey uses Inspection survey results. Both routes include Findings and RCA and Inspection actions. Check the assessment selection before assignment so the reviewer knows where the returned answers will appear.
Saving the inspection assigns the associated smart assessment or inspection survey for completion. The assigned user receives a notification. When the inspection format is digital, that notification includes a direct link to the assessment or survey. Ask the intended inspector to verify access before the scheduled inspection begins.
Collect responses without losing the inspection context
A smart assessment can be completed through mobile. An inspection survey can be completed through Employee Center or mobile. Agree which route the inspector will use during preparation, especially when the work takes place away from a desk. Test that route with the intended user rather than assuming a successful manager login proves the inspector can complete the assignment.
For an Employee Center survey, open Surveys under My active items, choose the assigned survey in My Assessments and Surveys, complete the safety walk and answers, and select Submit. The submitted results return to the originating inspection. Smart assessments and surveys can also be completed offline in Mobile Agent and synchronize when connectivity returns. When planning offline inspection assignment, cache the inspection records before going offline.
When reviewing submitted work, open Questionnaire results for a smart assessment or Inspection survey results for a survey. Read the responses against the inspection scope. A completed questionnaire can still leave an unanswered operational question: does the response identify the condition clearly enough for someone else to investigate it?
For a digital inspection, the workspace also offers Open inspection smart assessment or Open inspection survey. These controls appear when Inspection format is Digital. To access and complete the smart assessment through this route, the user needs the Assessment reader role configured for that smart assessment template. Do not infer that the inspection creation role grants this assessment access.
When reviewing, distinguish a negative answer from an unclear answer. A negative answer may describe a real condition requiring follow-up. An unclear answer may require clarification before anyone can decide what work is necessary. Keep the observed condition separate from assumptions about why it happened.
Turn inspection findings into a clear explanation
Use Findings and RCA to work on the inspection findings and perform root cause analysis. The finding should explain the condition identified during the inspection. Root cause analysis should then examine why that condition arose. Writing those as separate thoughts helps prevent a proposed fix from being mistaken for an explanation.
For a hypothetical blocked walkway, describe the location and obstruction before discussing the process that allowed materials to accumulate. Then investigate whether the cause concerns storage arrangements, work sequencing, or another factor. Use this reasoning approach to support your safety team’s assessment of the response.
Inspection agents can create question-specific actions and findings while completing a smart assessment or survey in the mobile app. For smart assessments, sn_hs_rm.safety_inspection_writer or sn_hs_rm.safety_audit_writer is required; the role must match or contain the template’s Assessment reader role. Configure which smart assessment questions allow action creation in the template. Surveys use a separate administrator configuration to determine which field types display the Create action check box. Creating an action for a question also generates a related finding based on the response. That finding appears in Findings and RCA in the workspace. Review these returned records before adding another finding for the same observed condition.
Use consistent descriptions when multiple people review the results. A reviewer should be able to connect the answer, the observed issue, and the proposed response without relying on a conversation that was never recorded.
Plan actions around the finding that needs attention
Add applicable actions for findings through Inspection actions. A finding can have multiple actions, so decide whether a proposed task addresses an immediate condition or a longer-term change. For example, clearing an obstruction and revising a storage process are different pieces of work, even when they relate to the same observation.
Question-specific actions created while completing a survey in Employee Center, or an assessment or survey on mobile, also appear in Inspection actions. For Employee Center survey completion, no role is required; do not apply the smart assessment role requirements to that survey route. Review that list before creating further work. Check whether two descriptions represent separate responsibilities or duplicate requests for the same correction.
For help planning this work, see ServiceNow implementation.
Before the first live inspection, define what a successful test should show: the intended user can open the chosen assessment, the inspector sees the expected questions, and the reviewer can locate submitted responses, findings, and actions. Include the final state change in this inspection-specific check.
Close after reviewing the inspection work
When all inspection activities are complete, open Details, set the state to Closed Complete, and select Save. This moves the inspection to Closed Complete. Make that state change the outcome of a review rather than the first step taken when the questionnaire arrives.
Before closing, check that the responses cover the agreed scope, the findings explain the observed conditions, the root cause analysis supports the proposed response, and the inspection activities have finished.
If follow-up work remains uncertain, resolve that uncertainty with the responsible people before treating the inspection as finished. A clear record should let a later reviewer understand what was inspected and what happened afterward without having to repeat the original inspection conversation.
Questions about inspection planning and collaboration
Can the same inspection include several safety agents?
Multiple safety agents can be assigned to an inspection record. A survey related to that record has one assigned agent at a time. Plan the handoff around that survey ownership so contributors know who is responsible for completing the current response.
How should recurring workplace checks be organized?
Use an inspection schedule when the same type of inspection needs to recur. Inspection scheduling supports future and recurring checks. Before configuring the schedule, agree the scope and questionnaire so repetition produces comparable observations rather than repeatedly collecting ambiguous answers.
Can an unfinished smart assessment be handed to another agent?
Online smart assessment work can be saved partway through and resumed later. To take over with Assign to me, the assessment must already belong to another safety agent or manager in your assignment group. You need sn_hs_rm.safety_inspection_writer or sn_hs_rm.safety_audit_writer, and that role must match or contain the template’s Assessment reader role. The new assignee can finish the unanswered portion of the questionnaire. Explain which areas have already been inspected and which observations still need collecting. Inspection surveys behave differently: partial survey responses do not transfer when another agent takes ownership. The new assignee must review the survey and restart it if necessary.