ServiceNow permit to work requests move from worker submission to an approver’s decision and then to permit issuance by a coordinator. Review the job’s risks and safety measures before approving. After approval, the coordinator reviews the safety requirements and issues the permit, making it active and available for the requestor to print.
Understand the ServiceNow permit to work handoff
Use the permit-to-work system to route hazardous work through a request, an approval decision, and a permit issued after checks on the job and site. The activities covered span different settings: work underwater or at height, excavation and lifting, electrical work and hot work, chemical handling, and entry into confined spaces. The worker carrying out a job with significant risk submits the request.
Keep three decisions distinct in your operating procedure: what work is being requested, whether the request is acceptable, and whether the permit is ready to issue. An approval records the approver’s decision. Issuance follows a coordinator’s review. Treating an approval message as the end of the process can leave the team without a clear handoff to the person responsible for issuing the permit.
The steps below follow the Brazil workflow. Check the navigation and available actions on your instance and release before using them in a local operating procedure. For implementation planning, agree who owns each decision and how workers will recognize the handoff between approval and issuance.
Prepare a request that an approver can assess
Before opening the approval task, establish what the reviewer needs to decide. The approver assesses the risks associated with the job and checks whether safety parameters are in place. As a working practice, describe the proposed activity clearly enough that someone outside the immediate crew can understand the job and the reason a permit is needed.
Use a short review agenda when preparing the request. Identify the activity, explain the relevant hazards, and make the proposed controls understandable. These are review recommendations rather than a list of required form fields. Avoid treating a completed request as proof that the work conditions have already been checked.
- Make the work scope specific enough to distinguish it from nearby or related activities.
- Identify what the approver should evaluate before deciding whether the request can proceed.
- Agree who will resolve questions about the job or safety arrangements.
- Agree who will ask the coordinator to issue the permit once approval is recorded.
If the discussion exposes a broader assessment problem, use risk assessment planning to frame that separate work. Keep the permit decision focused on the requested activity. A broad organizational risk discussion should inform the review without replacing the job-specific assessment.
Approve or reject the request in Employee Center
The role required to approve or reject a permit-to-work request is sn_hs_rm.permit_approver. The decision takes place through Employee Center. Before selecting an outcome, assess the job’s risks and check the safety parameters. Use the task to make an explicit decision rather than assuming that being assigned an approval means the request is ready.
- Navigate to All > Self service > Employee center.
- Select My tasks and locate permit approvals under the Open tab.
- Select the permit link to open the request for review.
- Review the permit details against the job and its safety arrangements.
- Add comments in the comments field of the approve request, then select Approve or Reject as appropriate.
Write comments that explain the decision in terms the requestor can act on. For an approval, describe the basis for accepting the request. For a rejection, identify the unresolved concern clearly. Avoid vague language that leaves the worker unsure which part of the request needs attention.
After the decision, the system records the permit as approved or rejected. The permit requestor can view the response in Employee Center under My Tasks. As a team practice, have the requestor check that response before arranging the next handoff. That way, the next person handling the request starts with the response the requestor has actually seen.
Review safety requirements and issue the permit
The role required to issue a permit is sn_hs_rm.permit_coordinator. A coordinator can issue it after the permit approver approves the request. This work takes place in Health and Safety Workspace. The coordinator reviews the safety requirements and can create a Health and Safety action, review the approvers, and review the checklist.
- Navigate to All > Health and Safety > Health and Safety Workspace.
- Select the risk management icon.
- In the Permit to work list, select All, then select the permit to review.
- Review the safety requirements, using the approvers and checklist as part of the review.
- Create a Health and Safety action if the review calls for one.
- Select Issue permit when the permit is ready to issue.
Issuing the permit changes its status to active. The permit requestor can then print it through Employee Center. Build that observable result into your handoff: ask whether the coordinator has issued the permit and whether the requestor can obtain the permit needed for the job.
Where the handoff is unclear, define the approval and coordination responsibilities before changing the workflow. Bring the intended review sequence, role ownership, and acceptance checks to the planning discussion. For help planning this work, see ServiceNow implementation.
Keep the decision trail understandable through completion
As a working practice, write the permit record for someone who was not present at the job. Give that reviewer enough context to understand the request and the reasons behind each decision. During an incident review or a legal check, unexplained comments leave questions that the people involved may no longer be available to answer.
For example, agree how a worker should raise a concern when the job no longer matches the conditions considered during review. Name the person responsible for evaluating that concern. These are process choices to settle with the safety team; a recorded approval should not become a substitute for supervision while the activity is underway.
When the job is complete, select Close permit. Include completion in the team’s handover checklist so the person managing the permit knows when the activity has ended. Keep comments factual and specific enough for someone reviewing the sequence later to understand why decisions were made. The coordinator’s further actions after closing also include Cancel permit for unsafe conditions. When writing the local procedure, describe the reason for each action so a person following it can distinguish a completed job from a safety concern needing attention.
If the wider governance team needs to examine how records support its review, plan that work alongside audit evidence and control tests. For a separate departure from an organizational policy, consider the policy exception process. Define those boundaries in the operating procedure so the permit review retains a clear purpose.
Check the handoffs before adopting the procedure
Walk through a representative request with the people who will perform the work. Start with the approver’s task, follow the response visible to the requestor, and then have the coordinator demonstrate issuance. Use this exercise to check understanding as well as navigation. A person who can find the request should also be able to explain which decision they are making.
Test the rejection path separately. Ask whether the comments give the requestor enough information to understand the concern. Finish with a completed-job example and identify who communicates completion to the person managing the permit. Record unclear responsibilities as process issues to resolve before relying on the procedure for live work.
Questions about permit review edge cases
Can the coordinator look up related knowledge during review?
Yes. Selecting the Agent assist icon is an optional step during the coordinator’s review. It searches the knowledge base using the permit’s Short description and displays relevant articles. Consider whether that description accurately represents the activity before relying on the relevance of the results.
What action is available if danger is expected after issuance?
After closing the permit, the coordinator has further actions available in the UI action menu. These include Suspend permit for danger expected after issuance, with suspension lasting until the inspection is completed. Include responsibility for that inspection in the local operating procedure so the next decision has an owner.
Can a permit request have a Health and Safety action?
Yes. A Health and Safety action can be added to a requested permit-to-work to help address the root cause of a reported safety occurrence. When planning how your team uses actions, describe the concern precisely enough that the person handling it understands the issue requiring attention.
Does the system cover underwater work as well as hot work?
Both working underwater and hot work are examples of potentially hazardous activities covered by the permit-to-work system. The examples also span excavation and chemical handling. Decide the local review requirements around the activity’s hazards rather than treating those different jobs as interchangeable because they share a permit workflow.