Post incident review assignment rules automatically add users or groups to a security incident’s PIR assessment list. Configure the rule’s conditions, select the reviewers, and activate it in Post Incident Review – Assessments Setup. Plan overlapping rules carefully: the first matching rule runs, so later matches do not add their own reviewers.
Plan post incident review assignment rules around the review audience
Start with the people who can explain the incident’s handling and identify changes worth making. A reviewer list might need specialists for a particular incident category, while another category needs a different team. Write down those audiences before configuring conditions. This turns the rule into an explicit decision about participation instead of a collection of names accumulated over time.
The assignment destination is the PIR assessment list. Keep the review audience decision separate from deciding who handles the incident itself. For background on assignment concepts, see ServiceNow assignment rules. Use the PIR configuration described here when your aim is to select assessment participants.
Prepare a small set of example security incidents with different categories and expected reviewers. Include an incident that should match a specialist rule, one that could match several rules, and one outside the proposed conditions. These examples become acceptance checks later. Record why each person or group belongs in the expected audience, so another administrator can assess the outcome.
Create the rule and select its reviewers
Creating a PIR assignment rule requires one of these roles: sn_si.admin, sn_si.manager, or sn_si.analyst. The steps below use Brazil labels; check the navigation and behavior on your instance and release before applying the configuration.
- Navigate to All > Security Incident > Administration > Post Incident Review – Assessments Setup.
- Find User Assignment Rules and select its Configure button.
- On Post Incident Review Assignment Rules, select New.
- Enter a Name that identifies the incident conditions and intended review audience.
- Set Active as appropriate and enter Order to position the rule.
- Build the Condition using the security incident criteria that should select this audience.
- Populate Assign to users, Assignment Group, or the reviewer selection needed for your design.
- Select Submit to save the rule.
Use the Name to make the decision recognizable in the rule list. For example, a name can combine a category with the specialist audience responsible for reviewing it. Avoid names that describe an individual test incident: the rule should remain understandable when it applies to subsequent records.
Once the Assign to users field is editable, you can add or remove multiple users, select roles, or enter user email addresses. Choose the selection method deliberately. A named reviewer expresses a specific participation requirement; a group selection delegates part of that decision to maintained membership. Record which approach the review owner expects and who will keep it accurate.
Assignment Group has an eligibility condition: active members with sn_si.analyst are added to the security incident’s post incident review. A group containing the right department names is insufficient evidence that the expected people qualify. Check the intended members’ active status and role before diagnosing an apparently missing group participant.
Resolve competing conditions before activating broad rules
Order controls how the rules appear, with lower sequence numbers first. The first matching assignment rule executes, and the users defined by that rule are added to the assessment list. Treat this as a choice between audiences when conditions overlap. Do not design a sequence that depends on several matching rules contributing additional participants.
Consider a hypothetical pair of rules: one selects specialists for a narrowly defined category, while another matches a wider set of security incidents. If the broad condition matches the same record earlier, the specialist rule will not contribute its reviewers. Work through that overlap before using the rules for a review.
List the expected winning rule for each example incident. Then compare its conditions with the rules ahead of it. Place a narrow rule before a broader one where that reflects the intended decision, or revise conditions to separate the cases. Avoid depending on equal Order values when designing a clear sequence; give administrators an unambiguous ordering to inspect.
One supported scenario uses Category set to Malicious code activity and adds selected experts when the security incident transitions to Review. Use a comparable controlled example to check the full outcome, including the record values at that transition. Merely inspecting the condition builder does not demonstrate that the intended reviewers appear.
Align the selected audience with categories and roles
Reviewer selection and questionnaire design need separate checks. A person appearing on the assessment list does not establish that the question set suits that person’s involvement. Review the category filters and role targeting alongside the assignment decision so the audience can contribute relevant answers.
Creating questionnaire categories requires sn_si.admin. Navigate to All > Security Incident > Post Incident Review – Assessments Setup, then select Configure in Assessment Questionnaire Configurations. Select New to create a category, enter its settings, and select Submit. The Name appears on the questionnaire, and Type defaults to Post Incident Review.
The category’s Filter determines when its questions are included. It can evaluate security incident data or linked record data. For example, a technical question category could be limited to a particular affected resource type. Keep this filter aligned with the incident population intended for the review rule, while documenting why the two conditions might differ.
Assigning PIR category roles requires admin. Navigate to All > Assessments > Metric Definition > Types, find a Post Incident Review record under Types, and open it. Assign the category’s roles and select Update. Then navigate to User Administration > Users, choose the user, and add the corresponding metric type roles to that user record.
Distinguish those metric type roles from the sn_si.analyst requirement for active group members. They support different configuration decisions. A validation note should identify the group eligibility check and the category role mapping separately, making it easier to locate the cause when someone is included but the intended questionnaire experience is missing.
For help planning this work, see ServiceNow implementation.
If the wider project also routes customer cases, keep that work in the separate case routing assignment rules configuration. Give PIR audience changes their own acceptance criteria so a successful routing test does not substitute for a reviewer-list check.
Validate the assessment list and investigate unexpected results
Run the prepared examples in a controlled setting. For each record, capture the incident values, expected matching rule, expected participants, and observed assessment list. Include a case where two rules could match. That case tests the audience-selection design more effectively than several records matching a single isolated rule.
If a reviewer is missing, first check whether the intended rule is Active and whether its Condition fits the incident. Next inspect the rules preceding it. If a group is selected, check the missing member’s active status and sn_si.analyst role. Investigate these selection inputs before changing the questionnaire itself.
If the participant list is correct but the questions are unexpected, examine category filters and corresponding metric type roles. Then inspect the questions within the category. Keep the evidence from each check: changing rule order and question settings together makes it harder to determine which configuration caused the result.
Record the approved audience, rule sequence, and test outcomes for subsequent maintenance. Revisit the examples when group membership, incident categories, or review responsibilities change. Teams also coordinating service restoration can use the separate major incident post incident review guidance to frame that neighboring review process.
Questions about maintaining the PIR questionnaire
Can an assessment ask a follow-up question after a particular answer?
Yes. With sn_si.admin, configure the question’s Depends on and Displayed when fields. This lets a follow-up appear for a selected response, such as asking which evidence was unavailable after a reviewer indicates a gap. Design the dependency around a decision the reviewer can answer clearly.
Can questions start with information from the incident?
Yes. A question can use Default answer from field or Default answer from script. Ask question determines whether to ask it regardless of the supplied answer or when the default is empty. Choose this while composing questions with sn_si.admin, based on whether reviewers should confirm existing information.
Why might a scripted metric be absent from the questionnaire?
Metrics using the Script method collect data through scripts and do not appear as questionnaire questions. Before treating the absence as an audience problem, inspect the metric’s Method. A collected measurement and a question requiring a reviewer’s response serve different purposes in the assessment.
What should a maintainer check before making a question mandatory?
Check its dependencies and data type first. Mandatory is available when Depends on is empty and the data type is not Checkbox. Reviewers cannot submit until mandatory questions have valid responses, so confirm that the intended audience can supply the requested information before introducing that requirement.