To generate a shift handover report for a security incident, open the incident in Security Incident Response Workspace and ask the AI agent in the ServiceNow Otto panel to add it to a handover. Select an accessible In-progress record, review the proposed content for each section, and approve the sections you want saved.
Prepare the shift handover before starting the chat
The Generate SIR Shift Handover Report workflow takes details from a security incident and proposes content for the sections of a shift handover. An analyst can request revisions before approving that content. This makes the conversation a controlled way to contribute incident information to a report that the incoming shift will use.
The chat needs a suitable destination. A security incident can be open and accessible while the intended handover is missing, assigned to another group, or still awaiting preparation. Establish the shift, template, and handover record before asking Otto to add incident details. Treat these as separate checks rather than assuming that access to the incident grants access to the handover.
The steps here follow Brazil behavior; check availability and labels on your instance and release. The workflow is enabled by default in this release. For the wider response process around the report, see security operations and incident response.
Check the role for the action
- The procedure for adding an incident through the Otto panel requires sn_si.analyst.
- Creating shifts and configuring handover templates require sn_escm_sh.shift_admin. The sn_si.admin role includes this role.
- Creating, editing, and deleting handover log records within a user’s groups require sn_escm_sh.shift_owner.
- The sn_escm_sh.shift_analyst role provides access to handover records and permits contributions to In-progress records assigned to the analyst’s group. The sn_si.analyst role inherits it.
The agent controls access through role masking in its security controls. Confirm which roles it accepts on your instance before assigning access to analysts.
Set up a report with sections the next shift needs
A shift administrator creates shift times in Workspaces > Security Incident Response Workspace > Administration. Select Shift Handover, then Shift Time Configurations, and select New. Enter the Shift name and fill Start Time and End Time before selecting Save. These times use the configured timezone, so check that the intended shift boundary is represented correctly.
For the template, go to Administration > Shift Handover > Template Configurations. Create a template with New or modify Sample Shift Template. Set its Name, Application, Active, and Description fields. A template must be active to appear for the Shift Owner when creating handover log records.
The Template field needs at least one section so analysts can contribute. Define sections with the syntax ${section:Section Label}. Choose labels that distinguish incident developments, unfinished work, and actions for the incoming team. Use Preview to inspect the runtime result, then Save. Clear section purposes give the reviewer a basis for deciding where generated information belongs.
The Shift Owner creates the destination record from the Security Incident List icon, then Lists > Shift Handover Records. Select New and provide Template, Description, User group, and Shift Name. Select Create. The initial State is Draft and cannot be changed during creation. Open the record and use Change to “In-progress” state when it is ready for contributions.
Before opening Otto, check the destination’s group and shift period against the incident you intend to discuss. A correctly formatted report attached to the wrong team is still a handover failure. For help planning this work, see ServiceNow implementation.
Add the security incident through the Otto panel
- Navigate to All > Security Incident > Security Incident Response Workspace. Open the security incident whose details belong in the handover.
- Select the ServiceNow Otto icon to open the panel. Ask the agent in natural language to add the current incident to a shift handover. Include the incident number when you want to identify the record explicitly.
- Review the destination offered by the agent. When several accessible In-progress handovers exist, it presents up to five for selection.
- Provide the shift handover record number and press Enter. The agent checks that the record is valid, is in progress, and is accessible to the logged-in analyst.
- Review the proposed section content. Request corrections, approve it, or skip the section as appropriate.
- Continue through the sections and examine the final summary of updated and skipped sections.
The agent checks that the handover record is valid, In-progress, and accessible to you before it generates any content. If several In-progress records are available to you, it lists up to five for you to choose from. Resolve the record identity before spending time reviewing generated prose; otherwise, the content may be prepared for a destination that cannot accept it.
A notification that no active handover records exist should lead back to the destination checks. Confirm that a handover exists, is In-progress, and is assigned to the analyst’s group. Starting a different prompt does not replace preparing an eligible record.
Review incident details before approving each section
Approval happens section by section. The agent saves approved content to the corresponding section before proceeding. Respond positively when the content is ready, or explain the revision needed. A request to distinguish completed containment from planned containment is more actionable than a general request to improve the summary.
Use the incident record as the basis for review. Check whether the draft accurately represents the current situation, what responders have already done, and what remains unresolved. Keep a proposed action distinct from an action recorded as complete. Where the incident details are unclear, resolve the ambiguity before treating the generated wording as a reliable handover.
Check placement too. A development from the outgoing shift and a follow-up for the incoming shift can describe the same incident, so ask for changes when one section mixes them. Keep proposed actions distinct from actions recorded as complete. A reader should be able to find the next action without reconstructing the conversation that produced the report.
Inspect the existing entry before agreeing. Decide whether the proposed addition supplies new information or repeats material the next analyst will already see.
For teams coordinating sensitive financial operations, carry these review decisions into the broader financial services incident response process.
Consolidate contributions and complete the handover
Saving incident content through Otto and publishing the completed Shift Handover report are separate steps. Check the agent’s final summary first. A skipped section needs an explicit decision: leave it unchanged because no contribution is needed, or complete the missing information before the handover moves forward.
Move the record to Review with Change to “Review” state. The Shift Owner reviews and edits the Consolidated shift report. If analysts need to contribute further, the owner can return the record to In-progress. Coordinate this transition: unsaved edits are discarded when a record changes from In-progress to Review while someone is editing.
If pending content updates prevent the transition to Review, wait 30 seconds and select the action again. Check the consolidated report after the contributions finish processing. Avoid treating a temporarily missing contribution as proof that the analyst failed to save it.
In Review, take care when merging lines or sections or removing a section, because those edits affect other analysts’ report content. Save the reviewed content and use Publish when the report is ready. The Shift Owner can modify content after publication, but cannot change the record state.
For handovers involving clinical services, align the incoming team’s follow-up decisions with the healthcare security incident response process. Keep the final review focused on what the receiving team must understand and act on.
Questions about maintaining the handover workflow
Can a team customize the agentic workflow?
Yes. Duplicate the workflow, adjust the duplicate’s settings, and activate that version. Before adoption, test the changes against the team’s section structure and review expectations so analysts understand the resulting conversation.
Why might a handover be absent from the workspace section?
The workspace section displays the last two handover records according to End date, State, and User group. Select View all to inspect the broader list before concluding that the record does not exist.
Can administrators write to records outside their user groups?
The sn_escm_sh.shift_admin role has write access to handover log records regardless of user group. That administrative permission is distinct from the group-based contribution access used by shift analysts.
Does the agent have a scheduled trigger by default?
The workflow runs on demand, when an analyst asks the Otto panel to add an incident. Adding a trigger is optional; an administrator adds one only to run the workflow automatically when an event occurs.
Must long-term memory be enabled for this agent?
Long-term memory is controlled under All > AI Agent Studio > Settings > Long-term memory. The option that lets AI agents retain user information defaults to Allow, so check it on your instance before deciding whether the agent should carry context from earlier interactions. Keep any decision to enable it separate from preparing shift templates and assigning handover records; it changes the use of previous interactions as model context.