From Configuration Compliance 11.1, the Identification and Reconciliation Engine (IRE) can create CMDB configuration items for scanner hosts that do not match Discovered Items or existing CIs. With CMDB CI Class Models active, these hosts enter Incomplete IP Identified Device or Unclassed Hardware, while identification and reconciliation rules govern matching and subsequent attribute updates.
What changes for configuration compliance CI creation
A scanner can report a host before the CMDB contains enough information to recognize it. Configuration Compliance needs a way to retain that host without treating a weak identifier as proof of an existing asset. The creation route matters because it determines where the record lands and how later data can be evaluated against it.
Before Configuration Compliance 11.1, a host without a match in Discovered Items or the CMDB produced an Unmatched CI. The newer route uses IRE to create a CMDB record in one of the supported classes. This gives the identification process a role in handling incoming host data rather than relying on a direct database insert.
The change concerns CI creation and identity. A created CI does not, by itself, demonstrate that a configuration test passed or that remediation succeeded. For the broader matching model, see how the Identification and Reconciliation Engine works.
The destination class depends on the CMDB app and the host data the scanner sends
Start by checking the Configuration Compliance application version and whether CMDB CI Class Models is activated. The newer classes depend on that plugin. Verify the class definitions on your instance and release before using table names in integration logic or operational reports.
Inspect the actual host information received from the scanner. An IP address alone leads to Incomplete IP Identified Device. Unclassed Hardware accommodates host information such as a host name, DNS, NETBIOS, or MAC address, with IP address also among the supported information. Distinguish the IP-only case from records that carry additional identity evidence.
- IP address alone: check for an Incomplete IP Identified Device record in cmdb_ci_incomplete_ip.
- Additional host identity: inspect the resulting Unclassed Hardware CI and compare its identity attributes with the scanner input.
- MAC address supplied: inspect the network adapter entry and its relationship to the Unclassed Hardware CI.
- IP and MAC addresses supplied: also check the related IP address CI.
Do not count related adapter or IP address records as duplicate host records merely because one scanner host produced several records. Their classes and relationships explain their purpose. During acceptance, record the main host CI separately from those related records so the reviewer can distinguish a duplicate identity from the expected representation.
Separate matching, update authority, and insertion policy
Identification answers whether incoming data refers to an existing CI. It uses identification rules and, where available, source identity information. Reconciliation answers whether a source may update particular attributes after a match. IRE data source rules add another decision: whether a source may create new CIs in a particular class.
These decisions need separate test cases. A scanner might be allowed to update an existing CI while being prevented from creating a new one. Conversely, successful insertion does not prove that subsequent updates will overwrite attributes owned by a different source. Reconciliation applies to updates of matched CIs; it is not applied when IRE inserts a new CI.
For a controlled test, select an existing CI whose identity the scanner can supply, then compare the matched record and the attributes accepted from that source. Next, select an unmatched host with sufficient identity information and examine the insertion result. Record the applicable source and class for both cases. The CMDB identification and reconciliation guide covers the surrounding rule design.
When reviewing custom payloads, examine source_name and source_native_key in sys_object_source_info as well as the class identification attributes. IRE can use the source identity pair for matching. Treat those values as part of the integration contract: changing their meaning between imports can change how a host is recognized.
A nonproduction sequence separates each identification decision
Use a nonproduction validation sequence that exposes the decisions separately. Identification simulation can construct a payload that is complete and valid for a chosen class, then simulate how the Identification and Reconciliation Engine processes it. The simulation does not commit anything to the CMDB. The identifyCI() API also evaluates identification without committing its result. These tools help investigate expected inserts and updates before a committing operation changes the CMDB.
- Capture a representative scanner host, including the identifiers actually present rather than identifiers added by hand for the test.
- Establish whether a corresponding record already exists in Discovered Items or the CMDB.
- Review the target class, identification criteria, source identity, and insertion policy.
- Simulate the applicable IRE payload and inspect the proposed result.
- Run the controlled import, then inspect the resulting host CI and related records.
- Repeat the same input and check whether the identity resolves to the intended CI.
Include a second-source update in the test set when another integration maintains the same CI. Compare an attribute the scanner may update with one controlled by another source. This tests reconciliation directly instead of inferring correct ownership from the existence of a record.
Keep the scanner input, resulting CI identity, resulting class, and update outcome together in the acceptance record. A successful import summary alone cannot show whether the right host was matched. For help planning this work, see ServiceNow implementation.
Unmatched CI records signal either a disabled class or a failed creation
Configuration Compliance uses Unmatched CI when the class plugin is inactive or IRE raises an exception while creating the CI. An Unmatched CI therefore deserves investigation even after the application version supports the newer route. Check plugin activation and the failed creation attempt before adjusting identification rules.
Separate fallback from an intentional insertion restriction. An IRE data source rule can prevent a source from creating a class while leaving its ability to update existing records intact. Weak matching information presents a different problem: IRE may lack the attributes needed to establish identity. Resolve the specific failure rather than broadening source authority to make an import pass.
Where an integration uses enhanced IRE processing, partial and incomplete payloads have different meanings. Partial items can be retained for possible completion when later data supplies missing information. Incomplete payloads retain irrecoverable items for logging and are not processed again. Inspect the processing route before assuming either mechanism explains a Configuration Compliance fallback.
Review duplicate and reclassification tasks when they arise during IRE processing. Duplicate tasks group suspected duplicate CIs for investigation. Reclassification tasks require a decision about moving a matched CI between classes when IRE cannot reclassify it automatically and the block is set through a glide.class.<operation>.enabled property. Keep the evidence from the import attached to that review so a class change does not conceal an unresolved identity problem.
Custom import sets need their own identification design
A separate import-set integration can apply IRE through CMDBTransformUtil in an onBefore transform script. The script calls identifyAndReconcile and sets ignore = true so the transform does not create the record again after IRE processing. This is a separate integration design decision, not an additional setup step implied by the Configuration Compliance feature.
For that import-set route, keep a single transform map associated with the import set. Mandatory field values still need attention: CMDBTransformUtil does not check that they are present, and the import fails if required values are missing. That route also does not support dependent CIs with dependent identification rules.
After identity handling is accepted, move to the work of addressing failed configuration checks. Use configuration compliance remediation to connect the finding workflow with the operational response.
Planning notes for the next import cycle
These are common design decisions for the next import cycle, not questions users have asked.
Should a new CMDB subclass receive separate identification rules?
A new CMDB table can inherit identification and reconciliation rules from its parent when those rules exist. Review that inheritance before adding class-specific rules. Create rules at the child or parent level according to the identity and update behavior the class needs.
Can dependent application CIs be identified by their path alone?
A path can repeat across hosts. Dependent identification uses the dependency context to distinguish those records. For example, identifying the host first can provide the context needed to distinguish an application instance from another instance with the same path.
Does identification simulation keep information about a run?
Each simulated payload gets a context ID, and each run of that payload gets its own run ID. The run view shows the input payload, the IRE log messages for the chosen logging level, and the output payload. Use those views to diagnose an identification result before relying on it in an integration.
Can partial records remain available indefinitely?
Partial payloads older than 90 days are deleted. If an integration depends on a later feed to complete identity information, include that retention window in the investigation plan. An unresolved feed should have an owner and a correction path before its supporting payload ages out.