EPSS is the Exploit Prediction Scoring System, a model that estimates the probability (from 0 to 100 percent) that a software vulnerability will be exploited in the wild. In Vulnerability Response, the EPSS integration imports these scores from First.org for CVEs and rolls them up to third-party entries (TPEs), so you can rank vulnerabilities by likelihood of exploitation alongside severity.
What the EPSS integration adds to Vulnerability Response
The integration brings EPSS data for common vulnerabilities and exposures into your instance, so prioritization can draw on a second signal next to severity. Severity describes how much harm a flaw could do if it were abused. EPSS describes how likely it is that someone will abuse it. Those are different questions, and the findings at the top of a severity list are not necessarily the ones attackers are likely to use first.
The integration adds EPSS details to the NVD data already in your instance rather than replacing it. When a CVE has no matching NVD record, the integration creates a placeholder in the CVE table and stores the EPSS details there. Typically, a placeholder lacks the descriptive detail NVD would normally supply, so treat its descriptive fields with caution until NVD data arrives.
On activation of the EPSS integration, three fields are added to the Vulnerability Entries table: EPSS Score, EPSS Percentile and EPSS Last Modified. For CVEs that already exist, these fields fill in when the initial import job completes. CVEs added to the Vulnerability Entries table after the EPSS scheduled job has finished are recorded with EPSS as their source, which lets you tell them apart from entries that came from another path.
Preparing the instance before the first import
The EPSS integration ships with the base system and is active by default, but it only runs once the Vulnerability Response Integration with CISA plugin is downloaded and activated. Confirm that plugin first. The order of the first run matters more than the activation itself, so settle the sequence before anyone imports scanner data. Follow these steps in order.
- Run the NIST National Vulnerability Database Integration – API (CVE only) before the EPSS integration. The recommended sequence puts NVD first because EPSS enriches NVD data, so the NVD records should already be in place.
- Open the EPSS integration record and leave the run-as user at its default value, VR.System. That value should not be changed.
- Run the initial EPSS import from the integration record by selecting Execute Now on the scheduled job, then watch the Vulnerability Integration Runs tab until the run completes.
- Import vulnerability data from third-party scanners after the EPSS import has completed, so the scores are in place when those records arrive.
Setup order is easier to get right when it sits inside the full project plan. For the phases around this step, read the Vulnerability Response implementation roadmap. For help planning this work, see ServiceNow implementation.
Initial import and the daily update schedule
The initial import fills the EPSS Score, EPSS Percentile and EPSS Last Modified fields for CVEs already in the instance. After that, EPSS updates run daily by default from the integration record. If you want them to run as a scheduled job instead, you need to configure the scheduled job that updates CVE records with EPSS data. Check which mode your instance uses, because the two settings control update timing.
How the base system runs EPSS alongside other integrations
After the initial run, the base system scheduled jobs run the integrations automatically and in order. You can also run an individual scheduled job by hand. Running one manually helps when you want to confirm a change without waiting for the next cycle.
Third-party libraries are updated by scheduled jobs too, so library data and EPSS data do not necessarily refresh at the same moment. When you compare a score with the data around it, read EPSS Last Modified first. Do not assume the score reflects the latest run of other jobs.
How EPSS scores roll up to third-party entries
EPSS scores on CVEs do not stop there. The base system includes a calculator named Rollup EPSS Scores from NVD to TPEs calculator, and it carries scores from CVEs in the NVD table up to existing TPEs. That roll-up is what places an EPSS value on the third-party entry itself, rather than leaving it on the CVE record alone.
You can modify the calculator by switching the form context menu from Default view to Rollup Developer View. Before you do, record the current scores on a small set of known entries. Then you can tell whether a later difference came from new data or from your edit. Vulnerability Response also includes other rollup calculators, so check whether any of them touch the same entries before you change the base calculator.
If you need a rule of your own, the related task to create a Vulnerability Response calculator is the place to start. Keep the new rule narrow, and test it against a few entries before it reaches a wider group.
Using EPSS scores to order remediation work
An EPSS score gives you a likelihood. It does not describe what a successful exploit would do on a specific system, and it does not show whether a compensating control already limits access. Put those facts beside the score before you decide anything. A workable starting point is to combine three inputs: the EPSS score, the severity you already hold, and how exposed the asset is.
One order you can adapt places high EPSS scores on exposed assets first, then high scores on internal assets, and sends high-severity findings with low EPSS scores to a separate review. Your risk owners should agree on that order and write it down, because the right order depends on your own risk tolerance, not on the score alone.
For the wider approach to ranking work in this area, see ServiceNow vulnerability prioritization. For the process around these decisions, see Vulnerability Response best practices.
Reviewing scores on a regular rhythm
Because EPSS updates run daily by default, a score you reviewed last week may have changed. Set a review rhythm that matches how often your remediation queue is worked. Reviews that run on a fixed cadence are easier to audit than ad hoc checks, and they keep the queue from drifting away from the current scores.
Checks to run after the first import
Confirm the results before you use the scores to order work. Run these checks in sequence on your instance, and note the release you are running, since field behavior can differ between releases.
- In the Vulnerability Entries table, confirm that EPSS Score, EPSS Percentile and EPSS Last Modified have values for CVEs that were in the instance before the import.
- Confirm that the scheduled job that updates CVE records with EPSS data is configured the way you planned, if you want daily updates to run without manual action.
- Check that the run-as user on the EPSS integration record still reads VR.System.
- Find a CVE added after the last EPSS job run and confirm that its source reads EPSS.
- Open a third-party entry whose CVE has an EPSS score and confirm the score appears on the entry.
If a check fails, fix the cause before the next scheduled run, so the scores you rely on are complete. For other setup pitfalls to watch for, see common Vulnerability Response mistakes and how to avoid them.
Questions about EPSS scores and the integration
Does an EPSS score replace severity when we rank findings?
No. Severity measures how much damage a flaw could cause, and EPSS measures how likely it is to be exploited in the wild. Keep both values in view when you decide the order of work.
Can we change the run-as user for the EPSS integration?
Do not change it. The integration record has a configured run-as user, and its default value is VR.System. If you think a different run-as user is needed, raise that with the person who manages your ServiceNow platform before you edit the integration record.
Do we need to install the EPSS integration before we can use it?
The integration is included in the base system and is active by default, but the Vulnerability Response Integration with CISA plugin must be downloaded and activated to enable it. Confirm both on your own instance before you plan the first import, because an instance that has been customized may be set up differently.
Should we edit the base rollup calculator or create a new one?
A change to the base calculator can affect the rollup across a large set of entries, so treat it as a wide change. If you need a rule for one group of entries, create a separate Vulnerability Response calculator for that purpose. Record baseline scores first, so you can measure the effect afterward.