Vulnerable item age measures how long a VI has been active in the Vulnerability Response application. Active VIs show the age in days, hours and minutes on the Vulnerable Items list and in the Age field of the record. Once a VI moves to Closed, the Age field is hidden and an Age closed value keeps whole days.
Where the age value appears in the application
The Vulnerability Response application shows age in two places. The first is the Age column on the Vulnerable Items list view. The second is the Age field on each vulnerable item (VIT) record. Both use the same Days/Hours/Minutes layout, so you can compare a list row with its record without converting units. A row for an active VI might read 21 Days 17 Hours 17 minutes, which tells you the item has been active for that span.
The list and the record differ once a VI closes. Age is displayed for active VIs, meaning any VI in a state other than Closed. Closed VIs show no value in the Age column, and their records follow the closed-item rules covered later on this page.
Vulnerable item age calculation and display on list rows and records
Reading age takes a few checks because the value depends on the state of the VI. Work through these steps for any VI you need to report on.
- Open the Vulnerable Items list view in the Vulnerability Response application.
- Check that the Age column shows days, hours and minutes. If it does not, read the upgrade section before you trust the values.
- Read the value on active rows. Rows in the Closed state carry no Age value.
- Open an active VI record and find the Age field, which uses the same format as the list.
The value on the list tracks active time, not a calendar date. If a VI was closed and then reopened, its count starts again from the date it was last opened. An age therefore will not line up with a calendar date on its own, and that is the first thing to explain when a stakeholder compares dates against the number on screen.
How the age value is calculated
The age value counts the days, hours and minutes that a VI has been active. The earlier approach used a scheduled job that recalculated age for all active VIs at once. With large numbers of VI records, that job could be slow and hurt performance.
The current approach calculates age on demand, which is more efficient, and displays it in more significant digits through an enhanced Age column. The enhanced column is added automatically when you install or upgrade the Vulnerability Response application, so you do not need a separate setup step for it.
How closed and reopened items handle age
The Age field is not displayed when a VI is in the Closed state. When the VI transitions to Closed, the number of whole days from the Age column moves into the Age closed field, and the hours and minutes drop out. For example, a VI that was active for 9 days, 18 hours and 29 minutes shows 9 in the Age closed field on its closed record.
If the VI is reopened, the Age closed field resets to 0 when the state returns to Open. The active age then appears again in the list and in the Age field, counted from the date the item was last opened.
Closed records need extra care in reporting. The Age closed value is a whole-day figure, so label the column as whole days in any report that also shows active items.
Roles that control who can see age
Age is read-only. The age column and the Age and Age closed fields cannot be edited. Viewing depends on the role a person holds, and each role has its own access:
- A vulnerability manager with the sn_vul.vulnerability_read permission can view the value.
- The Vulnerability admin persona can view the value.
- IT remediation owners with the sn_vul.remediation_owner role can view the value on records assigned to them.
Access is set through persona and granular roles, so what a reviewer sees depends on the roles assigned to them. A remediation owner sees age only on records assigned to them, so a team lead who needs the full population should hold a vulnerability manager or admin role instead.
Checking age after an upgrade
The enhanced Age column is added during install or upgrade. If either the list or the record still shows age in a format other than Days/Hours/Minutes, the age column is not current in your instance. Run this check before you rely on age in rules, filters or reports.
- Find an active VI in the Vulnerable Items list view.
- Confirm the Age column shows days, hours and minutes, for example 9 Days 18 Hours 29 Minutes.
- Open the same VI record and confirm the Age field uses that format.
- If either place does not, raise it with the person who manages your platform upgrades. Give them the release you upgraded to and the VI record you checked.
If the VI data itself looks out of date after an integration run, check that first. Verifying vulnerable item detection data after an integration run covers that step.
Using age in rules, filters, list views and reports
The finer format gives you more precise criteria than days alone. The application supports four main uses:
- Auto Delete Rules: target and delete specific VI records by Days/Hours/Minutes. Targeting at this level removes records with more accuracy, which may improve performance on instances with large numbers of VI records.
- Performance Analytics: view reports with more specific age detail for the Vulnerability Response application.
- Filters and list views: create filters that identify only the VIs you want, and prune list views so they display only those VIs.
- Dot-walking: move from related records to the age value more easily.
Auto Delete Rules remove records, so test the criteria before you activate a rule. Start with a narrow age range, review the records it targets, and widen the range only after the results match what you expected. Keep a note of the threshold you chose, because the next person to edit the rule will need it.
For active VIs, a filter that limits the list to the items you want gives a remediation team a repeatable starting point for its review. Pair that filter with the role check described earlier so each reviewer sees the rows that belong to them. For help planning this work, see ServiceNow implementation.
Planning an age-based review
Before a team sets an age-based target, settle a few details in writing:
- Decide which unit the review uses. Whole days suit closed items, while Days/Hours/Minutes suits active items.
- Confirm the upgrade check on this page has passed on your instance.
- Confirm that each reviewer has the role for the rows they will see.
- Choose a threshold and record it in the name of the filter or rule, so reports stay consistent over time.
The threshold itself is a team decision. Write down the reason for it, so a later review can tell whether the number changed or the process did.
Keeping age readings accurate
An age reading is only as reliable as the VI record behind it. Age is calculated per VI record, so if the same finding is tracked on more than one record, each copy carries its own age. Clear duplicates before you set age-based targets. Guidance on identifying duplicate vulnerable items covers that step.
State changes control when the counter starts and stops, so read how VIs move between states before you interpret a closed value. The states and their transitions are described in the vulnerable item lifecycle.
Common misreads of VI age
- Reading the Age closed value as a current age. It holds the whole days from the last active period and does not change after the VI closes.
- Looking for an Age value on closed rows in the list. Closed rows carry none.
- Treating a reopened item as if it kept its earlier active time. The count restarts from the date the item was last opened.
- Assuming the age column is current after an upgrade without checking the format.
Questions about VI age on custom states and closed records
Does a VI in a custom state show an age?
Yes, as long as the state is not Closed. The application treats any state other than Closed as active, so a custom state gets the Days/Hours/Minutes value in the list and on the record. If a custom state shows no value, confirm the state name before you assume the age column is at fault.
What does an Age closed value of 0 mean?
On a record that is currently Closed, the Age closed field holds whole days, so 0 means the VI did not reach one full day of active time before it closed. The field resets to 0 when a VI is reopened, so a 0 on an active record says nothing about the earlier closed period. The Age field is hidden on closed records, so the current active age only appears on an active record.
Should I check the upgrade before I build an age-based Auto Delete Rule?
Yes. A rule that targets Days/Hours/Minutes depends on the age value being current, so run the check in the upgrade section first.
Who should I ask when a remediation owner cannot see age on assigned records?
Start with the owner’s roles. The sn_vul.remediation_owner role gives access to the value on records assigned to that person, so confirm both the role and the assignment. If both are correct, ask the person who manages persona and granular roles for the application to review the owner’s access.